Similar Documents at Cook |
---|
Category:Memoranda
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21062A2552021-04-0707 April 2021 Federal Register Notice for Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Donald C. Cook Nuclear Plant; Memo to File ML20280A1812020-10-16016 October 2020 Insights Obtained from Review of D.C. Cook Seismic Probabilistic Risk Assessment ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 IR 05000315/20140052019-02-0505 February 2019 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-03; Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post Large-Break Loss-of-Coolant Accident ML17080A1192017-06-23023 June 2017 NRR Position on NCV 05000315/2014005-03; 05000316/2014005-003 Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15150A0352015-07-0808 July 2015 Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator ML15127A5692015-05-0707 May 2015 Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13161A3802013-06-12012 June 2013 Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 ML13011A3822012-12-0707 December 2012 Task Interface Agreement - Licensing Basis for Steam Generator Tube Rupture Event Coincident with Loss of Offsite Power (TIA 2012-11) ML12215A1562012-08-0303 August 2012 Memo Indian Michigan Power Company- Donald C. Cook Nuclear Plant, Unit 1 and 2 Revised Safety Evaluation Input - Cyber Security Program ML12144A3552012-05-24024 May 2012 DC Cook Physical Security Plan Review Memo for the Independent Spent Fuel Storage Installations Security and Verification of ASM Incorporation ML1211504272012-04-20020 April 2012 Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638) ML11115A0012011-04-26026 April 2011 Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection ML1016202942010-06-11011 June 2010 Project Manager Assignment ML0815606912008-07-11011 July 2008 Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006 ML0812802272008-05-0202 May 2008 Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications ML0809200582008-04-18018 April 2008 Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0732410262007-11-21021 November 2007 Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets ML0710603252007-04-17017 April 2007 Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors ML0623705122006-09-19019 September 2006 Memo: Summary of NFPA 805 Workshop at DC Cook ML0615202802006-06-0101 June 2006 DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8 ML0611504292006-04-25025 April 2006 Forthcoming Meeting with D. C. Cook Nuclear Plant, Units 1 and 2, Regarding Implementation of Degraded Voltage Protection Backfit ML0608301672006-03-23023 March 2006 D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003 ML0625401692005-09-30030 September 2005 Memo T. Boyce, NRR, to C. Carpenter, NRR, Fiscal Year 2005 Audit/Self Assessment & Evaluation of Quality of Plant Conversions ML0526305372005-09-22022 September 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. ML0513200192005-05-17017 May 2005 Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments ML0513201652005-05-12012 May 2005 5-12-05 - Results of the Severe Accident Mitigation Alternative (SAMA) Review for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0510901352005-04-15015 April 2005 E-mail Form T. Steingass to C. Lyon Donald C. Cook Unit 1, Request for Additional Information ML0434803502005-02-28028 February 2005 Response to Task Interface Agreement (TIA 2004-02), Request for Protection ML0504901422005-02-17017 February 2005 Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents ML0433403052004-11-30030 November 2004 Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant ML0432105772004-11-15015 November 2004 Audit and Review Report for Plant Aging Management Reviews and Programs at the Donald C. Cook Nuclear Power Plant, Units 1 and 2 ML0427904842004-09-23023 September 2004 Summary of Telephone Conference Held on September 7, 2004, Between the Us NRC and Indiana Michigan Power Company, Concerning Unresolved Items Pertaining to the Donald C. Cook Nuclear Plant, Units 1 & 2, LRA ML0427902732004-09-22022 September 2004 Summary of Telephone Conference Held Between the U.S. Nuclear Regulatory Commission and Indiana Michigan Power Company, Concerning Follow-Up Items to Request for Additional Information Pertaining to DC Cook, Units 1 & 2, LRA ML0424406712004-08-31031 August 2004 Summary of Telephone Conference Held on August 10, 2004 Between the U.S. Nuclear Regulatory Commission (NRC) and Indiana Michigan Power Company (I&M) Representatives Concerning Requests for Additional Information on Donald C. Cook Nuclear P ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0415902732004-06-0707 June 2004 TIA 04-02 Request for Technical Assistance Re Degraded Voltage Protection at D. C. Cook ML0510300282004-02-0909 February 2004 Receipt of Proposed Differing Professional View ML0335800462003-12-23023 December 2003 Transmittal of Final ASP Analysis of August 2001 Operational Condition at D.C. Cook 1 & 2 ML0324005922003-05-24024 May 2003 May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld ML0312105392003-05-0101 May 2003 Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement IR 05000315/20020092003-01-10010 January 2003 Memo 1/10/03, D.C. Cook, DRS Input to DRP IR 05000315-02-009 and 05000316-02-009 ML0300802552003-01-0808 January 2003 Report on Status of Open TIAs Assigned to NRR 2023-02-15
[Table view] |
Text
September 23, 2004 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE HELD ON SEPTEMBER 7, 2004, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND INDIANA MICHIGAN POWER COMPANY, CONCERNING FOLLOW-UP ITEMS TO REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Indiana Michigan Power Company (I&M) held a telephone conference on September 7, 2004, to discuss and clarify follow-up items to requests for additional information (RAIs) concerning the Donald C. Cook Nuclear Plant, Units 1 and 2, license renewal application (LRA). The conference call was useful in clarifying the intent of the follow-up items. provides a listing of the telephone conference participants. Enclosure 2 contains a listing of the items discussed with the applicant, including a brief description on the status of the items.
