Potential Error in High Steamline Flow Setpoint ML031130248 Person / Time Site:
Beaver Valley , Millstone , Hatch , Monticello , Calvert Cliffs , Dresden , Davis Besse , Peach Bottom , Browns Ferry , Salem , Oconee , Mcguire , Nine Mile Point , Palisades , Palo Verde , Perry , Indian Point , Fermi , Kewaunee , Catawba , Harris , Wolf Creek , Saint Lucie , Point Beach , Oyster Creek , Watts Bar , Hope Creek , Grand Gulf , Cooper , Sequoyah , Byron , Pilgrim , Arkansas Nuclear , Braidwood , Susquehanna , Summer , Prairie Island , Columbia , Seabrook , Brunswick , Surry , Limerick , North Anna , Turkey Point , River Bend , Vermont Yankee , Crystal River , Haddam Neck , Ginna , Diablo Canyon , Callaway , Vogtle , Waterford , Duane Arnold , Farley , Robinson , Clinton , South Texas , San Onofre , Cook , Comanche Peak , Yankee Rowe , Maine Yankee , Quad Cities , Humboldt Bay , La Crosse , Big Rock Point , Rancho Seco , Zion , Midland , Bellefonte , Fort Calhoun , FitzPatrick , McGuire , LaSalle , Fort Saint Vrain , Shoreham , Satsop , Trojan , Atlantic Nuclear Power Plant , Crane Issue date:
04/30/1990 From:
Rossi C Office of Nuclear Reactor Regulation To:
References IN-90-028 , NUDOCS 9004240359Download: ML031130248 (7)
Similar Documents at
Beaver Valley ,
Millstone ,
Hatch ,
Monticello ,
Calvert Cliffs ,
Dresden ,
Davis Besse ,
Peach Bottom ,
Browns Ferry ,
Salem ,
Oconee ,
Mcguire ,
Nine Mile Point ,
Palisades ,
Palo Verde ,
Perry ,
Indian Point ,
Fermi ,
Kewaunee ,
Catawba ,
Harris ,
Wolf Creek ,
Saint Lucie ,
Point Beach ,
Oyster Creek ,
Watts Bar ,
Hope Creek ,
Grand Gulf ,
Cooper ,
Sequoyah ,
Byron ,
Pilgrim ,
Arkansas Nuclear ,
Braidwood ,
Susquehanna ,
Summer ,
Prairie Island ,
Columbia ,
Seabrook ,
Brunswick ,
Surry ,
Limerick ,
North Anna ,
Turkey Point ,
River Bend ,
Vermont Yankee ,
Crystal River ,
Haddam Neck ,
Ginna ,
Diablo Canyon ,
Callaway ,
Vogtle ,
Waterford ,
Duane Arnold ,
Farley ,
Robinson ,
Clinton ,
South Texas ,
San Onofre ,
Cook ,
Comanche Peak ,
Yankee Rowe ,
Maine Yankee ,
Quad Cities ,
Humboldt Bay ,
La Crosse ,
Big Rock Point ,
Rancho Seco ,
Zion ,
Midland ,
Bellefonte ,
Fort Calhoun ,
FitzPatrick ,
McGuire ,
LaSalle ,
Fort Saint Vrain ,
Shoreham ,
Satsop ,
Trojan ,
Atlantic Nuclear Power Plant ,
Crane Category:NRC Information Notice
[Table view] The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:Crane]] </code>.
