Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23044A366 | 15 February 2023 | Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III | |
ML21062A255 | 7 April 2021 | Federal Register Notice for Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Donald C. Cook Nuclear Plant; Memo to File | Decommissioning Funding Plan |
ML20280A181 | 16 October 2020 | Insights Obtained from Review of D.C. Cook Seismic Probabilistic Risk Assessment | Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
ML20209A603 | 27 July 2020 | Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 | |
IR 05000315/2014005 | 5 February 2019 | NRR Position on NCV 05000315/2014005-03; 05000316/2014005-03; Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post Large-Break Loss-of-Coolant Accident | |
ML17080A119 | 23 June 2017 | NRR Position on NCV 05000315/2014005-03; 05000316/2014005-003 Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA | |
ML15237A336 | 2 September 2015 | Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld | Boric Acid Weld Overlay |
ML15150A035 | 8 July 2015 | Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator | Safe Shutdown High winds Ultimate heat sink Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Large early release frequency Turbine Missile Continuous fire watch Fire Protection Program Hourly Fire Watch |
ML15127A569 | 7 May 2015 | Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01) | Enforcement Discretion Functionality Assessment Backfit |
ML14023A387 | 30 January 2014 | Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event | Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
ML13161A380 | 12 June 2013 | Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 | |
ML13085A184 | 22 April 2013 | Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805 | Probabilistic Risk Assessment |
ML13011A382 | 7 December 2012 | Task Interface Agreement - Licensing Basis for Steam Generator Tube Rupture Event Coincident with Loss of Offsite Power (TIA 2012-11) | Time Critical Operator Action |
ML12215A156 | 3 August 2012 | Memo Indian Michigan Power Company- Donald C. Cook Nuclear Plant, Unit 1 and 2 Revised Safety Evaluation Input - Cyber Security Program | Cyber Security |
ML12144A355 | 24 May 2012 | DC Cook Physical Security Plan Review Memo for the Independent Spent Fuel Storage Installations Security and Verification of ASM Incorporation | |
ML121150427 | 20 April 2012 | Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638) | |
ML11115A001 | 26 April 2011 | Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection | |
ML101620294 | 11 June 2010 | Project Manager Assignment | |
ML081560691 | 11 July 2008 | Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006 | Significance Determination Process |
ML081280227 | 2 May 2008 | Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications | |
ML080920058 | 18 April 2008 | Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing | |
ML080740084 | 14 March 2008 | Draft Regulatory Guide for Comment | |
ML073241026 | 21 November 2007 | Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets | |
ML071060325 | 17 April 2007 | Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors | |
ML062370512 | 19 September 2006 | Memo: Summary of NFPA 805 Workshop at DC Cook | Safe Shutdown Internal Flooding Enforcement Discretion Multiple Spurious Operation Thermoset |
ML061520280 | 1 June 2006 | DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8 | Fuel cladding |
ML061150429 | 25 April 2006 | Forthcoming Meeting with D. C. Cook Nuclear Plant, Units 1 and 2, Regarding Implementation of Degraded Voltage Protection Backfit | Backfit |
ML060830167 | 23 March 2006 | D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003 | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure |
ML062540169 | 30 September 2005 | Memo T. Boyce, NRR, to C. Carpenter, NRR, Fiscal Year 2005 Audit/Self Assessment & Evaluation of Quality of Plant Conversions | |
ML052630537 | 22 September 2005 | Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors. | Boric Acid Coatings Foreign Material Exclusion |
ML051320019 | 17 May 2005 | Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments | |
ML051320165 | 12 May 2005 | 5-12-05 - Results of the Severe Accident Mitigation Alternative (SAMA) Review for Donald C. Cook Nuclear Plant, Units 1 and 2 | License Renewal |
ML051090135 | 15 April 2005 | E-mail Form T. Steingass to C. Lyon Donald C. Cook Unit 1, Request for Additional Information | Weld Overlay |
ML043480350 | 28 February 2005 | Response to Task Interface Agreement (TIA 2004-02), Request for Protection | Backfit |
ML050490142 | 17 February 2005 | Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents | |
ML043340305 | 30 November 2004 | Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant | |
ML043210577 | 15 November 2004 | Audit and Review Report for Plant Aging Management Reviews and Programs at the Donald C. Cook Nuclear Power Plant, Units 1 and 2 | Aging Management |
ML042790484 | 23 September 2004 | Summary of Telephone Conference Held on September 7, 2004, Between the Us NRC and Indiana Michigan Power Company, Concerning Unresolved Items Pertaining to the Donald C. Cook Nuclear Plant, Units 1 & 2, LRA | Aging Management |
ML042790273 | 22 September 2004 | Summary of Telephone Conference Held Between the U.S. Nuclear Regulatory Commission and Indiana Michigan Power Company, Concerning Follow-Up Items to Request for Additional Information Pertaining to DC Cook, Units 1 & 2, LRA | Aging Management |
ML042440671 | 31 August 2004 | Summary of Telephone Conference Held on August 10, 2004 Between the U.S. Nuclear Regulatory Commission (NRC) and Indiana Michigan Power Company (I&M) Representatives Concerning Requests for Additional Information on Donald C. Cook Nuclear P | Aging Management Fire Protection Program |
ML041740086 | 21 June 2004 | All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee | |
ML041590273 | 7 June 2004 | TIA 04-02 Request for Technical Assistance Re Degraded Voltage Protection at D. C. Cook | |
ML051030028 | 9 February 2004 | Receipt of Proposed Differing Professional View | |
ML033580046 | 23 December 2003 | Transmittal of Final ASP Analysis of August 2001 Operational Condition at D.C. Cook 1 & 2 | High winds Significance Determination Process |
ML032400592 | 24 May 2003 | May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld | Systematic Assessment of Licensee Performance |
ML031210539 | 1 May 2003 | Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook | |
ML051030051 | 13 January 2003 | Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements | Finite Element Analysis Earthquake |
ML023290377 | 13 January 2003 | Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement | Finite Element Analysis Earthquake |
IR 05000315/2002009 | 10 January 2003 | Memo 1/10/03, D.C. Cook, DRS Input to DRP IR 05000315-02-009 and 05000316-02-009 | High Radiation Area Locked High Radiation Area |
ML030080255 | 8 January 2003 | Report on Status of Open TIAs Assigned to NRR |