Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20196J4421999-07-0101 July 1999 Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196F9441999-06-21021 June 1999 Forwards Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Two Violations of NRC Requirements Occurred Re Reactor Bldg Ventilation Setpoints & Control Rod Drop Analyses ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209C0621999-06-21021 June 1999 Forwards NPDES Discharge Monitoring Rept,May 1999, for Hcgs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML20195J1101999-06-0707 June 1999 Informs of Completion of Review of Providing Updated Status on Implementation of Commitments Made in Response to GL 89-13.Confirms Revs Made to Previous Commitments to Resolve Monitoring Pressure Drop Problem ML20195J1051999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Jw Clifford Will Be Section Chief for Hope Creek Generating Station ML20207F2681999-06-0303 June 1999 Responds to by Forwarding Gfes & NRC Written Exam Grades for List of Hope Creek Operators Submitted by DE Jackson.Absence of Gfes Grade Indicates That Operator Previously Issued RO or SRO License.Without Encl ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML20207D0201999-05-27027 May 1999 Discusses 990512 Meeting to Identify Insp Activities at Hope Creek Facility Over Next Six Months & Informs of Planned Insps in Order for Licensee to Have Opportunity to Prepare & Provide Region I with Feedback on Schedule Conflicts ML20195B9931999-05-20020 May 1999 Forwards NPDES Discharge Monitoring Rept,Apr 1999, for Hgcs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20207A3451999-05-20020 May 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20206Q6211999-05-14014 May 1999 Informs That on 990119 Licensee Provided NRC with Several Revised TS Bases Pages for Plant.Ts Bases Pages B 3/4 6-1 & B 3/4 6-2 Were Revised 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML20206P1931999-05-10010 May 1999 Provides Updated Status of Plant Implementation of Commitments to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment, Issued by NRC on 890718.Revised Commitments to Subject Gl,Listed 05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a1999-05-0404 May 1999 Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML20206D3301999-04-27027 April 1999 Submits Completion of Requested Actions for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept 05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl1999-04-0808 April 1999 Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek ML18106B1411999-03-30030 March 1999 Forwards Decommissioning Info on Behalf of Conectiv Nuclear Facility License Subsidiaries,Atlantic City Electric Co & Delmarva Power & Light Co,For Listed Nuclear Facilities 05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made1999-03-26026 March 1999 Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made LR-N990111, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records1999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records LR-N990131, Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities1999-03-22022 March 1999 Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 19971999-03-22022 March 1999 Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 LR-N990133, Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 1011999-03-22022 March 1999 Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 ML18106B1071999-03-22022 March 1999 Forwards Annual Rept on Results of Individual Monitoring for Salem & Hope Creek Generating Stations,Iaw 10CFR20.2206.Info Provided on Encl Floppy Disk.Without Disk ML20206J4021999-03-10010 March 1999 Responds to NRC Oversight of Nuclear Plants Response to Y2K Bug.Consideration of More Aggressive Action to Forestall Any Y2K Problems,Requested LR-N990112, Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve1999-03-0505 March 1999 Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve ML18106B0861999-03-0101 March 1999 Forwards Annual Repts for Salem & Hope Creek Generating Stations,Containing Data on Number of Station,Utility & Other Personnel Receiving Exposures Greater than 100 Mrem/ Year & Collective Exposures According to Work & Job 1999-09-08
[Table view] |
Text
,
O PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0230 Nuclear Business Unit AUG 2 91997 LR-N970558 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RELIEF REQl'EST FOR FIRST TEN YEAR INTERVAL INSERVICE INSPECTION PROGRAM REGARDING AUGMENTED REACTOR VESSEL INSPECTION HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50 354 Gentlemen:
Public Service Electric and Gas Company (PSE&G) requests approval of the attached Relief Request RR-A4 to the Hope Creek Generating Station First Ten Year Inservice inspection (ISI) Program. Relief Request RR-A4 requests relief from the reactor pressure vessel (RPV) examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code Section XI, 1983 Edition, and the augmented examination requirements of 10 CFR 50.55a(g)(6)(ii)(A)(2). Specifically, pursuant to provisions of 10 CFR 50.55a(a)(3)(i),
and consistent with information contained in NRC Information Notice 97-63, relief is requested from the examination of the RPV circumferential shell welds for two operating cycles.
NRC Information Notice 97-63 stated that the NRC would consider technically justified requests for relief from BWR licensees scheduled to perform the inspections in Fall 1997 and Spring 1998. PSE&G currently plans to perform the augmented inspections during Hope Creek's Fall 1997 refueling outage.
The details and justification for relief are explained further in the attached Relief Request. PSE&G is requesting NRC review and approval of the Relief Request by k
September 13,1997.
\.
