August 8, 2019

SUBJECT:

RIVER BEND STATION - INTEGRATED INSPECTION REPORT 05000458/2019002

Dear Mr. Vercelli:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On July 2, 2019, the NRC inspectors discussed the results of this inspection with Mr. Keith Crissman, Senior Manager, Projects and Maintenance Support, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at River Bend Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Cale H. Young, Acting Chief Reactor Project Branch C

Docket No. 05000458 License No. NPF-47

Enclosure:

Inspection Report 05000458/2019002 w/attachment: Request for Information for the

O

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2019002

Enterprise Identifier: I-2019-002-0009

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

St. Francisville, LA

Inspection Dates:

April 1, 2019 to June 30, 2019

Inspectors:

I. Anchondo-Lopez, Reactor Inspector

R. Kumana, Senior Resident Inspector

L. Merker, Acting Senior Resident Inspector

J. O'Donnell, Health Physicist

B. Parks, Resident Inspector

D. Proulx, Senior Project Engineer

T. Steadham, Senior Resident Inspector, Grand Gulf Nuclear Station

Approved By:

Cale H. Young, Acting Chief

Reactor Project Branch C

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at River Bend Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Place a Division of Reactor Protection System in Trip After Falling below the Minimum Required Intermediate Range Monitor Channels During Startup Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000458/2019002-01 Closed

[H.14] -

Conservative Bias 71111.15 The inspectors identified a Green, non-cited violation of Technical Specification (TS) 3.3.1.1,

RPS Instrumentation, for the licensee's failure to take required actions for inoperable intermediate range monitors (IRM). Specifically, while operating in Mode 2, the licensee failed to place an IRM channel in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of falling below the minimum number of required channels for a reactor protection system (RPS) division.

Additional Tracking Items

None.

PLANT STATUS

River Bend Station began the inspection period shut down in Mode 5 for refueling outage RF-20. The station performed a reactor startup on May 11, 2019, ending the outage. The unit reached 87 percent power and remained there while waiting to perform a rod pattern adjustment.

On May 22, 2019, the operators reduced power to 36 percent due to an oil leak from a reactor recirculation pump transformer. On May 24, 2019, the operators restored the reactor recirculation pump and resumed the reactor startup. The unit reached 90 percent power and remained there while waiting to perform a rod pattern adjustment.

On May 28, 2019, the operators reduced power to 65 percent due to a feedwater heater leak.

The station commenced a normal reactor shut down on May 31, 2019, to repair the leak.

On May 31, 2019, during the planned shutdown, the operators inserted a manual scram due to an unplanned loss of reactor feedwater. The plant remained shut down following the scram to repair the feedwater heater leak.

On June 6, 2019, the station performed a reactor startup. On June 8, 2019, the unit reduced power from 76 percent to 36 percent due to another oil leak on the reactor recirculation pump transformer. On June 11, 2019, the operators restored the reactor recirculation pump and resumed the reactor startup.

On June 17, 2019, the unit reached 100 percent power. Power remained at or near 100 percent for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems on June 26, 2019.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Alternate decay heat removal system on April 4, 2019
(2) Division III emergency diesel generator system on May 10, 2019
(3) Division I standby liquid control system on May 16, 2019
(4) Division II residual heat removal system on June 20, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Standby switchgear 1B room, fire area C-14, on May 2, 2019
(2) Division III diesel generator room, fire area DG-5/Z-1, on May 10, 2019
(3) Standby liquid control area, fire area RC-4/Z-4, on May 16, 2019
(4) Heating, ventilation, and air conditioning 1A/B room, fire area C-4, on June 18, 2019

71111.08G - Inservice Inspection Activities (BWR)

BWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding

Activities (IP Section 03.01)

The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk--significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 15 to April 18, 2019:

03.01.a - Nondestructive Examination and Welding Activities.

