Technical Specifications, Issuance of Amendment Regarding Steam Generator Tube Integrity
ML071370509
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/15/2007
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-1
To: Archie J
South Carolina Electric & Gas Co
Martin R, NRR/DORL, 415-1493
Shared Package
ML071070384 List:
References
TAC MD0112, TAC MD2057
Download: ML071370509 (13)


Text

(3) SCE&G, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as amended through Amendment No. 33; (4) SCE&G, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed neutron sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) SCE&G, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus of components; and (6) SCE&G, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as my be produced by the operation of the facility.

C. This renewed license shall be deemed to contain, and is subject to, the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level I

SCE&G is authorized to operate the facility at reactor core power levels not in excess of 2900 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this renewed license.

The preoccupation tests, startup tests and other items identified in Attachment 1 to this renewed license shall be completed as specified.

Attachment 1 is hereby incorporated into this renewed license.

(2) Technical Specifications and Environmental Protection Plan The technical Specifications contained in Appendix A, as revised through Amendment Nol 79, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. South Carolina Electric & Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Renewed Facility Operating License No. NPF-1 2 Amendment No. 179

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION Startup and Power Operation ............................................................... 3/4 4-1 Hot Standby ......................................................................................... 3/4 4-2 Hot Shutdown ....................................................................................... 3/4 4-3 Cold Shutdown - Loops Filled ............................................................... 3/4 4-5 Cold Shutdown - Loops Not Filled ........................................................ 3/4 4-6 3/4.4.2 SAFETY VALVES Shutdown ............................................................................................. 3/4 4-7 Operating ............................................................................................. 3/4 4-8 3/4.4.3 PRESSURIZER .................................................................................... 3/4 4-9 3/4.4.4 RELIEF VALVES .................................................................................. 3/4 4-10 .

3/4.4.5 STEAM GENERATOR TUBE INTEGRITY ........................................... 3/4 4-11 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE Leakage Detection Systems ................................................................. 3/44-18 Operational Leakage ............................................................................ 3/44-19 3/4.4.7 CHEMISTRY ........................................................................................ 3/4 4-22 3/4.4.8 SPECIFIC ACTIVITY ............................................................................ 3/4 4-25 3/4.4.9 PRESSURE/TEMPERATURE LIMITS Reactor Coolant System ....................................................................... 3/4 4-29 Pressurizer ........................................................................................... 3/4 4-33 Overpressure Protection Systems ........................................................ 3/4 4-34 3/4.4.10 STRUCTURAL INTEGRITY ................................................................. 3/4 4-36 SUMMER - UNIT 1 V Amendment No. 179

INDEX BASES SECTION PAGE 3/4.4.5 STEAM GENERATOR TUBE INTEGRITY ........................................... B 3/4 4-3 I 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE ......................................... B 3/4 4-4 3/4.4.7 CHEMISTRY ............................................. I.......................................... B 3/4 4-5 3/4.4.8 3/4.4.9 SPECIFIC ACTIVITY ............................................................................

PRESSUREFTEMPERATURE LIMITS .................................................

B 3/4 4-6 B 3/4 4-6 I

3/4.4.10 STRUCTURAL INTEGRITY ................................................................. B 3/4 4-15 3/4.5 EMERGENCY CORE COOLING SYSTEM (ECCS) 3/4.5.1 ACCUM ULATO RS ............................................................................... B 3/4 5-1 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS .............................................................. B 3/4 5-1 3/4.5.4 FUELING WATER STORAGE TANK (RWST) ..................................... B 3/4 5-2 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 ACC U MULATO RS ............................................................................... B 3/4 6-1 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS ............................. B 3/4 6-3 3/4.6.3 PARTICULATE IODINE CLEANUP SYSTEM ...................................... B 3/4 6-4 3/4.6.4 CONTAINMENT ISOLATION VALVES ................................................ B 3/4 6-5 3/4.6.5 COMBUSTIBLE GAS CONTROL ........................................................ B 3/4 6-5 SUMMER - UNIT 1 XlIII Amendment No. 1179

DEFINITIONS E - AVERAGE DISINTEGRATION ENERGY 1.11 E shall be the average (weighted in proportion to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the sum of the average beta and gamma energies per disintegration (in MeV) for isotopes, other than iodines, with half lives greater than 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.

ENGINEERED SAFETY FEATURE RESPONSE TIME 1.12 The ENGINEERED SAFETY FEATURE RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.).

Times shall include diesel generator starting and sequence loading delays where applicable.

The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC.

FREQUENCY NOTATION 1.13 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.2.

GASEOUS RADWASTE TREATMENT SYSTEM 1.14 A GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive gaseous effluents by collecting primary coolant system offgases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.

