Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML23137A1782023-05-22022 May 2023 – Correction to Issuance of Amendment to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23012A0152023-02-21021 February 2023 Issuance of Amendment No. 224 to Change Nozzle Blockage Testing Requirement for Reactor Building Spray System ML22341A1972022-12-15015 December 2022 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval ML22244A1722022-09-22022 September 2022 Issuance of Amendment No. 223 to Relocate Main Steam Isolation Valve Isolation Times to the Updated Final Safety Analysis Report ML22242A1632022-08-31031 August 2022 Correction to Issuance of Amendment to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program ML22160A3652022-08-16016 August 2022 Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21319A2622021-12-28028 December 2021 Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description ML21112A1082021-06-30030 June 2021 Issuance of Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report ML19276D3772019-12-11011 December 2019 Issuance of Amendment Revise Company Name to Dominion Energy South Carolina, Inc. ML19080A1032019-04-30030 April 2019 Issuance of Amendment No. 215 Technical Specification 3.8.2, D.C. Sources - Operating ML19074A2222019-04-10010 April 2019 Issuance of Amendment No. 214 Removes the Expired One-Time Extension to Surveillance Requirement 4.3.3.6 and Removes the Index from Technical Specifications ML19023A4202019-03-0707 March 2019 Issuance of Amendment Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 ML19056A4062018-11-30030 November 2018 Virgil C. Summer Nuclear Station NPDES Permit No. SC0030856 Renewal Application, Thermal Mixing Zone Evaluation 2018 Water Quality Monitoring Report ML18253A1152018-10-0505 October 2018 Issuance of Amendment No. 212 Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit ML18260A0272018-09-25025 September 2018 Issuance of Exigent Amendment One Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation ML18141A6682018-06-28028 June 2018 Issuance of Amendment No. 210, Revise Technical Specification 6.8.4.g for Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML18157A2122018-06-0707 June 2018 Correction to Amendment No. 199 to Correct an Administrative Error ML18108A1632018-04-20020 April 2018 Correction to Amendments Nos. 79 and 202, to Correct Typographical Errors ML18033A8442018-02-27027 February 2018 Correction to Amendment No. 170 to Correct a Typographical Error ML17206A4122017-10-0404 October 2017 Issuance of Amendment TSTF-411, Revision 1, Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P-A). ML17011A0502017-03-0909 March 2017 Issuance of Amendment to Revise Completion Date of Implementation Milestone 8 of the Cyber Security Plan ML16348A2002017-01-18018 January 2017 Issuance of Amendment to Revise Technical Specification 3.5.4 Limiting Condition for Operation Refueling Water Storage Tank ML16264A4112016-10-26026 October 2016 Issuance of Amendment to Revise Technical Specification 3/4.7.1.2, Emergency Feedwater System ML15231A6052016-05-16016 May 2016 Issuance of Amendment to Change Licensing Basis to Incorporate a Supplemental Analysis to the Steam Generator Tube Rupture Accident ML16104A2952016-05-0606 May 2016 Issuance of Amendment to Adopt TSTF-523, Revision 2 RC-16-0043, License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System.2016-04-0707 April 2016 License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System. ML16063A0902016-03-0909 March 2016 Issuance of Exigent Amendment Regarding Technical Specification 3.7.1.2 RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B2016-03-0101 March 2016 (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B ML15208A0292015-10-15015 October 2015 Issuance of Amendment ML15170A0872015-08-18018 August 2015 Issuance of Amendment to Revise the Radiation Emergency Plan ML15063A3552015-04-13013 April 2015 Issuance of Amendment to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 ML14287A2892015-02-11011 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14122A3092014-05-29029 May 2014 Issuance of Amendment 198 Regarding the Cyber Security Plan Implementation Schedule Milestone 8 ML14030A3742014-03-11011 March 2014 Issuance of Amendment for Technical Specification Change Related to Control Room Emergency Filtration System ML14010A1822014-02-28028 February 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-510 ML13354B6432014-02-0606 February 2014 Issuance of Amendment for the Technical Specification Change Related to Snubber