The inspectors directly observed or reviewed records of the following nondestructive activities:

1. Ultrasonic Examination

a. Weld FWS-39A-SW007, Report Number ISI-UT-19-004, pipe--to--tee weld on feedwater system

b. Weld MSS-700A2-SW08F, Report Number ISI-UT-19-007, pipe--to--sweepolet weld

c. Weld RCS-900C-SW011BB, Report Number ISI-UT-19-011, pipe--to--elbow weld on reactor coolant system d. Weld RCS-900CX-SW014CA, Report Number ISI-UT-19-013, tee--to--reducer on reactor coolant system

e. Weld B13-D001-N04B-0, Report Number ISI-UT-19-022, inner--radius nozzle examination on reactor pressure vessel

f. Weld B13-D001-N04B-1, Report Number ISI-UT-19-022, nozzle--to--shell weld on reactor pressure vessel

g. Weld B13-D001-DP, Report Number ISI-UT-19-031, reactor vessel head meridional weld

h. Weld B13-D001-DR, Report Number ISI-UT-19-032, reactor vessel head meridional weld

2. Magnetic Particle Examination

a. Weld B13-D001-AG, reactor vessel head--to--flange weld

3. Radiographic Examination

a. Weld FW-XI-1, Report Number BOP-RT-19-001, pipe--to--valve weld

Identification and Resolution of Problems:

The inspector reviewed 20 notifications that dealt with inservice inspections issues and found that items were entered into the corrective action program at the appropriate level and addressed appropriately.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the plant's return to steady state full power after a refueling outage on May 11, 2019.
(2) The inspectors observed and evaluated licensed operator performance in the control room during the plant's startup following an outage on June 6, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated a licensed operator simulator training session on May 31, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

Functional failure review of standby liquid control system on June 30, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Yellow risk during shutdown operation due to having primary containment open with reactor water level less than 23 feet above the reactor flange on April 2, 2019
(2) Yellow risk with Division II fuel building filter train out of service during fuel movement on April 5, 2019
(3) Yellow risk with containment open, Division I spent fuel pool cooling pump out of service, and Division I fuel building filter train out of service during fuel movement on May 1, 2019
(4) Yellow risk during surveillance testing of Division II containment unit cooler on June 19, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (3 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Division II containment unit cooler after failed surveillance test on April 4, 2019
(2) Standby liquid control system after discovery of a leak on vent valve SLS-V40 during system pressure testing on May 9, 2019
(3) Intermediate range monitor H after failure of low frequency amplifier on June 15, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Design Change Package 76014, "Feedwater Debris Strainer (FWDS) Evaluation and Installation"
(2) Design Change Package 79604, "Feedwater Sparger Nozzle Repair"

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the following post-maintenance tests:

(1) Work Order 00472643 following modification of Division II emergency diesel generator voltage regulator circuit per engineering change 71133 on April 12, 2019
(2) Work Order 00521918 following relay replacement and breaker adjustment on Division II containment unit cooler on April 23, 2019
(3) Work Order 52772211 following replacement of standby liquid control injection pipe on May 3, 2019
(4) Work Order 00412852, as left leakage test of B21-MOVF067D and B21-AOVF028D, on May 3, 2019
(5) Work Order 00523781 following replacement of control switch in Division I containment unit cooler after surveillance test failure on May 9, 2019
(6) Work Order 00512270 following repair of jacket water leak on Division I emergency diesel generator on June 3, 2019
(7) Work Order 00512098 following modification of Division I control building air conditioning system on June 19, 2019
(8) Work Order 52747086 following modification of reactor core isolation cooling pump overspeed device on June 25, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (2 Samples)

(1) The inspectors evaluated refueling outage RF-20 activities from March 29, 2019 to May 10, 2019.
(2) The inspectors evaluated planned outage PO-19-01 activities from June 1, 2019 to June 7, 2019.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

STP-107-3807, Revision 005, Feedwater Penetration KJB-Z3B Valve Leak Rate Test, on June 3, 2019

Inservice Testing (IP Section 03.01) (1 Sample)

STP-201-6601, Revision 305, Standby Liquid Control System Refuel Injection Test, on April 30, 2019