IDENTIFIED LEAKAGE 1.15 IDENTIFIED LEAKAGE shall be:

a. Leakage (except CONTROLLED LEAKAGE) into closed systems, such as pump seal or valve packing leaks that are captured and conducted to a sump or collecting tank, or
b. Leakage into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be PRESSURE BOUNDARY LEAKAGE, or
c. Reactor coolant system leakage through a steam generator to the secondary system (primary-to-secondary leakage). I MASTER RELAY TEST 1.16 A MASTER RELAY TEST shall be the energization of each master relay and verification of OPERABILITY of each relay. The MASTER RELAY TEST shall include a continuity check of each associated slave relay.

SUMMER - UNIT 1 1-3 Amendment No. 179

DEFINITIONS OFFSITE DOSE CALCULATION MANUAL (ODCM) 1.17 The OFFSITE DOSE CALCULATION MANUAL (ODCM) shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring Alarm/Trip Setpoints, and in the conduct of the Environmental Radiological Monitoring Program. The ODCM shall also contain (1) the Radioactive Effluent Controls and Radiological Environmental Monitoring Programs required by Section 6.8.4 and (2) descriptions of the information that should be included in the Annual Radiological Environmental Operating and Annual Radioactive Effluent Release Reports required by Specifications 6.9.1.6 and 6.9.1.8.

OPERABLE - OPERABILITY 1.18 A system, subsystem, train, component or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function(s), and when all necessary attendant instrumentation, controls, electrical power, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function(s) are also capable of performing their related support function(s).

OPERATIONAL MODE - MODE 1.19 An OPERATIONAL MODE (i.e., MODE) shall correspond to any one inclusive combination of core reactivity condition, power level and average reactor coolant temperature specified in Table 1.1.

PHYSICS TESTS 1.20 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14.0 of the FSAR, 2) authorized under the provisions of 10 CFR 50.59, or 3) otherwise approved by the Commission.

PRESSURE BOUNDARY LEAKAGE 1.21 PRESSURE BOUNDARY LEAKAGE shall be leakage (except primary-to-secondary leakage) through a non-isolable fault in a Reactor Coolant System component body, pipe wall or vessel wall.

PROCESS CONTROL PROGRAM (PCP) 1.22 The PROCESS CONTROL PROGRAM (PCP) shall contain the current formulas, sampling, analyses, tests, and determinations to be made to ensure that processing and packaging of solid radioactive wastes based on demonstrated processing of actual or simulated wet solid wastes will be accomplished in such a way as to assure compliance with 10 CFR Parts 20, 61, and 71, State regulations, burial ground requirements, and other requirements governing the disposal of solid radioactive waste.

SUMMER - UNIT 1 1-4 Amendment No. 179

REACTOR COOLANT SYSTEM 3/4.4.5 STEAM GENERATOR TUBE INTEGRITY LIMITING CONDITION FOR OPERATION 3.4.5 Steam generator tube integrity shall be maintained.

AND All steam generator tubes satisfying the tube repair criteria shall be plugged in accordance with the Steam Generator Program.

APPLICABILITY: MODES 1,2, 3 and 4.

ACTION:

The ACTIONS may be entered separately for each steam generator tube.

a. With one or more steam generator tubes satisfying the tube repair criteria and not plugged in accordance with the Steam Generator Program,
1. Within 7 days verify tube integrity of the affected tube(s) is maintained until the next refueling outage or steam generator tube inspection, or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and
2. Plug the affected tube(s) in accordance with the Steam Generator Program prior to entering HOT SHUTDOWN following the next refueling outage or steam generator tube inspection.
b. With steam generator tube integrity not maintained, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.5.1 Verify steam generator tube integrity in accordance with the Steam Generator Program.

4.4.5.2 Verify that each inspected steam generator tube that satisfies the tube repair criteria is plugged in accordance with the Steam Generator Program prior to entering HOT SHUTDOWN following a steam generator tube inspection.

SUMMER - UNIT 1 3/4 4-11 Amendment No. 179

The following pages were deleted:

3/4 4-12 3/4 4-13 3/4 4-14 3/4 4-15 3/4 4-16 3/4 4-17 SUMMER - UNIT 1 3/4 4-12 Amendment No. 364, 69, (next page is 3/4 4-18) 87, 041, 06, 1140, i ,

Amendment No. 179

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.6.2 Reactor Coolant System operational leakage shall be limited to:

a. No PRESSURE BOUNDARY LEAKAGE,
b. 1 GPM UNIDENTIFIED LEAKAGE,
c. 150 gallons per day primary-to-secondary leakage through any one steam generator,
d. 10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System, and
e. 33 GPM CONTROLLED LEAKAGE at a Reactor Coolant System pressure of 2235 +