Surveillance Requirements ML13326A2042014-02-0505 February 2014 Issuance of Amendment Extending Integrated Leak Rate Test Interval ML12292A0562012-12-21021 December 2012 Issuance of Amendment Regarding Deviation of Scope of the Cyber Security Plan Implementation and Facility Operating Condition 2.E ML12270A3012012-10-12012 October 2012 Issuance of Amendment ML12184A1352012-07-0909 July 2012 Issuance of Amendment ML12146A0172012-05-30030 May 2012 Issuance of Amendment on Beacon Core Monitoring and Operations Support System ML12121A0342012-05-0101 May 2012 Issuance of Amendment Extending Integrated Leak Rate Test ML11346A0062012-03-20020 March 2012 Issuance of Amendment Regarding Quality Assurance Program ML12047A1922012-03-0606 March 2012 Issuance of Amendment No. 187 Regarding Surveillance Frequency of Solids State Protection Westinghouse Type AR Relays 18 Months ML11326A2502012-02-22022 February 2012 Issuance of Amendment Regarding Reactor Coolant System Leakage Detection Systems ML11201A3122011-08-24024 August 2011 Issuance of Amendment 184 Regarding Cyber Security Plan 2024-08-05
[Table view] Category:Safety Evaluation
MONTHYEARML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 – Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 – Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML23012A0152023-02-21021 February 2023 Issuance of Amendment No. 224 to Change Nozzle Blockage Testing Requirement for Reactor Building Spray System ML22341A1972022-12-15015 December 2022 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval ML22244A1722022-09-22022 September 2022 Issuance of Amendment No. 223 to Relocate Main Steam Isolation Valve Isolation Times to the Updated Final Safety Analysis Report ML22160A3652022-08-16016 August 2022 Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21319A2622021-12-28028 December 2021 Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description ML21188A3322021-08-10010 August 2021 Correction to Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report ML21173A1632021-08-0606 August 2021 Authorization and Safety Evaluation for Alternative Request No. RR-4-25 ML21112A1082021-06-30030 June 2021 Issuance of Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19361A0702020-01-24024 January 2020 Relief Request Regarding Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography (RR-4-20) ML19276D3772019-12-11011 December 2019 Issuance of Amendment Revise Company Name to Dominion Energy South Carolina, Inc. ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19080A1032019-04-30030 April 2019 Issuance of Amendment No. 215 Technical Specification 3.8.2, D.C. Sources - Operating ML19074A2222019-04-10010 April 2019 Issuance of Amendment No. 214 Removes the Expired One-Time Extension to Surveillance Requirement 4.3.3.6 and Removes the Index from Technical Specifications ML19023A4202019-03-0707 March 2019 Issuance of Amendment Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 ML19035A2992019-02-26026 February 2019 Relief Request (RR-4-18) for Use of NRC Generic Letter 90-05 ML19030B8272019-02-13013 February 2019 Relief Request (RR-4-17) for Use of ASME Code Case N-513-3 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 ML18253A1152018-10-0505 October 2018 Issuance of Amendment No. 212 Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit ML18260A0272018-09-25025 September 2018 Issuance of Exigent Amendment One Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation ML18255A2562018-09-24024 September 2018 Correction to the Safety Evaluation and the Orders Approving Indirect Transfer of Licenses ML18129A0762018-08-30030 August 2018 Transmittal Letter and Safety Evaluation Related to the Orders Approving Indirect Transfer of Licenses for Units 1, 2, 3 and the Independent Spent Fuel Storage Installation ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML18141A6682018-06-28028 June 2018 Issuance of Amendment No. 210, Revise Technical Specification 6.8.4.g for Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML17206A4122017-10-0404 October 2017 Issuance of Amendment TSTF-411, Revision 1, Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P-A). ML17089A6172017-08-0101 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17011A0502017-03-0909 March 2017 Issuance of Amendment to Revise Completion Date of Implementation Milestone 8 of the Cyber Security Plan ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16348A2002017-01-18018 January 2017 Issuance of Amendment to Revise Technical Specification 3.5.4 Limiting Condition for