Importance of Proper Response to Self-Identified Violations by LicenseesML031200424 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
01/12/1990 |
---|
From: |
NRC/IE |
---|
To: |
|
---|
References |
---|
IN-90-001, NUDOCS 9001080145 |
Download: ML031200424 (3) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
WASHINGTON, D.C. 20555 January 12, 1990
NRC INFORMATION NOTICE NO. 90-01: IMPORTANCE OF PROPER RESPONSE TO
SELF-IDENTIFIED VIOLATIONS BY
LICENSEES
Addressees
All holders of NRC materials licenses.
Purpose
This information notice is intended to assist licensees in properly responding
to self-identified violations of regulatory requirements. It is expected that
recipients will review this information notice, distribute it to management and
staff involved with licensed activities, including responsible radiation safety
staff, and consider actions, as appropriate, to assure compliance. This infor- mation notice does not constitute any new NRC requirements, and no specific
written response is required.
Description of Circumstances
In several past cases, licensees have attempted to conceal self-identified
violations from NRC, rather than reporting them or recording them to permit
review during an NRC inspection.
Discussion:
NRC expects a high standard of compliance by its licensees and requires that
licensees provide NRC accurate and complete information and that required
records will also be complete and accurate in all material respects. Licensees
should be aware of the importance placed by NRC on licensee programs for self
detection, correction and reporting of violations or errors related to regulatory
requirements. The General Statement of Policy and Procedures for NRC Enforce- ment Actions in Appendix C to 10 CFR Part 2 underscores the importance of
licensees responding promptly and properly to self-identified violations
in two ways.
First, in accordance with its exercise of discretion, NRC will not generally
issue a Notice of Violation for a non-repetitive Severity Level IV or V vio- lation that is self-identified, properly corrected and reported (if required).
For those self-identified licensee violations of a higher Severity Level which
do result in a Notice of Violation with the potential for elevated enforcement, NRC will generally give credit for the licensee's performance in identifying, reporting and correcting the violation in making an enforcement decision.
L6'7- Col
IN 90-01 January 12, 1990 For example, if a licensee failed to conduct a required daily dose calibrator
constancy check, but identified the error, noted it in a record and informed
NRC during the next inspection, NRC would not normally cite the Incident as
a violation if categorized at a Severity Level IV.
On the other hand, NRC will generally take stronger action against licensees
who conceal self-identified violations, Including civil penalties and orders
to modify, suspend or revoke licenses. In addition, the matter may be referred
to the Department of Justice for consideration of criminal prosecution. As an
example, a licensee was found to have not performed a substantial number of
required daily dose calibrator constancy checks and, in addition, its Radiation
Safety Committee (RSC) had not met as required for a considerable length of
time. The licensee had also falsified records to make it appear that the
constancy checks and RSC meetings were taking place. In addition to citing
these violations, NRC issued civil penalties in this case which were increased
by 100% over the base civil penalty for violations of this type, due to the.
number and duration of falsified records.
It is suggested that when a licensee identifies a violation involving an
NRC-required record, the licensee should make a dated notation indicating
identification, either on the record itself or other appropriate documentation
retrievable for NRC review. The record with the self-identified violation
noted should not be altered in any way to mask the correction. The licensee
should determine the cause of the violation, correct the root cause of the
violation, and-documentt-such-findings inrrar-appropriate-mann r-.--ttcensees -
should also assure that if a report of the violation is required, the report
is submitted to NRC in a timely manner. These actions will be considered by
NRC in making any enforcement decision, and generally lead to lesser or no
civil penalty.
No specific action or written response is required by this information notice.
If you have any questions about this matter, please contact the technical
contact listed below or the appropriate NRC regional office.
. . .z
Richard E. Cunningham, Director
Division of Industrial and
Medical Nuclear Safety
Office of Nuclear Material Safety
and Safeguards
Technical Ccntact: George Pangburn, NMSS
(301) 492-0628
1. List of Recently Issued NMSS Information Notices
2. List of Recently Issued NRC Information Notices
Attachment 1 Attachment ?.-
IN 90-01 IN 90-01 January 12. 1990 January 12, 1990 Page I of 1 I
LIST OF RECENTLY ISSUED LIST OF RECENTLY ISSUED
NlSS INFORMATION NOTICES NRC INFORMATION NOTICES
T.famatin. lh.t *f
InformtIon Date of Nlotice No.
Notice NO. Subject Issuance Issued to SubJect Issuance Issued to- -
89-90 Pressurizer Safety Valve 12/28/89 All holders of OLs
89-82 Recent Safety-Related 12/07/89 All U.S. NRC licensees Lift Setpoint Shift or CPs for PWRs.