20 psig.

f. The leakage rate specified for each Reactor Coolant System Pressure Isolation Valve in Table 3.4-1 at a Reactor Coolant System pressure of 2235 +/- 20 psig.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

a. With any PRESSURE BOUNDARY LEAKAGE or with primary-to-secondary leakage not within limit, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With any operational Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, primary-to-secondary leakage, and leakage from Reactor Coolant System Pressure Isolation Valves, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With any Reactor Coolant System Pressure Isolation Valve Leakage greater than the limit, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.2.1 The Reactor Coolant System operational leakages shall be demonstrated to be within each of the above limits by:

a. Monitoring the reactor building atmosphere (gaseous or particulate) radioactivity monitor at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SUMMER - UNIT I 3/4 4-19 Amendment No. 179

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

b. Monitoring the reactor building sump inventory at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c. Measurement of the CONTROLLED LEAKAGE to the reactor coolant pump seals when the Reactor Coolant System pressure is 2235 +/- 20 psig at least once per 31 days with the modulating valve fully open. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 or 4.
d. Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.(1 ) This requirement is not applicable to primary-to-secondary leakage.
e. Monitoring the reactor head flange leakoff system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.4.6.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE by verifying leakage to be within its limit.

a. During startup following each refueling outage.
b. Prior to returning the valve to service following maintenance repair or replacement work on the valve.
c. Prior to entering MODE 2 following valve actuation due to automatic or manual action or flow through the valve for valves denoted on Table 3.4-1 by an asterisk*.
d. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 or 4.

4.4.6.2.3 Primary-to-secondary leakage shall be 1 verified < 150 gallons per day through any one steam generator at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.0 )

(1) Not required to be performed/completed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

SUMMER - UNIT 1 3/4 4-20 Amendment No. V79

ADMINISTRATIVE CONTROLS

i. Technical Specifications (TS) Bases Control Proaram This program provides a means for processing changes to the Bases of these Technical Specifications.
1. Changes to the Bases shall be made under appropriate administrative control and reviews.
2. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:

a) A change in the TS incorporated in the license or b) A change to the updated FSAR or bases that requires NRC approval pursuant to 10 CFR 50.59.

3. The Bases Control Program shall contain provisions to insure that the Bases are maintained consistent with the FSAR.
4. Proposed changes that meet the criteria of Specification 6.8.4.i.2.b above shall be reviewed and approved prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).

Reactor Coolant Pump Flywheel Inspection Program This program shall provide for the inspection of each reactor coolant pump flywheel per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.

In lieu of Positions C.4.b(1) and C.4.b(2), a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.

k. Steam Generator Program A Steam Generator Program shall be established and implemented to ensure that steam generator (SG) tube integrity is maintained. In addition, the Steam Generator Program shall include the following provisions:
1. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during a SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes. Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.

SUMMER - UNIT 1 6-12d Amendment No. 179

ADMINISTRATIVE CONTROLS

2. Performance criteria for SG tube integrity. Steam generator tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational leakage.

a) Structural integrity performance criterion. All inservice SG tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, HOT STANDBY, and cooldown and all anticipated transients included in the design specification) and design basis accidents. This includes retaining a safety factor of 3.0 (3deltaP) against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.

b) Accident induced leakage performance criterion. The primary-to-secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Accident induced leakage is not to exceed 1 gpm per SG.

c) The operational leakage performance criterion is specified in LCO 3.4.6.2, "Reactor Coolant System Operational Leakage."

3. Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
4. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria. The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of 4.a, 4.b, and 4.c below, the inspection scope, inspection methods and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and SUMMER - UNIT 1 6-12e Amendment No. 179

ADMINISTRATIVE CONTROLS location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.

a) Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.

b) Inspect 100% of the tubes at sequential periods of 144, 108, 72 and thereafter, 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 72 effective full power months or three refueling outages (whichever is less) without being inspected.

c) If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.

5. Provisions for monitoring operational primary-to-secondary leakage.

SUMMER - UNIT 1 6-12f Amendment No. 179

ADMINISTRATIVE CONTROLS STEAM GENERATOR TUBE INSPECTION REPORT 6.9.1.12 A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with Specification 6.8.4.k. The report shall include:

a. The scope of inspections performed on each SG,
b. Active degradation mechanisms found,
c. Nondestructive examination techniques utilized for each degradation mechanism,
d. Location, orientation (if linear), and measured sizes (if available) of service induced indications,
e. Number of tubes plugged during the inspection outage for each active degradation mechanism,
f. Total number and percentage of tubes plugged to date, and
g. The results of condition monitoring, including the results of tube pulls and in-situ testing.

SUMMER - UNIT 1 6-16b Amendment No. 179