Operation Refueling Water Storage Tank ML16264A4112016-10-26026 October 2016 Issuance of Amendment to Revise Technical Specification 3/4.7.1.2, Emergency Feedwater System ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML15231A6052016-05-16016 May 2016 Issuance of Amendment to Change Licensing Basis to Incorporate a Supplemental Analysis to the Steam Generator Tube Rupture Accident ML16104A2952016-05-0606 May 2016 Issuance of Amendment to Adopt TSTF-523, Revision 2 ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML16063A0902016-03-0909 March 2016 Issuance of Exigent Amendment Regarding Technical Specification 3.7.1.2 ML15208A0292015-10-15015 October 2015 Issuance of Amendment 2024-08-05
[Table view] Category:Technical Specifications
MONTHYEARML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23208A0722023-07-18018 July 2023 3 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23012A0152023-02-21021 February 2023 Issuance of Amendment No. 224 to Change Nozzle Blockage Testing Requirement for Reactor Building Spray System ML22269A4372022-09-26026 September 2022 Correction to Issuance of Amendment Related to Surveillance Requirement 4.0.5, Associated Basis, and Bases 3/4.4.2, 3/4.4.6, and 3/4.4.10 ML22269A4342022-09-26026 September 2022 VC Summer Correction Letter to Amendment 166 - Enclosure - ML22115A1042022-04-22022 April 2022 License Amendment Request- Technical Specifications Nozzle Blockage Testing Requirement Change for Reactors Building Spray System ML21319A2622021-12-28028 December 2021 Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20156A3032020-06-0404 June 2020 License Amendment Request Update of Analytical Method to the Core Operating Limits Report with the Full Spectrum Loss of Coolant Accident Approach ML18253A1152018-10-0505 October 2018 Issuance of Amendment No. 212 Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit ML18092B5102018-03-29029 March 2018 (VCSNS) - Administrative License Amendment Request to Correct the Typographical Error in TS Table 6.2-1 Minimum Shift Crew RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error ML17206A4122017-10-0404 October 2017 Issuance of Amendment TSTF-411, Revision 1, Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P-A). ML16104A2952016-05-0606 May 2016 Issuance of Amendment to Adopt TSTF-523, Revision 2 ML16063A0902016-03-0909 March 2016 Issuance of Exigent Amendment Regarding Technical Specification 3.7.1.2 ML15208A0292015-10-15015 October 2015 Issuance of Amendment ML15170A0872015-08-18018 August 2015 Issuance of Amendment to Revise the Radiation Emergency Plan ML15063A3552015-04-13013 April 2015 Issuance of Amendment to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 ML14287A2892015-02-11011 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14122A3092014-05-29029 May 2014 Issuance of Amendment 198 Regarding the Cyber Security Plan Implementation Schedule Milestone 8 ML14030A3742014-03-11011 March 2014 Issuance of Amendment for Technical Specification Change Related to Control Room Emergency Filtration System ML13354B6432014-02-0606 February 2014 Issuance of Amendment for the Technical Specification Change Related to Snubber Surveillance Requirements ML13326A2042014-02-0505 February 2014 Issuance of Amendment Extending Integrated Leak Rate Test Interval RC-13-0034, License Amendment Request - LAR (11-02281) Technical Specification Change to Add an Exception to Specification 3.0.4 in Technical Specification 3/4.7.6 Control Room Emergency Filtration System (CREFS)2013-04-0303 April 2013 License Amendment Request - LAR (11-02281) Technical Specification Change to Add an Exception to Specification 3.0.4 in Technical Specification 3/4.7.6 Control Room Emergency Filtration System (CREFS) RC-13-0047, License Amendment Request - LAR 12-03567, Application to Revise Tech Specs to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line Item Improvement..2013-04-0202 April 2013 License Amendment Request - LAR 12-03567, Application to Revise Tech Specs to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line Item Improvement.. ML12146A0172012-05-30030 May 2012 Issuance of Amendment on Beacon Core Monitoring and Operations Support System RC-11-0063, License Amendment Request - LAR 11-01774, Application to Eliminate License Condition 2.G.1 Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process (CLIIP)2011-08-23023 August 2011 License Amendment Request - LAR 11-01774, Application to Eliminate License Condition 2.G.1 Requiring Reporting of Violations of Section 2.C of the Operating