UNITED STATES
Contents
1 NUCLEAR REGULATORY COMMISSION
2 WASHINGTON, D.C. 20555
3 FLOW SETPOINT
4 Addressees
5 Purpose
6 Description of Circumstances
6.1 At FitzPatrick, this.flow signal
6.2 As noted in Revision 2, errors in
6.3 Charles E. ossl, Director
6.4 Office of Nuclear Reactor Regulation
6.5 Technical Contact:
6.6 D. LaBarge, NRR
6.7 All uranium fuel
6.8 Transportation
6.9 All holders of OLs
6.10 All holders of OLs
6.11 Exchangers for Engineered
6.12 All holders of OLs
6.13 All NRC licensees
6.14 All holders of OLs
6.15 All holders of OLs
6.16 UNITED STATES
6.17 WASHINGTON, D.C. 20555
6.18 FIRST CLASS MAIL
6.19 PERMIT No. 5 E7
6.20 April 30, 1990 This information notice requires i
6.21 Information in this notice, please contact the
6.22 Charles E. Rossi, Director
6.23 Office of Nuclear Reactor Regulation
6.24 Technical Contact:
6.25 D. LaBarge, NRR
6.26 Charles E. Rossi, Director
6.27 Office of Nuclear Reactor Regulation
6.28 Technical Contact:
6.29 Charles E. Rossi, Director
6.30 Office of Nuclear Reactor Regulation
6.31 Technical Contact:
6.32 List of Recently Issued NRC Information Notices
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555
April 30, 1990
NRC INFORMATION NOTICE NO. 90-28: POTENTIAL ERROR IN HIGH STEAMLINE
FLOW SETPOINT
Addressees
All holders of operating licenses or-construction permits for boiling water
reactors (BWRs ).
Purpose
This information notice is intended to alert addressees to possible errors in
the method used to determine the proper setpoints.for-the steamline flow dif- ferential pressure instruments that initiate isolation of the High Pressure
Coolant Injection (HPCI ) and Reactor Core Isolation Cooling (RCIC ) systems
at a limit corresponding to a specific percentage of the rated steam flow.
It is expected that recipients will review the information for applicability
to their facilities and.consider actions, as appropriate, to avoid similar
problems.
However, suggestions contained in this information notice do not
constitute NRC requirements; therefore,-no specific action or written response
is required.
Description of Circumstances
On November 30, 1989, during a.surveillance test of the HPCI system at the
FitzPatrick Nuclear Power Plant, automatic isolation of the steam admission
valves on high steamline flow occurred (Docket No. 50-333; LER No. 89-025-00).
An-intensive series.of tests was initiated to identify the root cause of this
event. To perform these tests, additional instrumentation was connected to
the steamline flow instruments to determine the differential pressure detected
by the instrumentation. This testing led to the determination that the signal
that resulted from startup of the turbine was close to the Isolation setpoint
and, in some cases, was greater than the setpoint. Because the isolation set- point was in accordance with the value specified in the technical specifications, and because no leakage or reason for a high-flow condition could be found, a
possible problem either with the value specified for the setpoint or with the
amount of steam needed to start the turbine, or both, was identified.
Discussion:
At FitzPatrick, the HPCI system is a steam turbine driven Emergency Core
Cooling System designed to supply makeup water to the reactor vessel in
900420359-
K)-
IN 90-28 April 30, 1990 the event of a loss-of-coolant accident. The high steam flow isolation of
the HPCI turbine is designed to shut the steamline isolation valves to the
turbine if the steam supply piping ruptures.
At FitzPatrick, this.flow signal
is derived by sensing the differential pressure that results from flow through
the steam supply piping at an elbow in the piping. If this differential
pressure, expressed in inches of water, reaches the value given in the tech- nical specifications, the isolation valves close.
The accepted value of steam flow that indicates that a break in the steam- line has occurred is typically 300 percent of the rated steam flow.
The
determination of the differential pressure that corresponds to this flow, and hence the Indication that a steamline break has occurred is the subject
of General Electric Nuclear Services Information Letter (SILI No. 475.* The
analytic method described in the SIL applies to HPCI and RCIC systems and uses
measured data from the as-built system operating under rated conditions in the
surveillance test mode, rather than using purely theoreticaltanalysis, to
calculate the differential pressure that would exist at 300-percent flow.
This differential pressure then becomes the setpoint for the switch that
initiates isolation of the system. However, other methods based on sound
engineering principles may also be appropriate.
At FitzPatrick, as part of the root cause determination, the intensive series
of tests found that the actual differential pressure setpoint that caused the
l1solati on
nniurresspned-tu approx-imately-200-pereent-flow, -an--that-the-staxtup--
of the HPCI system occasionally caused the flow to reach this value.