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

STP-207-4250, Revision 19, RCS-Identified and Unidentified Leakage Detection System (DFR-LT105/ESX105/LI105, DFR-LT107/ESX107/LI107, DFR-LT128/ESX128/LI128, DER-LT118/ESX118/LI118, DER-LT119/ESX119/LI119, E31-R618, DER-KC174), on May 8, 2019

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1) STP-309-0201, Revision 63, Division I Diesel Generator Operability Test, on April 17, 2019
(2) STP-509-4801, Revision 008, Main Turbine Bypass System Functional Test Response Time Test and Logic System Functional Test of FWS Main Turbine Trip System, on May 11,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Contamination and Radioactive Material Control (IP Section 02.03) (1 Sample)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:

  • C-179, Am241Be Neutron Source
  • 6019, Cs137 Panoramic Irradiator

10171, Cs137 Model 28-8C Irradiator High Radiation Area and Very High Radiation Area Controls (IP Section 02.05)

The inspectors evaluated risk--significant high radiation area and very high radiation area controls.

Instructions to Workers (IP Section 02.02) (1 Sample)

The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas.

Radiation work packages:

  • RWP 2019-1917, Under Vessel Activities (Rev. 0)
  • RWP 2019-1953, Bioshield ISI/FAC Activities (Rev. 0)
  • RWP 2019-1926, Drywell Valve Work (AOV/MOV/IVT) Activities (Rev. 1)
  • RWP 2019-1296, RWCU Pump A Seal Replacement (Rev. 0)

Electronic alarming dosimeter alarms:

Labeling of containers:

  • B-25 Boxes on RW 106
  • Ionizer Resin Drums
  • C-Vans on Trailer in RW 106 Truck Bay
  • Tote of Tritiated Water
  • Yellow Radwaste Trash Bags

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician proficiency.

Radiological Hazard Assessment (IP Section 02.01) (1 Sample)

The inspectors evaluated radiological hazards assessments and controls. The inspectors reviewed the following:

Radiological surveys:

Risk significant radiological work activities:

  • RWP 2019-1917, Under Vessel Activities (Rev. 0)
  • RWP 2019-1726, Valve Work (AOV/MOV) Medium & High Risk Activities (Rev. 0)
  • RWP 2019-1800, Refuel Floor Activities (Rev. 0)
  • RWP 2019-1953, Bioshield ISI/FAC Activities (Rev. 0)

Air sample survey records:

  • RBS-AS-2019-004, RWCU Pump Room (Work Area)
  • RBS-AS-RF20-0034, Refuel Floor Activities - Drywell Head Removal
  • RBS-AS-RF20-0032, Drywell - Head Vent
  • RBS-AS-RF20-0040, Reactor Cavity - Cavity Work

Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

Radiological work package for areas with airborne radioactivity:

  • RWP 2019-1800, Refuel Floor Activities (Rev. 0)
  • RWP 2019-1917, Under Vessel Activities (Rev. 0)
  • RWP 2019-1926, Drywell Valve Work (AOV/MOV/IVT) Activities (Rev. 1)

71124.02 - Occupational ALARA Planning and Controls

Implementation of ALARA and Radiological Work Controls (IP Section 02.03) (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:

  • RWP 2019-1917, Under Vessel Activities (Rev. 0)
  • RWP 2019-1800, Refuel Floor Activities (Rev. 0)
  • RWP 2019-1555, Refueling Activities on Fuel Building 113 (Rev. 1)
  • RWP 2019-1926, Drywell Valve Work (AOV/MOV/IVT) Activities (Rev. 1)

Radiation Worker Performance (IP Section 02.04) (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance during the removal of local power range monitors (LPRMs) from under the vessel, the vacuuming of the reactor vessel, the survey of the cavity, the ultrasonic cleaning of the fuel, and the repacking of the recirculation B flow control valve.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

April 1, 2018 - March 31, 2019

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

April 1, 2018 - March 31, 2019

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

April 1, 2018 - March 31, 2019

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

October 1, 2018 - March 31, 2019

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:

Foreign material in the feedwater system and resulting feedwater debris strainer modification evaluation and installation

Semiannual Trend Review (IP Section 02.02) (1 Sample)

The inspectors reviewed the licensees corrective action program for potential adverse trends in the area of corrective maintenance that might be indicative of a more significant safety issue. During the first half of the year, the inspectors observed an adverse trend in corrective maintenance. The licensee performed maintenance on several safety--related or risk--significant components that subsequently failed, requiring rework. The inspectors noted examples including a repeat failure of an intermediate range monitor, a repeat failure of a recirculation pump transformer, and inadequate maintenance of a recirculation pump motor bearing lubrication system.

