Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23044A36615 February 2023Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III
ML21062A2557 April 2021Federal Register Notice for Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Donald C. Cook Nuclear Plant; Memo to FileDecommissioning Funding Plan
ML20280A18116 October 2020Insights Obtained from Review of D.C. Cook Seismic Probabilistic Risk AssessmentProbabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
ML20209A60327 July 2020Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2
IR 05000315/20140055 February 2019NRR Position on NCV 05000315/2014005-03; 05000316/2014005-03; Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post Large-Break Loss-of-Coolant Accident
ML17080A11923 June 2017NRR Position on NCV 05000315/2014005-03; 05000316/2014005-003 Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA
ML15237A3362 September 2015Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket WeldBoric Acid
Weld Overlay
ML15150A0358 July 2015Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel GeneratorSafe Shutdown
High winds
Ultimate heat sink
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
FLEX
Large early release frequency
Turbine Missile
Continuous fire watch
Fire Protection Program
Hourly Fire Watch
ML15127A5697 May 2015Final Task Interface Agreement-Regulatory Position on Design Life of Safety-Related Structures, Systems, & Components Related to Unresolved Items at D. C. Cook, Monticello, & Palisades (TIA 2014-01)Enforcement Discretion
Functionality Assessment
Backfit
ML14023A38730 January 2014Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant EventFukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML13161A38012 June 2013Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1
ML13085A18422 April 2013Review and Conclusion of Indiana Michigan Power Company'S Resolution of Facts and Observations in Support of DC Cook'S Transition to NFPA 805Probabilistic Risk Assessment
ML13011A3827 December 2012Task Interface Agreement - Licensing Basis for Steam Generator Tube Rupture Event Coincident with Loss of Offsite Power (TIA 2012-11)Time Critical Operator Action
ML12215A1563 August 2012Memo Indian Michigan Power Company- Donald C. Cook Nuclear Plant, Unit 1 and 2 Revised Safety Evaluation Input - Cyber Security ProgramCyber Security
ML12144A35524 May 2012DC Cook Physical Security Plan Review Memo for the Independent Spent Fuel Storage Installations Security and Verification of ASM Incorporation
ML12115042720 April 2012Memo to S. Wastler Technical Assistance Request - Review of Physical Security Plan of Donald C. Cook Nuclear Plant (TAC L24638)
ML11115A00126 April 2011Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection
ML10162029411 June 2010Project Manager Assignment
ML08156069111 July 2008Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006Significance Determination Process
ML0812802272 May 2008Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications
ML08092005818 April 2008Summary of Phone Call with Licensees Concerning Sump Strainer Head Loss Testing
ML08074008414 March 2008Draft Regulatory Guide for Comment
ML07324102621 November 2007Notice of Meeting with D. C. Cook to Discuss Issues Concerning Ice Fusion in Ice Condenser Baskets
ML07106032517 April 2007Notice of Meeting with D. C. Cook Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors
ML06237051219 September 2006Memo: Summary of NFPA 805 Workshop at DC CookSafe Shutdown
Internal Flooding
Enforcement Discretion
Multiple Spurious Operation
Thermoset
ML0615202801 June 2006DC Cook, RAI, Shifting the Reactor Trip on Turbine Trip Interlock from P-7 to P-8Fuel cladding
ML06115042925 April 2006Forthcoming Meeting with D. C. Cook Nuclear Plant, Units 1 and 2, Regarding Implementation of Degraded Voltage Protection BackfitBackfit
ML06083016723 March 2006D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
ML06254016930 September 2005Memo T. Boyce, NRR, to C. Carpenter, NRR, Fiscal Year 2005 Audit/Self Assessment & Evaluation of Quality of Plant Conversions
ML05263053722 September 2005Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors.Boric Acid
Coatings
Foreign Material Exclusion
ML05132001917 May 2005Information Provided in E-Mail Dated April 20, 2005, for Donald C. Cook Nuclear Plant for the ITS Conversion Amendments
ML05132016512 May 20055-12-05 - Results of the Severe Accident Mitigation Alternative (SAMA) Review for Donald C. Cook Nuclear Plant, Units 1 and 2License Renewal
ML05109013515 April 2005E-mail Form T. Steingass to C. Lyon Donald C. Cook Unit 1, Request for Additional InformationWeld Overlay
ML04348035028 February 2005Response to Task Interface Agreement (TIA 2004-02), Request for ProtectionBackfit
ML05049014217 February 2005Summary of January 13, 2005, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Energy Institute (NEI) on Updating the License Renewal Guidance Documents
ML04334030530 November 2004Notice of Meeting with Indiana Michigan Power Company to Discuss the Degraded Voltage Protection Design at the Donald C. Cook Nuclear Plant
ML04321057715 November 2004Audit and Review Report for Plant Aging Management Reviews and Programs at the Donald C. Cook Nuclear Power Plant, Units 1 and 2Aging Management
ML04279048423 September 2004Summary of Telephone Conference Held on September 7, 2004, Between the Us NRC and Indiana Michigan Power Company, Concerning Unresolved Items Pertaining to the Donald C. Cook Nuclear Plant, Units 1 & 2, LRAAging Management
ML04279027322 September 2004Summary of Telephone Conference Held Between the U.S. Nuclear Regulatory Commission and Indiana Michigan Power Company, Concerning Follow-Up Items to Request for Additional Information Pertaining to DC Cook, Units 1 & 2, LRAAging Management
ML04244067131 August 2004Summary of Telephone Conference Held on August 10, 2004 Between the U.S. Nuclear Regulatory Commission (NRC) and Indiana Michigan Power Company (I&M) Representatives Concerning Requests for Additional Information on Donald C. Cook Nuclear PAging Management
Fire Protection Program
ML04174008621 June 2004All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee
ML0415902737 June 2004TIA 04-02 Request for Technical Assistance Re Degraded Voltage Protection at D. C. Cook
ML0510300289 February 2004Receipt of Proposed Differing Professional View
ML03358004623 December 2003Transmittal of Final ASP Analysis of August 2001 Operational Condition at D.C. Cook 1 & 2High winds
Significance Determination Process
ML03240059224 May 2003May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially WithheldSystematic Assessment of Licensee Performance
ML0312105391 May 2003Meeting with TVA and American Electric Power Staff'S Draft Evaluation for Ice Condenser Topical Report McGuire, Catawba, Sequoyah, Watts Bar, and D.C.Cook
ML05103005113 January 2003Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis RequirementsFinite Element Analysis
Earthquake
ML02329037713 January 2003Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis RequirementFinite Element Analysis
Earthquake
IR 05000315/200200910 January 2003Memo 1/10/03, D.C. Cook, DRS Input to DRP IR 05000315-02-009 and 05000316-02-009High Radiation Area
Locked High Radiation Area
ML0300802558 January 2003Report on Status of Open TIAs Assigned to NRR