Such a
setpoint is conservative from the viewpoint of the safety function of the high
steamline flow trip, but it adversely affects the reliability of the HPCI
system. Performing the calculations in accordance with SIL No. 475 resulted
in the removal of this conservatism from the setpoint and in the restoration
of the reliability of the HPCI system.
The HPCI system had operated with the setpoint conservatism for 14 years until
several recent changes were made to the system. These changes Included test
methodology improvements, hydraulic actuator replacement (which resulted in
the need for additional steam for turbine startup), and turbine stop valve
rewiring. Setting the setpoint according to Revision 2 of SIL No. 475 pro- vides the proper value for initiation of the Isolation function.
Revision 2 of SIL No. 475 was issued November 28, 1988, by the General
Electric Company, San Jose, California .
As noted in Revision 2, errors in
the original and in Revision I have been corrected in Revision 2.
IN 90-28 i:
April 30, 1990 This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact the
technical contact listed below or the appropriate NRR project manager.
Charles E. ossl, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
D. LaBarge, NRR
(301) 492-1421 Attachment: List of Recently Issued NRC Information Notices
-_
_
_
i
an
_
-'
i 5
14
-
4it
-
-;~
I
'
Attachment
AIN 90-N8 prIl 30, 1990
Page I of I
LIST OF RECENTLYV
ISSUED
NRC INF0RHATIhN
NOTICES
Insormatuon
Date or
Hotie No.
Subeet
Issuance
Issued to
90-27 Clarification of the
4130/90
Recent Revisions to the
fabrication and
Regulatory Requirments
conversion facilities
for Packaging of Urnnium
Nexafluords
41.
l)
for
Transportation
S9W70,
Possible Indications of
4/26/90
All holders of OLs
Supp. I
MisrepresenUted Vendor
or CPs for nuclear
Products
power reactors.
90-26 Inadequate Flow of
4/24/90
All holders of OLs
Essential Service Water
or CPs for nuclear
to Rooe Coolers end Heat
power reectors.
Exchangers for Engineered
Safety-Feature Systeme
90-25 Lost of Vital AC Power
4/16o90
All holders of OLs
with Subsequeit Reactor
or CPs for nuclear
coolent Systee Heat-Up
power reactors.
90-24 Transportation of Model
4/10/90
All NRC licensees
Spec 2-T Radiographic
authorized to use.
Exposure Device
transport, or operate
radiographic exposure
- devices and source
changers..
90-29 Improper Installation of
4/4/90
All holders of OLs
Patel Conduit Seals
or CPs for nuclear
power reactors.
90-22 Unenticipoted Equipuent
3/23/90
All holders
of Ohs
Actuations Fellowing
or CPs for nuclear
Restoration of Power
power reactors
to Rosemeust Transmitter
Trip Units
90-21 Potential Failure of Motor-
3/22/90
All holders of OLs
Operated Butterfly Valves
or CPs for nuclear
to Operate Because Valve
power reactors.
Seat Friction was Under- stistted
0L
CP
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. 20555
OFFICIAL BUSINESS
PENALTY FOR PRIVATE USE, $300
FIRST CLASS MAIL
POSTAGE b FEES PAID
USNRC
PERMIT No. 5 E7
..-
.