The applicant has had an opportunity to comment on this summary.
/RA/
Jonathan G. Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-315 and 50-316
Enclosures:
As stated cc w/encls: See next page
ML042790484 DOCUMENT NAME: C:\ORPCheckout\FileNET\ML042790484.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME JRowley MJenkins SLee DATE 9/234 9/22/04 9/23/04 DISTRIBUTION: Licensee: Indiana Michigan Power Co., Re: Donald C.Cook Plant, Units 1 and 2, Dated: September 23, 2004 Accession No: ML042790484 HARD COPY RLEP RF J. Rowley (PM)
E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis C. Li M. Itzkowitz (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff R. Gramm A. Howell J. Stang J. Strasma, RIII M. Kotzalas OPA NRR/ADPT secretary (RidsNrrAdpt)
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION SEPTEMBER 7, 2004 Participants Affiliations Jonathan Rowley U.S. Nuclear Regulatory Commission (NRC)
Hansraj Ashar NRC Neil Haggerty Indiana Michigan Power Company (I&M)
Bob Kalinowski I&M Enclosure 1
FOLLOW-UP ITEMS DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION SEPTEMBER 7, 2004 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Indiana Michigan Power Company (I&M) held a telephone conference call on September 7, 2004, to discuss and clarify follow-up items to RAIs concerning the Donald C. Cook Nuclear Plant, Units 1 and 2 (Cook), license renewal application (LRA). The following Items were discussed during the telephone conference call.
- 1. Follow-up Item to RAI 3.5-1 How many penetration bellows are in the Cook containments? Please summarize the operating experience related to the examination of these bellows. If provisions are made to assess their leaktightness (as they are not accessible for visual examination), please provide a summary of these provisions (including frequency of tests), and indicate if such leaktightness assessment of the bellows is part of the LRA aging management program (AMP) B.1.15 or B.1.8.
Staff Request I&Ms original response to RAI 3.5-1 indicates that the Cook containments do not have any containment pressure-boundary bellows. I&M is requested to confirm.
Status: The staff indicated to the applicant that the original response appeared contradictory to Table 3.5.2-1 of the LRA. Following an evaluation of the staffs position, the applicant stated that the response will be clarified. The applicant will submit a revised response.
- 2. Follow-up Item to RAI 3.5-2 For seals and gaskets related to containment penetrations, in Item Number 3.5.1-6 of the LRA, containment in-service inspection (ISI) and containment leak rate testing have been stated as the aging management programs. For equipment hatches and air-locks at Cook, the staff agrees with the applicant's assertion that the leak rate testing program will monitor aging degradation of their seals and gaskets, as they are leak rate tested after each closing. For other penetrations with seals and gaskets, the applicant is requested to provide information regarding the adequacy of Type B leak rate testing frequency to monitor aging degradation of seals and gaskets at Cook.
Staff Request Item II A3.3-a (Page II A3-5) of NUREG-1801 addresses the aging management of seals, gaskets, etc., which are part of the containment pressure boundary, i.e. seals and gaskets of equipment hatches, and mechanical & electrical penetrations. If I&M plans to monitor only air lock seals by means of containment leakage rate testing, then the applicant is requested to provide additional information regarding the aging management of seals and gaskets of equipment hatches, and mechanical and electrical penetration associated with the containment Enclosure 2
pressure boundary. If I&M credits containment leak rate testing program (Type B test of Appendix J) for aging management of these seals and gaskets, the applicant is requested to provide additional information as requested in RAI 3.5-2.
Status: The applicant indicated that the question is clear. The applicant will submit a revised response.
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III Michigan Department of Environmental U.S. Nuclear Regulatory Commission Quality 2443 Warrenville Road, Suite 210 Waste and Hazardous Materials Div.
Lisle, IL 60532-4351 Hazardous Waste & Radiological Protection Section Township Supervisor Nuclear Facilities Unit Lake Township Hall Constitution Hall, Lower-Level North P.O. Box 818 525 West Allegan Street Bridgman, MI 49106 P.O. Box 30241 Lansing, MI 48909-7741 U.S. Nuclear Regulatory Commission Resident Inspectors Office Michael J. Finissi, Plant Manager 7700 Red Arrow Highway Indiana Michigan Power Company Stevensville, MI 49127 Nuclear Generation Group One Cook Place David W. Jenkins, Esquire Bridgman, MI 49106 Indiana Michigan Power Company One Cook Place Mr. Joseph N. Jensen, Site Vice President Bridgman, MI 49106 Indiana Michigan Power Company Nuclear Generation Group Mayor, City of Bridgman One Cook Place P.O. Box 366 Bridgman, MI 49106 Bridgman, MI 49106 Mr. Fred Emerson Special Assistant to the Governor Nuclear Energy Institute Room 1 - State Capitol 1776 I Street, N.W., Suite 400 Lansing, MI 48909 Washington, DC 20006-3708 Mr. John A. Zwolinski Richard J. Grumbir Director, Design Engineering and Project Manager, License Renewal Regulatory Affairs Indiana Michigan Power Company Indiana Michigan Power Company Nuclear Generation Group Nuclear Generation Group 500 Circle Drive 500 Circle Drive Buchanan, MI 49107 Buchanan, MI 49107 Laura Kozak 2443 Warrenville Rd.
Lisle, IL 60532