These failures have been documented in the corrective action program.

71153 - Followup of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)

The inspectors evaluated personnel performance in the control room during a reactor scram initiated in response to a loss of feedwater on May 31,

INSPECTION RESULTS

Failure to Place a Division of Reactor Protection System in Trip After Falling below the Minimum Required Intermediate Range Monitor Channels During Startup Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000458/2019002-01 Closed

[H.14] -

Conservative Bias 71111.15 The inspectors identified a Green, non-cited violation of Technical Specification (TS) 3.3.1.1, RPS Instrumentation, for the licensee's failure to take required actions for inoperable intermediate range monitors (IRMs). Specifically, while operating in Mode 2, the licensee failed to place an IRM channel in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of falling below the minimum number of required channels for a reactor protection system (RPS) division.

Description:

At 10:53 a.m. on May 11, 2019, during preparations for a reactor startup, IRM H began to spike, causing a half scram. After declaring the IRM inoperable and placing it in bypass, the licensee reset the half scram and proceeded with a Mode 2 startup.

At 1:50 p.m. on May 11, 2019, with the reactor startup underway, IRM F failed downscale.

With IRMs F and H both inoperable, the licensee no longer met the minimum IRM channel requirements of TS 3.3.1.1. The licensee therefore entered condition A of TS 3.3.1.1, which required placing one of the affected channels in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

At 2:11 p.m. on May 11, 2019, the licensee noted that IRM H was now tracking with other instrument channels. The licensee therefore took IRM H out of bypass and placed IRM F in bypass.

At 4:43 p.m. on May 11, 2019, the licensee completed an operability evaluation on IRM H and determined that the IRM was inoperable because it was reading abnormally low on ranges 1 through 6.

At 1:10 a.m. on May 12, 2019, approximately 40 minutes prior to the 12-hour action statement deadline, the licensee completed a second version of the operability determination on IRM H. The licensee determined that the low reading on the instrument was due to the failure of a low frequency amplifier that only affected the instruments on ranges 1 through 6.

Since reactor power had since increased to a power level corresponding to range 7, the licensee noted that the instrument was capable of performing its safety function in the current plant condition and concluded that it was operable. The licensee therefore exited TS 3.3.1.1 without taking an instrument to trip.

River Bend Station TS define operability as a condition in which a component is capable of performing its specified safety function(s). The basis document for TS and the Updated Final Safety Analysis Report for the station specify that the safety function of IRMs is to monitor neutron flux levels from the upper range of the source range monitors to the lower range of the average power range monitors. With ranges 1 through 6 on IRM H reading erroneously low in the presence of a failed amplifier, IRM H was not capable of performing this function.

The inspectors concluded that the fact that IRM 'H' was capable of correctly monitoring power at the specific power level at which the plant happened to be operating when the second operability determination was completed was not a valid basis for concluding that the IRM was operable to meet TS requirements. Because power levels can change in unexpected and uncontrolled ways, operable nuclear instruments must be capable of performing their specified safety functions at all power levels that fall within a given mode of applicability.

IRM 'H' was not capable of doing so and was therefore inoperable.

Corrective Actions: At the time that the violation was identified, the plant was not in a mode of applicability that required the IRM instruments to be operable. The licensee subsequently conducted maintenance that restored the instruments to operable status.

Corrective Action References: CR-RBS-2019-04655

Performance Assessment:

Performance Deficiency: The failure to complete actions required by plant TS for inoperable IRMs within the required time frame was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems cornerstone. Specifically, by failing to take the required TS action for multiple failed instruments on an RPS division, the licensee continued to operate in a mode of applicability without meeting a TS limiting condition for operation, thus reducing the availability, reliability, and capability of the Division II RPS system to generate trip signals during postulated accident sequences that can occur during startup in the intermediate range.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using "Exhibit 2 --

Mitigating Systems Screening Questions, Section C, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not affect the function of other redundant trips and did not involve control manipulations or mismanagement of reactivity by operators.