License Using the Consolidated Line Item Improvement Process (CLIIP) RC-11-0104, License Amendment Request - LAR (10-03107) Proposed Change in Administrative Controls Section to Allow the Use of Westinghouse WCAP-12472-P-A, Addendum 1-A2011-08-11011 August 2011 License Amendment Request - LAR (10-03107) Proposed Change in Administrative Controls Section to Allow the Use of Westinghouse WCAP-12472-P-A, Addendum 1-A RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing2011-04-18018 April 2011 V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing RC-11-0006, License Amendment Request - LAR-10-03108, Proposed Change to Relocate Administrative Control Requirements Related to Quality Assurance and Submittal of Quality Assurance Program Description (QAPD)2011-03-18018 March 2011 License Amendment Request - LAR-10-03108, Proposed Change to Relocate Administrative Control Requirements Related to Quality Assurance and Submittal of Quality Assurance Program Description (QAPD) RC-10-0092, License Amendment Request (LAR 10-02033), Changes to Emergency Diesel Generator Surveillance Test Requirements2010-11-11011 November 2010 License Amendment Request (LAR 10-02033), Changes to Emergency Diesel Generator Surveillance Test Requirements ML1001103772010-03-22022 March 2010 Issuance of Amendment Regarding: Use of Optimized Zirlo Fuel Rod Cladding RC-08-0007, License Amendment Request - LAR 03-01931-20, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2008-01-17017 January 2008 License Amendment Request - LAR 03-01931-20, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0713705092007-05-15015 May 2007 Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity RC-06-0199, License Amendment Request - LAR 05-3262, Changes to Emergency Diesel Generator Specification2006-11-21021 November 2006 License Amendment Request - LAR 05-3262, Changes to Emergency Diesel Generator Specification ML0630700682006-11-0202 November 2006 Technical Specifications Pages Re Alternate AC Power Supply ML0630000262006-10-24024 October 2006 Technical Specifications, Implementing Approved Changes in Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times. ML0627002792006-09-0707 September 2006 V.C. Summer, Tech Spec Pages for Amendment 176 Regarding Best Estimate Loss-of-Coolant Accident Analyses Methodology RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity2006-05-24024 May 2006 License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity ML0614204982006-05-0404 May 2006 Technical Specifications, Administrative Controls ML0535300472005-12-13013 December 2005 Enclosure, Amd MC7375, Reactor Coolant System Pressure-Temperature Limits ML0522402792005-08-10010 August 2005 Operating License, License Amendment Request- LAR 04-0440, Emergency Feedwater System Pump Testing Criteria RC-05-0090, License Amendment Request Re Reactor Coolant System - Heatup/Cooldown Curves2005-06-22022 June 2005 License Amendment Request Re Reactor Coolant System - Heatup/Cooldown Curves ML0513902262005-05-0909 May 2005 Enclosure, Amd MC3308, Extending the Inspection Interval for Reactor Coolant Pump Flywheels RC-05-0041, License Amendment Request (LAR 03-1931-24) Adoption of TS Task Force (TSTF) Traveler-287, Revision 5, Ventilation System Envelope Allowed Outage Time2005-03-0909 March 2005 License Amendment Request (LAR 03-1931-24) Adoption of TS Task Force (TSTF) Traveler-287, Revision 5, Ventilation System Envelope Allowed Outage Time ML0410404932004-04-0505 April 2004 Technical Specifications, Revision to Allowed Outage Time for Engineered Safety Features Actuation System Instrumentation ML0334503692003-12-15015 December 2003 Tech Spec Pages for Amendment 165 One-Time Extension of Steam Generator Inspection Interval ML0330400312003-10-29029 October 2003 Technical Specification Pages for Virgil C. Summer Nuclear Station, Unit 1, Amendment No. 165 2024-08-05
[Table view] |
Text
January 10, 1991 Docket No. 50-395 DISTRIBUTION See attac sheet Mr. John L. Skolds Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, South Carolina 29065
Dear Mr. Skolds:
SUBJECT:
ISSUANCE OF AMENDMENT NO. 94 TO FACILITY OPERATING LICENSE NO. NPF-12 REGARDING TECHNICAL SPECIFICATIONS 3/4.4.2 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1, (TAC NO. 76867)
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 94 to Facility Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station, Unit No. 1. The amendment consists of changes to the Technical Specifications in response to your application dated May 16, 1990, as supplemented August 13, 1990.
