Correction to Amendment No. 199 to Correct an Administrative Error
ML18157A212
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/07/2018
From: Shawn Williams
Plant Licensing Branch II
To: Lippard G
South Carolina Electric & Gas Co
Williams S
References
Download: ML18157A212 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 7, 2018 Mr. George A. Lippard, Ill Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 - CORRECTION TO AMENDMENT NO. 199 TO CORRECT AN ADMINISTRATIVE ERROR

Dear Mr. Lippard:

By letter dated May 30, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18150A684), South Carolina Electric and Gas Company (SCE&G, the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) approval of a correction of an administrative error in the Virgil C. Summer Nuclear Station (V.C. Summer),

Unit No. 1, Technical Specifications (TSs).

An administrative error was introduced in TS 6.8.2 during License Amendment No. 199 (ADAMS Accession No. ML14287A289). TS 6.8.2 was deleted on March 20, 2012, in License Amendment 188 (ADAMS Accession No. ML11346A006). On February 11, 2015, the NRC approved Amendment No. 199 that had inadvertently contained the deleted TS 6.8.2.

The NRC staff reviewed the information provided in the May 30, 2018, letter, and License Amendments Nos. 199 and 188, and concludes that TS 6.8.2 was incorrectly reintroduced into Amendment 199. Correction of this administrative error does not change the NRC conclusions provided in approval of License Amendment Nos. 199 and No. 188 or the no significant hazards considerations as published in the Federal Register.

G. Lippard, Ill Enclosed is the corrected TS page 6-11 for V.C. Summer Amendment Nos. 199 and 188.

Please replace the affected page with the enclosed page. If you have any questions, please contact me at 301-415-1009.

Sincerely,

~cw~

Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395

Enclosure:

As stated cc: Listserv

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1 ATTACHMENT TO LICENSE AMENDMENT NOS. 199 AND 188 CORRECTION TO ADMINSTRATIVE ERROR RENEWED FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Replace the following page of the Appendix "A" Technical Specifications (TSs) with the attached revised page.

Remove Insert 6-11 6-11

ADMINISTRATIVE CONTROLS

d. Critical operation of the unit shall not be resumed until authorized by the Commission.

6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.
b. Refueling operations.
c. Surveillance and test activities of safety-related equipment.
d. Security Plan.
e. Emergency Plan.
f. PROCESS CONTROL PROGRAM.
g. OFFSITE DOSE CALCULATION MANUAL.
h. Effluent and environmental monitoring program using the guidance in Regulatory Guide 4.15, Revision 1, February 1979.

6.8.2 DELETED 6.8.3 NOT USED.

6.8.4 The following programs shall be established, implemented and maintained:

a. Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the chemical and volume control, letdown, safety injection, residual heat removal, nuclear sampling, liquid radwaste handling, gas radwaste handling and reactor building spray system. The program shall include the following:
1) Preventive maintenance and periodic visual inspection requirements, and
2) Integrated leak test requirements for each system at refueling cycle intervals or less.
b. In-Plant Radiation Monitoring
1) Training of personnel,
2) Procedures ror monitoring, and
3) Provisions for maintenance of sampling and analysis equipment.

SUMMER - UNIT 1 6-11 Amendment No. 18, 49, 72, 79, 117, 13Q, 188, 199

ML18157A212 OFFICE DORL/LPL2-1 /PM DORL/LPL2-1/LA DORL/LPL2-1 /BC DORL/LPL2-1 /PM NAME SWilliams KGoldstein MMarkley SWilliams DATE 06/07/18 06/07/18 06/07/18 06/07/18