JPN-98-055, Informs That Authority Is Withdrawing License Amend Request Re Inservice Leak & Hydrostatic Testing Operation.Licensee Plans on Submitting Special Operations Section 3.10.1 as Part of Improved TS for Plant
| ML20206P486 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 12/30/1998 |
| From: | James Knubel POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| JPN-98-055, JPN-98-55, TAC-MA1135, NUDOCS 9901120081 | |
| Download: ML20206P486 (2) | |
Text
e a
123 Man Street Wh te Plains New York 10601 i
914 681.6950 914 287.3309 (Fax)
NewWrkher s -.. xnes i 4# Authority s"%Ts*lMe","""
December 30, 1998 JPN-98-055 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Withdrawal of Proposed Technical Specification Amendment (JPTS-95-004)
Regarding inservice Leak and Hydrostatic Testing Operation (TAC No. MA1135)
Reference:
JPN-98-005, NYPA letter to NRC, " Revision to Proposed Technical Specification Change (JPTS-95-004, inservice Leak and Hydrostatic Testing Operation)," dated February 6,1998.
Dear Sir:
On February 6,1998, the New York Power Authority submitted a Technical Specification Amendment (reference) to allow reactor coolant system pressure tests to be performed while remaining in the Cold Shutdown Mode. The Authority made a commitment to the NRC to submit this Technical Specification Amendment. The Amendment would have allowed unrestricted access to the primary containment for the performance of inspections and at the same time allow other outage activities on other systems to continue during the test. The proposed change was consistent with Special Operations Section 3.10.1,
" Inservice Leak and Hydrostatic Testing Operations," contained in Standard Technical Specifications (STS), NUREG-1433, Revision 1. After discussions with the NRC, the Authority is withdrawing the referenced amendment request. The Authority plans on
//
submitting a Special Operations Section 3.10.1 as part of Improved Technical
/0 Specifications for the FitzPatrick Plant.
l No new commitments are made by the Authority in this letter. If you have any questions, q (/u please contact Mr. Art Zaremba at (315) 349-6365.
Very truly yours, 9901120001 981230 PDR ADOCK 05000333 J. Knubel p
PDR Senior Vice President and Chief Nuclear Officer cc: next page
..~
jf,.
.cc:
. Regional Administrator
. U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
~ Resident inspector's Office James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission
' P.O. Box 136 Lycoming, NY 13093 Mr'. Joseph Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/II U.S. Nuclear Regulatory Commission
- Mail Stop 14 B2 Washington, DC 20555 l
I i
i h
l 4
4 i
r v.
e r
7
.-, + -.-