The amendment changes the Technical Specifications by allowing a +/- 3% tolerance in the lift setting of the pressurizer code safety valves (Technical Specifica tions 3.4.2.1 and 3.4.2.2) and by allowing heatup to Mode 3 with these valves set under cold conditions (Technical Specification 3.4.2.2 and Surveillance Requirement 4.4.2.1).
A copy of the related Safety Evaluation is enclosed. Notice of Issuance will be included in the Commission's Bi-weekly Federal Rester notice.
Sincerely, Ronnie Lo/for George F. Wunder, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosures:
- 1. Amendment No. 94 to NPF-12
- 2. Safety Evaluation cc w/enclosures:
See next page See Previous Concurrences IFC :LA: R PD21 .. OGC* #D:PD21:DR P 1FC :LA:----------
- P------------ ----------- ------------ ----------
lAME :PAn son: : Wunders: SUttal ~ es
'ATE: I /J0/91 / / /91 /: 1//6/91 :
OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 94 License No. NPF-12
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by South Carolina Electric & Gas Company (the licensee), dated May 16, 1990, as supplemented August 13, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will notre inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-12 is hereby amended to read as follows:
9101240325 910110 PDR ADOCK 05000395 P PDR
(2) Technical Specifications and-Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 94 , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
South Carolina Electric & Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ronnie Lo/for Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: January 10, 1991 OFC :ý4: 1: PR:PM:PD2' :DRPR: OGC .D:PD21:DRP 0 :
NAME :Pgegrson:- G~ersw -::)1L densa"((
DATE :frtZ&.1 If/{/5/90 I VOFICIAL RECORD COPY
ATTACHMENT TO LICENSE AMENDMENT NO. 94 TO FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are indicated by marginal lines.
Remove Pages Insert Pages 3/4 4-7 3/4 4-7 3/4 4-8 3/4 4-8 B3/4 4-2 B3/4 4-2
REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2.1 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG +/- 3%.*
APPLICABILITY: MODES 4 and 5.
ACTION:
With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE residual heat removal loop into operation in the shutdown cooling mode.
SURVEILLANCE REQUIREMENTS 4.4.2.1 The Surveillance Requirements of Specification 4.0.5 shall be met, or; the pressurizer code safety valve shall have its lift set pressure verified under cold conditions.
SUMMER - UNIT 1 3/4 4-7 Amendment No. 94
REACTOR COOLANT SYSTEM OPERATING LIMITING CONDITION FOR OPERATION 3.4.2.2 All pressurizer code safety valves shall be OPERABLE with a lift setting of 2485 PSIG +/- 3%.*
APPLICABILITY: MODES 1, 2 and 3.#
ACTION:
With one pressurizer code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes or be in at least HOT STANDBY within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and in at least HOT SHUTDOWN within the following 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.2.2 No additional Surveillance Requirements other than those required by Specification 4.0.5.