9709090272 970829' PDR ADOCK 05000354 t \
G PDR \
\. 3, ' J . )
i lillilllilllll!IE!!QlllllVilllll e 4 6 7 1
( iN[ $ INN!I .
mmuw \
]
.' j
. - j Document Control Desk -2 AUG 2 91997 LR-N970558 -
Should there be any questions concerning this submittal, please do not hesitate to contact us.
Sincerely, n4h . ondf David R. Powell Director -
Licensing & Regulation / Fuels
Attachment:
Relief Request No. RR-A4 C' Mr. H. Miller, Administrator - Region i U. S. Nuclear Regulatory Commission 475 Allendale Road ,
King of Prussia, PA 19406 Mr. D. Jaffe, Licensing Project Manager - HC U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Morris (X24)
USNRC Senior Resident inspector - HC Mr. K. Tosch,~ Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway PO Box 415 .
Trenton, NJ 08625
HOPE CREEK GENERATING STATION ISI PROGRAM RELIEF REQUEST NO. RR A4 COMPONENT DESCRIPTION Class 1, Category B-A, item No. B1.11 reactor pressure vessel pressure retaining circumferential shell welds as identified in the following table:
Reference Description No.
100010 W-4 Shell to Shell 100015 W-5 Shell to Shell 100020 W-6 Shell to Shell 100025 W-7 Shell to Shell ASME EXAMINATION REQUIREMENT in accordance with Table IWB-2500-1 of both the 1983 Edition through Summer 1983 Addenda of Section XI (Hope Creek's current inservice inspection Code of record) and the 1989 Edition of Section XI(as specified in 10CFR50.55a(g)(6)(ii)(A)(2)), all reactor pressure vessel pressure retaining circumferential shell welds are to be volumetrically examined, for essentially 100% of the weld length, by the end of the 1st inspection Interval. The last refueling outage for Hope Creek's first inspection interval is RF07.
BASIS FOR RELIEF The basis for this request for inspection relief is documented in the report *BWR Vessel and Internals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations (BWRVIP-05)," that was transmitted to the NRC in September 1995.
The BWRVIP-05 report provides the technical basis for eliminating inspection of BWR RPV circumferential shell welds. The BWRVIP-05 report concludes that the probability of failure of the BWR RPV circumferential shell welds is orders of magnitude lower than that of the axial shell welds. The NRC staff conducted an independent risk-informed assessment of the analysis contained in BWRVIP-05. The independent assessment was transmitted to the BWRVIP by letter dated August 14,1997. This assessment also concluded that the probability of failure of the BWR RPV circumferential welds is orders of magnitude lower than that of the axial shell welds. Additionally, the NRC assessment demonstrated that inspection of BWR RPV circumferential welds does not measurably affect the probability of failure.
This independent NRC assessment included a probabilistic fracture mechanics (PFM) analysis to estimate RPV failure probabilities. Three key assumptions in the PFM analysis are: the noutron fluence was that estimated to be end-of-license mean fluence; the chemistry values are mean values based on vessel types; and the potential for beyond design basis events is considered.
Page 1 of 4
Attachment 1 H po Crzk ISI Pr:grcm Relief Request No. RR A4 Although BWRVIP-05 provides the technical basis supporting the relief request, the following information is provided to show the conservatisms of the NRC analysis for Hope Creek. Since Hope Creek's vessel was the only one fabricated by Hitachi and the NRC independent assessment stated in section 2.1.4.1. that it is comparable to a Chicago Bridge & Iron (CB&l) vessel, Hope Creek will use the CB&l as its reference case model. In the case of Hope Creek, the circumferential weld joint between shells 4 and 5 of the RPV would be the limiting circumferential weld within the vessel (i.e.
relative to RTNDT). For plants fabricated by or similar to CB&l, the mean end-of-license neutron fluence used in the NRC PFM analysis was 0.19E+19 n/cm 2 However, at Hope Creek, the hi 0.0268E+19 n/cm' ghest fluence anticipated at the end of the 2 requested relief period is at the vessel inside surface and 0.0166E+19 n/cm at the welds separating shells 4 and 5. Thus, embrittlement due to fluence effects is expected to be much lower and the NRC analysis as described in the NRC staff independent assessment is conservative for Hope Creek in this regard. Therefore, there is significant conservatism in the already low circumferential weld failure probabilities as related to Hope Creek. Other Hope Creek RPV shell weld information which the NRC staff requested be included in this relief request is provided in attached Table 1.
As noted in Table 1 the bounding ARTNDTis 21.8 F using peak fluence at the end of the requested relief period. The shift in RTNDT Will be 25% lower when the peak fluence at the wald separating shells 4 and 5 is used. By comparison, using the mean value for fluence and weld chemistry assumed for CB&l reactor vessels in Table 7-5 of the NRC independent assessment report, a ARTNDT of 30.16 F would be derived. Therefore, the calculated ARTNDT Value for Hope Creek's reactor vessel is less than, and thus bounded by, the embrittlement shift assumed in the NRC's independent assessment.