Cross-Cutting Aspect: H.14 - Conservative Bias: Individuals use decision making-practices that emphasize prudent choices over those that are simply allowable. A proposed action is determined to be safe in order to proceed, rather than unsafe in order to stop. Specifically, the licensee accepted an incomplete justification for the operability of IRM 'C' instead of conducting a thorough review of the instrument's ability to perform its specified safety function.

Enforcement:

Violation: TS 3.3.1.1 requires, in part, that three IRM channels be operable in each division in Mode 2. For conditions in which less than three IRM channels are operable in a division in Mode 2, action A.1 requires the licensee to place an affected channel or the affected division in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If this action is not taken in the required amount of time, action H.1 requires the licensee to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Contrary to the above, from May 12, 2019, to May 13, 2019, while operating in Mode 2 with less than three operable IRM channels in Division II, and after failing to place an affected channel or the division in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the licensee failed to place the unit in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The licensee restored compliance by exiting the mode of applicability for the affected function of TS 3.3.1.1 on May 13, 2019.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2019, the inspectors presented the inservice inspection results to Mr. S. Vercelli, Site Vice President, and other members of the licensee staff.
  • On April 19, 2019, the inspectors presented the occupational radiation safety baseline inspection results to Mr. K. Scott, General Manager, Plant Operations, and other members of the licensee staff.
  • On July 2, 2019, the inspectors presented the integrated inspection results to Mr. K. Crissman, Senior Manager, Projects and Maintenance Support, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Drawings

PID-27-08A

Engineering P & I Diagram System 656 Suppression Pool

Clean Up/Alternate Decay Heat Removal

71111.04

Miscellaneous

Main Control Room Logs 03/29/2019 - 04/04/2019

04/04/2019

71111.04

Procedures

OPS-0041

Alternate Decay Heat Removal

308

71111.04

Procedures

SOP-0140

Suppression Pool Cleanup and Alternate Decay Heat

Removal (Sys #656)

71111.08G Corrective Action

Documents

CR-RBS-

2017-01066, 2017-01119, 2017-01299, 2017-03470, 2017-

06458, 2017-06676, 2017-01484, 2017-01559, 2017-01622,

2017-02199, 2017-02865, 2017-06152, 2018-01429, 2018-

01786, 2018-03540, 2018-05906, 2018-06472, 2018-05294,

2018-05782

71111.08G Drawings

ES-54AE-4

RPV Insulation Support Elevation Reactor Building

71111.08G Drawings

RBS-ISI-018

Bolting Arrangement & Weld Map

71111.08G Miscellaneous

SEP-ISI-RBS-001

Program Section for ASME Section XI, Division 1 RBS

Inservice Inspection Program

71111.08G Procedures

CEP-NDE-0255

Radiographic Examination ASME, ANSI, AWS, API, AWWA,

Welds and Components

71111.08G Procedures

CEP-NDE-0404

Manual Ultrasonic Examination of Ferritic Piping Welds

(ASME XI)

71111.08G Procedures

CEP-NDE-0423

Manual Ultrasonic Examination of Austenitic Piping Welds

(ASME Section XI)

71111.08G Procedures

CEP-NDE-0731

Magnetic Particle Examination (MT) for ASME Section XI

71111.08G Procedures

GE-UT-300

Procedure for Manual Examination of Reactor Vessel

Assembly Welds in Accordance with Performance

Demonstration Initiative (PDI)

71111.08G Procedures

WDI-STD-006

Manual Ultrasonic Procedure for Examination of Nozzle

Inner Corner Radius Areas in Accordance with ASME

Section XI, Including Appendix VIII

71111.08G Procedures

WDI-STD-1107

Generic Procedure for the Manual Ultrasonic Examination of

Reactor Pressure Vessel Welds in Accordance with PDI-UT-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Corrective Action