The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
- Mode 3 applicability is exempted under the following conditions:
- 1. There has been a least 5 days of operation in MODES 5 or 6 since the reactor was last critical, and
- 2. All RCCAs are fully inserted with all CRDMs de-energized.
SUMMER - UNIT 1 3/4 4-8 Amendment No. 94
REACTOR COOLANT SYSTEM BASES 3/4.4.2 SAFETY VALVES The pressurizer code safety valves operate to prevent the RCS from being pressurized above its Safety Limit of 2735 psig. Each safety valve is designed to relieve 420,000 lbs per hour of saturated steam at the valve set point plus 3% accumulation. The relief capacity of a single safety valve is adequate to relieve any overpressure condition which could occur during shutdown. In the event that no safety valves are OPERABLE, an operating RHR loop, connected to the RCS, provides overpressure relief capability and will prevent RCS over pressurization. In addition, the Overpressure Protection System provides a diverse means of protection against RCS overpressurization at low temperatures.
During operation, all pressurizer code safety valves must be OPERABLE to prevent the RCS from being pressurized above its safety limit of 2735 psig.
The combined relief capacity of all of these valves is greater than the maximum surge rate resulting from a complete loss of load assuming no reactor trip until the first Reactor Protective System trip set point is reached (i.e., no credit is taken for a direct reactor trip on the loss of load) and also assuming no operation of the power operated relief valves or steam dump valves.
Demonstration of the safety valves' lift settings will be performed in accordance with the provisions of Section XI of the ASME Boiler and Pressure Code.
3/4.4.3 PRESSURIZER The limit on the maximum water volume in the pressurizer assures that the parameter is maintained within the normal steady state envelope of operation assumed in the SAR. The limit is consistent with the initial SAR assumptions.
The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> periodic surveillance is sufficient tognsure that the parameter is restored to within its limit following expected transient operation. The maximum water volume also ensures that a steam bubble is formed and thus the RCS is not a hydraulically solid system. The requirement that a minimum number of pressurizer heaters be OPERABLE enhances the capability of the plant to control Reactor Coolant System pressure and establish natural circulation.
3/4.4.4 RELIEF VALVES (PORV's)
The power operated relief valves and steam bubble function to relieve RCS pressure during all design transients up to and including the design step load decrease with steam dump. Operation of the power operated relief valves minimizes the undesirable opening of the spring-loaded pressurizer code safety valves. Each PORV has a remotely operated block valve to provide a positive shutoff capability should a relief valve become inoperable.
SUMMER - UNIT 1 B 3/4 4-2 Amendment No. 94
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 94 TO FACILITY OPERATING LICENSE NO. NPF-12 SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 DOCKET NO. 50-395
1.0 INTRODUCTION
By letter dated May 16 1990, as supplemented August 13, 1990, South Carolina Electric & Gas Company (SCE&G or the licensee), the licensee for the Virgil C. Summer Nuclear Station, Unit No. 1, (Summer Station) requested an amendment to the Technical Specifications (TS) appended to Facility Operating License No. NPF-12.
The proposed amendment would (1) increase the tolerance of the pressurizer safety valve (PSV) setpoint from +/-1% to +/-3% and (2) allow the Mode 3 operation with one or more PSVs inoperable so that the plant can be heated up to Mode 3 condition for the purposes of testing these valves.
Specifically, the request would (1) modify Limiting Conditions for Operation (LCO) 3.4.2.1 and 3.4.2.2 by changing the PSV setpoint tolerance from +/-1 to +/-3%, (2) modify Surveillance Requirement 4.4.2.1 to indicate that the PSV shall have its lift set pressure verified under cold conditions, and (3) add a footnote under LCO 3.4.2.2 indicating that Mode 3 applicability is exempted if the following c%ditions are met: (i) there have been at least 5 days of operation in Mode 5 or 6 since the reactor was last critical, and (ii) all rod cluster control assemblies (RCCA) are fully inserted with all control rod drive mechanisms (CRDM) deenergized.