Incidents at Large authorized to possess
Irradiators and use sealed sources 89-89 Event Notification 12/26/89 All holders of OLs
at large irradiators. Worksheets or CPs for nuclear
power reactors.
89-78 Faflure of Packing Nuts on 11/22/89 All U.S. NRC licensees
one-Inch Uranium Hexafluoride authorized to possess 89-88 Recent NRC-Sponsored 12/26/89 All holders of OLs
Cylinder Valves and use source material Testing of Motor-Operated or CPs for nuclear
and/or special nuclear Valves power reactors.
material for the heating.
emptying, filling, or 89-87 Disabling of Emergency 12/19/89 All holders of OLs
shipping of uranium Diesel Generators by or CPs for nuclear
hexafluoride in30- and Their Neutral Ground-Fault power reactors.
48-inch diameter cylinders. Protection Circuitry
89-60 Naintenance of Teletherapy 08/18/89 All U.S. NRC Medical 89-45. Metalclad, Low-Voltage 12/15/89 All holders of OLs
Units Teletherapy Licensees. Supp. 2 Power Circuit Breakers or CPs for nuclear
Refurbished with power reactors.
89-47 Potential Problems with 05/18/89 All holders of operating Substandard Parts
Worn or Distorted Hose licenses or construction
Clamps on Self-Contained permits for nuclear power 89-86 Type HK Circuit Breakers 12/15/89 All holders of OLs
Breathing Apparatus reactors and fuel Missing Close Latch Anti- or CPs for nuclear
facilities. Shock Springs. power reactors.
89-46 Confidentiality of 05/11/89 All holders of licenses 89-85 EPA's Interim Final Rule 12/15/89 All medical, academic, Exercise Scenarios for fuel cycle facilities on Medical Waste Tracking industrial, waste
and byproduct material and Management broker, and waste
licensees having an disposal site licensees
approved emergency
response plan. 89-84 Failure of Ingersoll Rand 12/12/89 All holders of OLs
Air Start Motors as a Result or CPs for nuclear
89-37 Proposed aendments to 40 04/04/89 All U.S. NRC licensees. of Pinion Gear Assembly power reactors.
CFR Part 61, Air Emission Fitting Problems
Standards for Radionuclides
89-83 Sustained Degraded Voltage 12/11/89 All holders of OLs
89-35 Loss and Theft of Unsecured 03/30/89 All U.S. NRC byproduct. on the Offsite Electrical or CPs for nuclear
Licensed Material source and special Grid and Loss of Other power reactors.
nuclear material licensees. Generating Stations as
a Result of a Plant Trip
89-34 Disposal of Americium 03/30/89 All holders of U.S. NRC
Well-Logging Sources specific licenses
authorizing well-logging OL
activities. CP = Construction Permit
|
---|
|
list | - Information Notice 1990-01, Importance of Proper Response to Self-Identified Violations by Licensees (12 January 1990, Topic: Uranium Hexafluoride)
- Information Notice 1990-02, Potential Degradation of Secondary Containment (22 January 1990)
- Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm (23 January 1990, Topic: Liquid penetrant)
- Information Notice 1990-04, Cracking of the Upper Shell-to-Transition Cone Girth Welds in Steam Generators, (26 January 1990, Topic: Nondestructive Examination)
- Information Notice 1990-05, Inter-System Discharge of Reactor Coolant (29 January 1990)
- Information Notice 1990-06, Potential for Loss of Shutdown Cooling While at Low Reactor Coolant Levels (29 January 1990)
- Information Notice 1990-07, New Information Regarding Insulation Material Performance and Debris Blockage of PWR Containment Sumps (30 January 1990)
- Information Notice 1990-08, KR-85 Hazards from Decayed Fuel (1 February 1990)
- Information Notice 1990-08, KR-85 Hazards From Decayed Fuel (1 February 1990)
- Information Notice 1990-09, Extended Interim Storage of Low-Level Radioactive Waste by Fuel Cycle and Materials Licensees (5 February 1990, Topic: Decommissioning Funding Plan)
- Information Notice 1990-10, Primary Water Stress Corrosion Cracking (PWSCC) of Inconel 600 (23 February 1990, Topic: Boric Acid, Hydrostatic, Liquid penetrant)
- Information Notice 1990-10, Primary Water Stress Corrosion Cracking of Inconel 600 (23 February 1990, Topic: Boric Acid, Hydrostatic, Nondestructive Examination, Liquid penetrant)
- Information Notice 1990-11, Maintenance Deficiency Associated with Solenoid-Operated Valves (28 February 1990)
- Information Notice 1990-12, Monitoring or Interruption of Plant Communications (28 February 1990)
- Information Notice 1990-13, Importance of Review and Analysis of Safeguards Event Logs (5 March 1990)
- Information Notice 1990-14, Accidental Disposal of Radioactive Materials (6 March 1990, Topic: Brachytherapy)