Documents

CR-RBS-

2017-01346, 2017-02681, 2017-02766, 2018-02771, 2018-

2956, 2019-00347, 2019-00632, 2019-00784, 2019-00943,

2019-01224,

71111.12

Procedures

EN-DC-203

Maintenance Rule Program

71111.12

Procedures

EN-DC-204

Maintenance Rule Scope and Basis

71111.12

Procedures

EN-DC-205

Maintenance Rule Monitoring

71111.12

Procedures

EN-DC-206

Maintenance Rule (A)(1) Process

71111.12

Procedures

SOP-0028

Standby Liquid Control (Sys #201)

71111.12

Work Orders

WO 2356497, 52641444, 52764460

71111.13

Corrective Action

Documents

CR-RBS-

2019-03017

71111.13

Miscellaneous

Outage Risk Assessment Team RF-20 Outage Report

03/18/2019

71111.13

Procedures

EN-OU-108

Shutdown Safety Management Program (SSMP)

71111.13

Procedures

OSP-0034

Control of Obstructions for Primary Containment/Fuel

Building Operability

71111.13

Procedures

OSP-0037

Shutdown Operations Protection Plan (SOPP)

71111.13

Procedures

OSP-0037

Shutdown Operations Protection Plan (SOPP)

71111.13

Procedures

STP-057-3804

Containment Breach Monitoring

71111.13

Work Orders

WO 2825116

71111.15

Corrective Action

Documents

CR-RBS-

2019-01787

71111.15

Procedures

EN-OP-104

Operability Determination Process

016

71111.15

Procedures

EOP-0002

Emergency Operating Procedure - Primary Containment

Control

017

71111.15

Procedures

SOP-0059

Containment HVAC System (Sys #403)

038

71111.15

Procedures

STP-309-0602

Division II ECCS Test

047

71111.18

Calculations

AX-017C

Feedwater - Headers to Reactor and Startup Recirculation

71111.18

Calculations

G13.18.1.0-045

River Bend Feedwater Sparger Repair - Analysis of Repair

on Existing Equipment

71111.18

Calculations

G13.18.1.0-046

River Bend Feedwater Sparger Repair - Fracture Mechanics

Analysis

71111.18

Calculations

G13.18.2.7*107

Loss of One Feed Pump - SCRAM Avoidance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.18

Calculations

G13.18.2.7-119

RBS-FWS-P-001 - Water Hammer Analysis of Feedwater

System for Pump Trip and Valve Operation Hydraulic

Transients

71111.18

Calculations

G13.18.4.0-064

Hydraulic Analysis to Support River Bend Feedwater

Sparger Repair

71111.18

Calculations

PH-092

Revision of Condensate and Feedwater System Pressure

Drop

71111.18

Calculations

Z-17-214

Pipe Support

71111.18

Corrective Action

Documents

CR-RBS-

2018-00613

71111.18

Drawings

004N8149

Feedwater Debris Strainer

71111.18

Engineering

Changes

EC 76014

Feedwater Debris Strainer (FWDS) Evaluation and

Installation

71111.18

Engineering

Changes

EC 79064

Feedwater Sparger Nozzle Repair

71111.18

Miscellaneous

Independent Third Party Review of Feedwater Debris

Strainer Design Documents

2/08/2019

71111.18

Miscellaneous

FWS-DPT201A & FWS-DPT201B Set Point Data Sheets

71111.18

Miscellaneous

004N5996

River Bend Station Feedwater Debris Strainer Feasibility

Study

71111.18

Miscellaneous

100413-Calc-1

GE-Hitachi Housing Strainer Flange Calculation

71111.18

Miscellaneous

RBS-ME-19-

00003

Design Analyses and Evaluation of Flow Test Verification of

a 24-Inch Feedwater Strainer

71111.18

Miscellaneous

SDC-050

Reactor Vessel and Internals

71111.18

Miscellaneous

SDC-107

Feedwater System Design Criteria

71111.18

Miscellaneous

SEP-RVI-003

River Bend Station Reactor Vessel Internals (RVI)