2.0 EVALUATION The Summer Station PSVs were designed and manufactured to meet the 1971 Edition including the Winter 1972 Addenda of the ASME Code,Section III, which required the PSVs to be designed to open within +/- 1% of the set pressure.
The current TS also impose a tolerance of +/- 1% on the set pressure in the LCO for the PSVs. However, the Surveillance Requirements of these TS require testing the PSVs under Section XI of the ASME Code. 10 CFR Part 50 requires that Section XI testing be in compliance with the 1977 Edition, including the Summer 1978 Addenda of the ASME Code. This Edition of 9101240329 910110 PDR ADOCK 05000395 p PDR
Section XI does not specify a tolerance to be applied to lift pressure verification; therefore, the tolerance prescribed in the LCO
(+/-1%) is used as the acceptance criteria for Section XI testing.
Section XI also requires that when any valve in a system fails the setpoint criteria, additional valves in the system shall be tested, and a valve failing to function during a test shall be repaired or replaced.
The 1989 Edition of the ASME Code,Section XI, requires that the PSVs be tested per the standard ASME/ANSI OM-1987, Part 1. This standard allows the tested lift pressure to exceed the stamped set pressure by up to 3%
before declaring a test failure. It also provides a guideline for testing additional valves when a valve exceeds the +/-3% tolerance. Therefore, increasing the PSV setpoint tolerance to +/-3% for testing acceptance criteria is in compliance with the later Code requirements.
To support the proposed TS amendments for the increased PSV setpoint tolerance and testing in Mode 3, the licensee provided the sensitivity analyses and evaluation of the existing analyses of all the transients and accidents in the Reload Transition Safety Report (RTSR) performed to determine the impacts on each transient or accident.
In evaluating the impact of the increased setpoint tolerance on the pressurization events, the PSVs were assumed to have a setpoint at the maximum tolerance of 3% plus 3% accumulation, i.e., the PSVs open at the setpoint of 2575 psia and attain the full open relief capacity at 2653 psia. The results of the evaluation indicated that (1) the low probability event of a rupture of CRDM housing, which results in the ejection of a RCCA, has the peak reactor coolant system (RCS) pressure of 2900 psia, which is below the pressure limit which would cause stresses to exceed the "Service Limit C" (an emergency condition) as defined in the ASME Code and accepted by the Standard Review Plan (SRP), Section 5.2, and (2) all other events including turbine trip and a Condition IV locked rotor event have the peak RCS pressure of 110% of the design pressure.
Though the staff does not agree with the licen*ee's acceptance criteria of (1) 120% of the RCS design pressure for Condition IV events, and (2) the faulted condition stress limits for a rod ejection event, it finds the licensee evaluation results to be acceptable because the increased PSV setpoint tolerance limit of 3% does not result in the peak RCS pressure exceeding the SRP acceptance limits for the transients and accidents of the RTSR.
The impact of the PSV setpoint at the lower end of 3% tolerance limit was also evaluated. With a -3% tolerance, the lowest setpoint of 2425 psia remains higher than the setpoint of 2350 psia of the power operated relief valves (PORV). For the events where the departure from nucleate boiling (DNB) is of the primary concern, the analyses conservatively assumed the operation of the PORVs and the lowest set PSV since lower RCS pressure is detrimental to DNB. However, since the minimum PSV setpoint is still higher than the PORV setpoint, there is no impact on the analysis results of minimum DNB ratios.
Based on the evaluations and analyses performed, the licensee concluded that operation with PSV setpoints within +/-3% tolerance about the nominal values will have no adverse impact upon the licensing basis analyses. All licensing basis criteria continue to be met and the conclusions in the RTSR remain valid. In addition, the probability of premature lifting of PSVs is not increased because of the lower PORV setpoint.