v
IN 90-28
April 30, 1990 This information notice requires i
you have any questions about the 1 technical contact listed below or
io specific action or written response. If
Information in this notice, please contact the
the appropriate NRR project manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
D. LaBarge, NRR
(301) 492-1421 Attachment: List of Recently Issued NRC Information Notices
Document Name:
INFO NOTICE - LABARGE, KADAMBI
SEE PREVIOUS CONCURRENCES
OGCB:DOEA:NRR*PD11:DRP:NRR
NPKadambi
DLaBarge
03/28/90
04/03/90
TechEd
04/17/90
CHBerlinger
04/20/90
IN 90-XX
April xx, 1990 This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact the
technical contact listed below or the appropriate NRR project manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
D. LaBarge
(301) 492-1421 Attachment: List of Recently Issued NRC Information Notices
Document Name:
INFO NOTICE - LABARGE, I
SEE PREVIOUS CONCURRENCES
OGCB:DOEA:NRR*PD11:DRP:NRR
NPKadambi
DiaBarge
03/28/90
04/03/90
4/4~10
TechEd
04/17/90
(ADAMB I
C/O 'B~$~RRI
CHB r
gerI
04/X/90
1 D/DOEA:NRR
CERossi
04/ /90
IN 90-XX
March xx, 1990 This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact the
technical contact listed below or the appropriate NRR project manager.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
D. LaBarge
(301) 492-1421 Attachment:
List of Recently Issued NRC Information Notices
1 V'
t Nm- NO
I
It Name:} INFO NOTICE - LABARGE, KADAMBI
NPKadambi
03/M/90
NRR PD11:DRP:
DLaBargec
0//S /90
RPB :ADM
TechEd-j4
03/ /90
fl17/W
C/OGCB:DOEA:NRR
CHBerlinger
03/ /90
D/DOEA:NRR
CERossi
03/ /90
list Information Notice 1990-01, Importance of Proper Response to Self-Identified Violations by Licensees (12 January 1990 , Topic : Notice of Violation , Uranium Hexafluoride )Information Notice 1990-02, Potential Degradation of Secondary Containment (22 January 1990 )Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm (23 January 1990 , Topic : Liquid penetrant )Information Notice 1990-04, Cracking of the Upper Shell-to-Transition Cone Girth Welds in Steam Generators, (26 January 1990 , Topic : Nondestructive Examination , Thermal fatigue )Information Notice 1990-05, Inter-System Discharge of Reactor Coolant (29 January 1990 )Information Notice 1990-06, Potential for Loss of Shutdown Cooling While at Low Reactor Coolant Levels (29 January 1990 , Topic : Reactor Vessel Water Level )Information Notice 1990-07, New Information Regarding Insulation Material Performance and Debris Blockage of PWR Containment Sumps (30 January 1990 )Information Notice 1990-08, KR-85 Hazards from Decayed Fuel (1 February 1990 )Information Notice 1990-08, KR-85 Hazards From Decayed Fuel (1 February 1990 )Information Notice 1990-09, Extended Interim Storage of Low-Level Radioactive Waste by Fuel Cycle and Materials Licensees (5 February 1990 , Topic : Decommissioning Funding Plan , Uranium Hexafluoride )Information Notice 1990-10, Primary Water Stress Corrosion Cracking (PWSCC) of Inconel 600 (23 February 1990 , Topic : Boric Acid , Hydrostatic , Stress corrosion cracking , Liquid penetrant )Information Notice 1990-10, Primary Water Stress Corrosion Cracking of Inconel 600 (23 February 1990 , Topic : Boric Acid , Hydrostatic , Nondestructive Examination , Stress corrosion cracking , Liquid penetrant )Information Notice 1990-11, Maintenance Deficiency Associated with Solenoid-Operated Valves (28 February 1990 )Information Notice 1990-12, Monitoring or Interruption of Plant Communications (28 February 1990 )Information Notice 1990-13, Importance of Review and Analysis of Safeguards Event Logs (5 March 1990 )Information Notice 1990-14, Accidental Disposal of Radioactive Materials (6 March 1990 , Topic : Brachytherapy )Information Notice 1990-15, Reciprocity Notification of Agreement State Radiation Control Directors Before Beginning Work in Agreement States (17 March 1990 , Topic : Uranium Hexafluoride )Information Notice 1990-16, Compliance with New Decommissioning Rule (7 March 1990 , Topic : Uranium Hexafluoride )Information Notice 1990-17, Weight and Center of Gravity Discrepancies for Copes-Vulcan Valves (8 March 1990 , Topic : Earthquake )Information Notice 1990-18, Potential Problems with Crosby Safety Relief Valves Used on Diesel Generator Air Start