LR-N980303, Forwards Rev 9 to Plant Ufsar,Iaw Requirements of 10CFR50.71(e).Rev Contains Text,Table & Figure Changes

From kanterella
Jump to navigation Jump to search
Forwards Rev 9 to Plant Ufsar,Iaw Requirements of 10CFR50.71(e).Rev Contains Text,Table & Figure Changes
ML20249A983
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/12/1998
From: Keiser H
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249A984 List:
References
LR-N980303, NUDOCS 9806190233
Download: ML20249A983 (4)


Text

_

n '< PSE&3 COG 0; HW

==1.

Company nolay J i ooI H:rold W. Keiser Pubhc Service Electric and Gas Company PO pox 236, hancocks Bndge, N Ob 009-33+T100 i

Chief f auclear Officer & President Nuclear Business Urut JUN 121998 LR-N980303 United States Nuclear Regulatory Commission Document Contro! Desk Washington, DC 20555 Gentlemen:

UPDATED FINAL SAFETY ANALYSIS REPORT, REVISION 9 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) hereby submits Revision No. 9 to the Hope Creek Generating Statior Updated Final Safety Arialysis Report (UFSAR) in accordance with the requirements of 10CFR50.71(e).

Revision No. 9 to the Hope Creek UFSAR contains the text, table and figure changes that are required to be included in accordance with the provisions of 10CFR50.71(e). In addition, there are corrections of typographical errors and general editorial changes. A brief summary and explanation of each change is provided in an attachment to facilitate your review.

Revision No. 9 is being issued approximately 21 months after the prior full Revision No.

8 that was submitted on September 24,1996.

Should there be any questions with regard to this submittal, please contact Mr. C.

Manges at (609) 339-3234.

Sincerely, t

)1 M A

yo uV"

/

1 9806190233 990612 L

0 y

PDR ADOCK 05000354 A K

PDR

i Document Control Desk 2 JUN 121998 LR-N980303 Attachments:

- Affidavit l

- Summary of Hope Creek UFSAR Revision 9 Changes

- Hope Creek UFSAR Revision No. 9 C Document Control Desk - Original & ten copies Mr. H. Miller, Administrator - Region i U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Licensing Project Manager - HC U. S. Nuclear Regulatory Commission One White Flint North -

11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Pindale (X24)

USNRC Resident inspector - HC Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ I l

95-4933

_ _ _ _ _ _ - _ _ .-__________-______-___________________--__a

7

}. ::

- Document Control Desk 3.

l .LR-N980303

/cem '

f BC .(w/o attachments):

CNO & President - Nuclear Business Unit (N09)

Senior Vice President - Nuclear Engineering (N19)

Senior Vice President - Nuclear Operations (XO4) -

General Manager - Hope Creek Operations (H07)

Director - QA/NTIEP (X01)

Director - System Engineering (H16)

Director- Design Engineering (N23)

Director - Licensing / Regulation and Fuels (N21)

Director - Nuclear Business Support (N10)

General Manager - NBU Maintenance (X10)

Program Manager - NRB (N38)

. Manager - Hope Creek Licensing (N21) ,

J. Keenan, Esq. (N21) 1 (w/ attachtrents except Hope Creek UFSAR Revision No. 9):

Records Management' Microfilm File Nos. 1.2.1, 2.1.3 1

~7

REF: LR-N980303 -

STATE OF NEW JERSEY )

_. -) SS.

COUNTY OF SALEM )

H.' W. Keiser, being duly sworn, states that he is Chief Nuclear Officer and President -

NBU of Public Service Electric and Gas Company, that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that in accordance with 10CFR50.71(e)(2), the information contained in the attached letter and Updated Final Safety Analysis Report accurately presents changes made since the previous submittal, necessary to reflect information and analyses subm:tted to the Commission or prepared pursuant to Commission requirement, and contains an identification of changes made under the provisions of 10CFR50.59 but not previously submitted to the Commission.

[ (

\ b tea. I Subscribed and Sworn before me this ja th day of /pf[

bl Notary Public of))leW Jersey  ;

My Commission expires on /O//B/ L B, iE*g-NOTAr" t.Suc --

14 Cce.xy en n;bfp mQ g,jf i

l j