L-94-024, Forwards Unit 1 Refueling 21 ISI Summary Rept, Per ASME Section XI,IWA-6230

From kanterella
Jump to navigation Jump to search
Forwards Unit 1 Refueling 21 ISI Summary Rept, Per ASME Section XI,IWA-6230
ML20072E363
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/09/1994
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072E366 List:
References
PBL-94-0240, PBL-94-240, NUDOCS 9408220224
Download: ML20072E363 (1)


Text

. - - _

Wisconsin

, Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd., Two Rivers. WI 54241 (414) 755-2321 PBL 94-0240 August 9, 1994 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D. C. 20555 Gentlemen DOCKET 50-266 FILING OF OWNER'S INSERVICE INSPECTION

SUMMARY

REPORT POINT BEACH NUCLEAR PLANT, UNIT 1 Attached is the owner's Inservice Inspection Summary Report which is submitted in accordance with ASME Section XI, IWA-6230. Included in this submittal is the Inservi.e Inspection Summary Report for Form NIS-1 and the Repair /

Replacement Summary Report for Form NIS-2.

The infonnation contained in the report reflects the inservice inspection acMytt.ies during tha first outage of the second period of the third 10-year intarval of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 1.

Since re:lv , ;

/ /

Greg M field Plant Manager caw Attachment l

l

_1 n ? .

vu m ._ t {Jk( \

\ \

t 9408220224 PDR 940809 O ADOCK 05000266 PDR

,4subsWan onliutwatNRWO!Pn&W

_ _ _ _ _ _ _ _ _ _ - _ _ - - - - - . . .