Receiver Tanks (9 March 1990 )Information Notice 1990-18, Potential Problems With Crosby Safety Relief Valves Used on Diesel Generator Air Start Receiver Tanks (9 March 1990 )Information Notice 1990-19, Potential Loss of Effective Volume for Containment Recirculation Spray at PWR Facilities (14 March 1990 )Information Notice 1990-20, Personnel Injuries Resulting from Improper Operation of Radwaste Incinerators (22 March 1990 )Information Notice 1990-21, Potential Failure of Motor-Operated Butterfly Valves to Operate Because Valve Seat Friction was Underestimated (22 March 1990 )Information Notice 1990-21, Potential Failure of Motor-Operated Butterfly Valves to Operate Because Valve Seat Friction Was Underestimated (22 March 1990 )Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units (23 March 1990 , Topic : Reactor Vessel Water Level )Information Notice 1990-23, Improper Installation of Patel Conduit Seals (4 April 1990 )Information Notice 1990-24, Transportation of Model Spec 2-T Radiographic Exposure Device (10 April 1990 , Topic : Exclusive Use )Information Notice 1990-24, Transportation of Model SPEC 2-T Radiographic Exposure Device (10 April 1990 , Topic : Exclusive Use )Information Notice 1990-25, Loss of Vital AC Power With Subsequent Reactor Coolant System Heat-Up (16 April 1990 )Information Notice 1990-25, Loss of Vital AC Power with Subsequent Reactor Coolant System Heat-Up (16 April 1990 )Information Notice 1990-26, Inadequate Flow of Essential Service Water to Room Coolers and Heat Exchangers for Engineered Safety-Feature Systems (24 April 1990 )Information Notice 1990-27, Clarification of the Recent Revisions to the Regulatory Requirements for Packaging of Uranium Hexafluoride (UF6) for Transportation (30 April 1990 , Topic : Uranium Hexafluoride )Information Notice 1990-28, Potential Error In High Steamline Flow Setpoint (30 April 1990 )Information Notice 1990-28, Potential Error in High Steamline Flow Setpoint (30 April 1990 )Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head (30 April 1990 , Topic : Nondestructive Examination , Liquid penetrant )Information Notice 1990-30, Ultrasonic Inspection Techniques for Dissimilar Metal Welds (1 May 1999 , Topic : Intergranular Stress Corrosion Cracking , Dissimilar Metal Weld , Exclusive Use )Information Notice 1990-31, Update on Waste Form and High Integrity Container Topical Report Review Status, Identification of Problems with Cement Solidification, and Reporting of Waste Mishaps (4 May 1990 , Topic : Process Control Program )Information Notice 1990-31, Update on Waste form and High Integrity Container Topical Report Review Status, Identification of Problems with Cement Solidification, and Reporting of Waste Mishaps (4 May 1990 , Topic : Process Control Program )Information Notice 1990-32, Surface Crack and Subsurface Indications in the Weld of a Reactor Vessel Head (3 May 1990 )Information Notice 1990-33, Sources of Unexpected Occupational Radiation Exposures at Spent Fuel Storage Pools (9 May 1990 , Topic : Overexposure )Information Notice 1990-34, Response to False Siren Activations (10 May 1990 , Topic : Siren )Information Notice 1990-35, Transportation of Type a Quantities of Non-Fissile Radioactive Materials (24 May 1990 , Topic : Siren )Information Notice 1990-37, Sheared Pinion Gear-To-Shaft Keys in Limitorque Motor Actuators (24 May 1990 , Topic : Siren )Information Notice 1990-38, License and Fee Requirements for Processing Financial Assurance Submittals for Decommissioning (6 November 1990 , Topic : Authorized possession limits , Stress corrosion cracking )Information Notice 1990-39, Recent Problems with Service Water Systems (1 June 1990 )Information Notice 1990-40, Results of NRC-Sponsored Testing of Motor-Operated Valves (5 June 1990 , Topic : Weak link , Siren )Information Notice 1990-41, Potential Failure of General Electric Magne-Blast Circuit Breakers and Ak Circuit Breakers (12 June 1990 , Topic : Siren )Information Notice 1990-42, Failure of Electrical Power Equipment Due to Solar Magnetic Disturbances (19 June 1990 , Topic : Loss of Offsite Power , Siren )Information Notice 1990-43, Mechanical Interference with Thermal Trip Function in GE Molded-Case Circuit Breakers (29 June 1990 )... further results