- Information Notice 1990-15, Reciprocity Notification of Agreement State Radiation Control Directors Before Beginning Work in Agreement States (17 March 1990, Topic: Uranium Hexafluoride)
- Information Notice 1990-16, Compliance with New Decommissioning Rule (7 March 1990)
- Information Notice 1990-17, Weight and Center of Gravity Discrepancies for Copes-Vulcan Valves (8 March 1990, Topic: Earthquake)
- Information Notice 1990-18, Potential Problems with Crosby Safety Relief Valves Used on Diesel Generator Air Start Receiver Tanks (9 March 1990)
- Information Notice 1990-18, Potential Problems With Crosby Safety Relief Valves Used on Diesel Generator Air Start Receiver Tanks (9 March 1990)
- Information Notice 1990-19, Potential Loss of Effective Volume for Containment Recirculation Spray at PWR Facilities (14 March 1990)
- Information Notice 1990-20, Personnel Injuries Resulting from Improper Operation of Radwaste Incinerators (22 March 1990)
- Information Notice 1990-21, Potential Failure of Motor-Operated Butterfly Valves to Operate Because Valve Seat Friction was Underestimated (22 March 1990)
- Information Notice 1990-21, Potential Failure of Motor-Operated Butterfly Valves to Operate Because Valve Seat Friction Was Underestimated (22 March 1990)
- Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units (23 March 1990, Topic: Reactor Vessel Water Level)
- Information Notice 1990-23, Improper Installation of Patel Conduit Seals (4 April 1990)
- Information Notice 1990-24, Transportation of Model Spec 2-T Radiographic Exposure Device (10 April 1990)
- Information Notice 1990-24, Transportation of Model SPEC 2-T Radiographic Exposure Device (10 April 1990)
- Information Notice 1990-25, Loss of Vital AC Power With Subsequent Reactor Coolant System Heat-Up (16 April 1990)
- Information Notice 1990-25, Loss of Vital AC Power with Subsequent Reactor Coolant System Heat-Up (16 April 1990)
- Information Notice 1990-26, Inadequate Flow of Essential Service Water to Room Coolers and Heat Exchangers for Engineered Safety-Feature Systems (24 April 1990)
- Information Notice 1990-27, Clarification of the Recent Revisions to the Regulatory Requirements for Packaging of Uranium Hexafluoride (UF6) for Transportation (30 April 1990)
- Information Notice 1990-28, Potential Error In High Steamline Flow Setpoint (30 April 1990)
- Information Notice 1990-28, Potential Error in High Steamline Flow Setpoint (30 April 1990)
- Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head (30 April 1990, Topic: Nondestructive Examination, Liquid penetrant)
- Information Notice 1990-30, Ultrasonic Inspection Techniques for Dissimilar Metal Welds (1 May 1999, Topic: Dissimilar Metal Weld)
- Information Notice 1990-31, Update on Waste Form and High Integrity Container Topical Report Review Status, Identification of Problems with Cement Solidification, and Reporting of Waste Mishaps (4 May 1990, Topic: Process Control Program)
- Information Notice 1990-31, Update on Waste form and High Integrity Container Topical Report Review Status, Identification of Problems with Cement Solidification, and Reporting of Waste Mishaps (4 May 1990, Topic: Process Control Program)
- Information Notice 1990-32, Surface Crack and Subsurface Indications in the Weld of a Reactor Vessel Head (3 May 1990)
- Information Notice 1990-33, Sources of Unexpected Occupational Radiation Exposures at Spent Fuel Storage Pools (9 May 1990)
- Information Notice 1990-34, Response to False Siren Activations (10 May 1990)
- Information Notice 1990-35, Transportation of Type a Quantities of Non-Fissile Radioactive Materials (24 May 1990)
- Information Notice 1990-37, Sheared Pinion Gear-To-Shaft Keys in Limitorque Motor Actuators (24 May 1990)
- Information Notice 1990-38, License and Fee Requirements for Processing Financial Assurance Submittals for Decommissioning (6 November 1990, Topic: Authorized possession limits)
- Information Notice 1990-39, Recent Problems with Service Water Systems (1 June 1990)
- Information Notice 1990-40, Results of NRC-Sponsored Testing of Motor-Operated Valves (5 June 1990, Topic: Weak link)
- Information Notice 1990-41, Potential Failure of General Electric Magne-Blast Circuit Breakers and Ak Circuit Breakers (12 June 1990)
- Information Notice 1990-42, Failure of Electrical Power Equipment Due to Solar Magnetic Disturbances (19 June 1990)
- Information Notice 1990-43, Mechanical Interference with Thermal Trip Function in GE Molded-Case Circuit Breakers (29 June 1990)
... further results |
---|