The licensee also proposed to set the PSVs under cold conditions, then heat up to Mode 3 and perform the PSV testing during Mode 3 operation using the Crosby Gage & Valve Set Point Verification Device (SPVD). This would render the PSVs inoperable during testing. The licensee, therefore, performed an examination of the impact of the Mode 3 PSV testing on all the transients and accidents assuming all PSVs inoperable. The PSV testing in Mode 3 will be allowed only after (1) at least 5 days of operation in cold shutdown (Mode 5) or a lower mode, and (2) all the RCCAs inserted with CRDMs deenergized. In addition, LCO 3.4.5 requires that the pressurizer be operable with a water volume of less than or equal to 1288 cubic feet during the operation of Modes 1, 2 and 3. This requirement ensures the presence of a steam bubble in the pressurizer. Therefore, at the time of the PSV testing, the decay heat level would be very low, no reactivity may be added to the primary side through rod motion, and there is sufficient bubble space to accommodate the reactor coolant insurge into the pressurizer. The licensee examined all the transients and accidents of the RTSR, and concluded that there was no adverse effect of the inoperable PSVs on the previously analyzed results. Therefore, the licensee's proposal to set the PSVs in the cold condition and then test them in Mode 3 is acceptable. In addition, they indicated that the use of the SPVD does not restrict the vertical movement of the spindle before, during or after testing, and that since the internal mechanism of the SPVD triggers a solenoid and releases the spindle allowing the valve to reseat, it is highly unlikely that the valve with the SPVD installed will fail in an open position, thus initiating a transient. The staff agrees with the licensee's assessment. However, as rccommendet by the evaluation provided with the licensee's submittal, the licensee should verify that the test procedures will assure that the probability of initiating a transient is not increased.
The staff agrees with the licensee's assessment of the proposed setpoint tolerance criteria. The staff finds that the licensee's proposed tolerance of +/-3% of nominal setpoint is consistent with current versions of ASME Code requirements arid is acceptable for the purpose of determining the as-found setpoint acceptability and the necessity for testing additional valves. However, because the licensee proposed to leave the setpoint of the PSVs in the +/-3% range, the staff was concerned that the valves would drift beyond the +/-3% value when returned to service.
In response to this concern, the licensee has evaluated an additional
+/-3% of setpoint drift beyond the +/-3% range and has determined that the limits of the accident analyses are not exceeded (Reference 3). This is a
reasonable amount of additional drift which may be expected; therefore, the staff agrees that the PSVs may be left within the +/-3% range following testing without resetting the valves.
The staff has reviewed the licensee's evaluation on the impacts of the proposed TS changes to allow an increased PSV set point tolerance to
+/-3% and to perform the PSV testing during Mode 3 operation with the conditions stated. We find that these proposed changes do not have adverse impact on the existing RTSR safety analysis results and are acceptable.
3.0 ENVIRONMENTAL CONSIDERATION
This amendment changes requirements in the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes the surveillance requirements. The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released off site, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previuusly issued a proposed finding that this amendment involves no significant hazards consideration, and there has been no public comment on such finding. Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
4.0 CONCLUSION
The Commission made a proposed determination that this amendment involves no significant hazards consideration, which was published in the FEDERAL REGISTER on (55 FR 40474) on October 3, 1990, a*d consulted with the State of South Carolina. No public comments or requests for hearing were received, and the State of South Carolina did not have comments.
The staff has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 REFERENCES
- 1. Letter from 0. S. Bradham (SCE&G) to USNRC, "Technical Specifications Change Request - Pressurizer Safety Valve Setpoint and Mode 3 Exception,"
May 16, 1990.
- 2. Letter from 0. S. Bradham (SCE&G) to USNRC, "Modification to Technical Specification Change Request - Pressurizer Safety Valve," August 13, 1990.
- 3. South Carolina Electric & Gas Company Technical Work Record, "PSV Set Point Tolerance Increase," Serial No. 239-02-7834, October 15, 1990.
Dated: January 10, 1991 Principal Contributors: Y. Hsii C. Hammer 4