Furthermore it can be seen in Table 1 that the calculated Upper Bound RTNDT value for the Hope Creek belt line welds is 13.6 F at the end of the requested relief period. For comparison, the highest Upper Bound RTNDT Value [ i.e. "Inr.er Surface (RTNDT +2c)
F"] shown within Tables 7-6,7-7, and 7-8 of the NRC's independent assessment report of BWRVIP-05, would be the RTNOT of 145 'F shown in Table 7-7 for the B&W fabricated BWR vessels. Thus, the calculated Upper Bound RTNDTValues for the Hope Creek reactor vessel circumferential welds are bounded by the limiting RTNDT from Table 7-7 of the NRC independent assessment report, thus providing additional assurance that the Hope Creek vessel welds are also bounded by BWRVIP-05.
In the August 14,1997 letter, the NRC stated that the frequency of beyond design basis events not addressed in the BWRVIP-05 report should be assessed in the plant specific relief request. In particular, the NRC staff stated that non-design basis cold over-pressure transients should be considered. It is highly unlikely that a BWR would experience a cold over-pressure transient. In fact, for a BWR to experience such an event, the plant would generally require several operator errors. The NRC staff assessment described several types of events that could be precursors to BWR RPV cold overpressure transients. These were identified as precursors because no cold overpressure event has occurred at a U.S. BWR. The staff assessment also identified one actual cold overpressure event that occurred during shutdown at a foreign BWR.
Page 2 of 4
. Attachment i H:pe Crcck ISI Progrcm Relief Request No. RR A4 1
This event apparently included several operators errors that resulted in a maximum RPV pressure of 1150 psi with a temperature range of 79 F to 88 'F. The Hope Creek operating procedure for reactor coolant pressure boundary inservice system leakage testing has sufficient procedural guidance to prevent a cold over-pressure event during the leak test performed at the conclusion of each outage. In addition, RPV hydrostatic
, tests are considered infrequently performed tests and would be conducted with heightened management oversight and control. Additionally, the High Pressure Coolant Injection (HPCI) and Reactor Core isolation Cooling (RCIC) pumps at Hope Creek are steam driven and do not function when the plant is in cold shutdown.
Actuation of either of these systems would not lead to a cold over-pressure event. The challenge to the RPV from a non-design basis cold over-pressure transient is highly unlikely at Hope Creek during the requested delay. Therefore, the probability of a cold over-pressure transient is considered to be less than or equal to that used in the NRC analysis described in the NRC's independent assessment and is conservative for Hope Creek.
1 In addition to the information above , plant specific inspection information provides
, further bases to conclude vessel failure is highly unlikely. Preservice examinations of the reactor pressure vessel welds were performed in accordance with the 1977 Edition, Summer 1978 Addenda, of Section XI and NRC Regulatory Guide 1.150. The exams
- found that the RPV shell course plate material contained no reportable indications and of those indications that were recorded most all were attributable to impedance i
mismatch at the cladding interface or ID cladding geometry.
Inservice examinations of one circumferential and three axial welds were performed in accordance with the 1983 Edition, Summer 1983 Addenda of Section XI and NRC Regulatory Guide 1.150. The results of this examination were as follows:
- 1. Examination of circumferential weld W-8 had two Section XI recordable indications I
and three Reg. Guide 1.150 recordable indications. All of these indications were acceptable to the code tables and required no subsequent evaluation.
- 2. Examination of axial weld W-15-3 had one Section XI recordable indications and two Reg. Guide 1.150 recordable indications. All of these indications were acceptable to the code tables and required no subsequent evaluation.
- 3. Examination of axial welds W15-1 and W15-2 revealed no recordable indications.
Based on the documentation in BWRVIP-05, the risk-informed independent assessment performed by the NRC staff, and the discussion above, a delay for two refueling cycles in completing the inspection of the RPV circumferential shell welds at Hope Creek provides an acceptable level of quality and safety.
Page 3 of 4
.' Attr.chment 1 Hcp3 Crstk ISI Progrcm R:llef Request No. RR A4--
Table 1 Hope Creek RPV Shell Weld Information Neutron fluence at the end of the 0.0268E19 n/cm2 requested relief period (1)
Initial (unirradiated) reference -30 'F temperature Weld chemistry factor (CF) 106 Weld copper content 0.08 %
Weld nickel content 0.63 %
Increase in reference temperature due 21.8 F to irradiation (ARTum)
Margin term 21.8 F Mean adjusted reference temperature -8.2'F (ART)
Upper bound adjusted reference - 13.6 'F temperature (ART)
Note: Peak vessel surface fluence at end of cycle 9 Page 4 of 4