ML121150427

From kanterella
Jump to navigation Jump to search

Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638)
ML121150427
Person / Time
Site: Cook, 07200072  American Electric Power icon.png
Issue date: 04/20/2012
From: Christian Araguas
NRC/NMSS/SFST
To: Wastler S
Division of Security Policy
Garcia-Santos N, NMSS/SFST 492-3290
References
TAC L24638
Download: ML121150427 (2)


Text

April 20, 2012 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Christian Araguas, Acting Chief /RA/

Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN OF DONALD C. COOK NUCLEAR PLANT (TAC NO.

L24638)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Review Donald C. Cook Nuclear Plant (D.C. Cook) response to Order (EA 039) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.

DOCKET NOS.: 50-315, 50-316, 72-72 TAC NO: L24638 LICENSE NOS.: DPR-58, DPR-74 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and security Order response for D.C. Cook Nuclear Plant supporting NRCs safety inspection prior to its loading campaign. Prepare a memorandum documenting the results of NSIRs review.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Norma Garcia Santos (301) 492-3290 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

April 20, 2012 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Christian Araguas, Acting Chief /RA/

Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW OF PHYSICAL SECURITY PLAN OF DONALD C. COOK NUCLEAR PLANT (TAC NO. L24638)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Review Donald C. Cook Nuclear Plant (D.C. Cook) response to Order (EA-11-039) and the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) and verify implementation of the additional security measures.

DOCKET NOS.: 50-315, 50-316, 72-72 TAC NO: L24638 LICENSE NOS.: DPR-58, DPR-74 REQUESTED ACTION: NMSS/SFST requests NSIR/DSP review of the PSP and security Order response for D.C. Cook Nuclear Plant supporting NRCs safety inspection prior to its loading campaign.

Prepare a memorandum documenting the results of NSIRs review.

Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _________________________________

NSIR/DSP Project Completion Date: _________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Norma Garcia Santos (301) 492-3290 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

Distribution: SFST r/f BBenney ADAMS Package:

OFC SFST SFST SFST NAME WWheatley (e-mail) NGarcia CAraguas DATE 4/20/2012 4/20/2012 4/20/2012 OFFICIAL RECORD COPY