Inspection Program Plan

71111.18

Miscellaneous

SL-RBS-17-004

Completion of the Independent Third Party Review of GEH

Feedwater Debris Study Feasibility Study

2/20/2017

71111.18

Work Orders

WO 00497513

71111.19

Corrective Action

Documents

CR-RBS-

2019-01787, 2019-02348, 2019-02533, 2019-02745, 2019-

2755, 2019-02757

71111.19

Miscellaneous

Certified Material Test Report for Stainless Steel Pipe, Heat

Number 544668

04/29/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Miscellaneous

ASME Repair &

Replacement

Plan CEP-RR-

2

Replace a Section of SLS-150-037-1 Piping

04/28/2019

71111.19

Miscellaneous

Procedure

Qualification

Record 107

Manual Gas Tungsten & Shielded Metal Arc Welding

71111.19

Miscellaneous

Procedure

Qualification

Record 170

Manual Gas Tungsten & Shielded Metal Arc Welding

71111.19

Miscellaneous

Procurement

Engineering

Evaluation

00194438

Stainless Steel Seamless Pipe

04/27/2019

71111.19

Miscellaneous

SDC-201

Standby Liquid Control System Design Criteria

71111.19

Miscellaneous

Welding

Procedure

Specification

CEP-WP-002

Manual Gas Tungsten Arc Welding

04/29/2010

71111.19

NDE Reports

BOP-VT-19-022

Visual Inspection of SLC Injection Pipe

04/26/2019

71111.19

Procedures

EN-DC-115

Engineering Change Process

26

71111.19

Procedures

EN-WM-107

Post-Maintenance Testing

005

71111.19

Procedures

STP-309-0207

Division II Diesel Generator 184 Day Operability Test

28

71111.19

Procedures

STP-309-0602

Division II ECCS Test

047

71111.19

Procedures

STP-403-1201

HVR-UC1B System B Timer Channel Functional Test

006

71111.19

Work Orders

WO 00472643, 00506188, 00511497, 00521918

71111.20

Calculations

G13.18.14*189-3

Time to Boil, Heat Up Rate, and Time to Top of Active Fuel

Curves Accounting for Power Uprate

71111.20

Calculations

G13.18.2.6-190

Reactor Pressure Vessel Water Inventory Control Drain

Time

71111.20

Miscellaneous

Outage Risk Assessment Team RF-20 Outage Report

03/18/2019

71111.20

Procedures

EN-OU-108

Shutdown Safety Management Program (SSMP)

71111.20

Procedures

FHP-0001

Control of Fuel Handling and Refuel Operations

71111.20

Procedures

OSP-0033

RPV Water Inventory Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.20

Procedures

OSP-0037

Shutdown Operations Protection Plan (SOPP)

71111.20

Procedures

OSP-0037

Shutdown Operations Protection Plan (SOPP)

71111.20

Procedures

OSP-0041

Alternate Decay Heat Removal

308

71111.22

Corrective Action

Documents

CR-RBS-

2019-02498, 2019-02883, 2019-02996, 2019-03269

71111.22

Miscellaneous

Main Control Room Logs for April 11, 2019

04/11/2019

71111.22

Miscellaneous

Outage Risk Assessment Team RF-20 Outage Report

03/18/2019

71111.22

Miscellaneous

1.ILDFR.011

Loop Calibration Report

71111.22

Miscellaneous

STP-309-

201R063CN-A

STP-309-0201 One-Time Change Notice Procedure Action

Request

04/11/2019

71111.22

Procedures

STP-201-6601

Standby Liquid Control System Refuel Injection Test

305

71111.22

Procedures

STP-207-4250

RCS-Identified and Unidentified Leakage Detection System

(DFR-LT105/ESX105/LI105, DFR-LT107/ESX107/LI107,

DFR-LT128/ESX128/LI128, DER-LT118/ESX118/LI118,

DER-LT119/ESX119/LI119, E31-R618, DER-KC174)

71111.22

Procedures

STP-309-0201

Division I Diesel Generator Operability Test

71111.22

Work Orders

WO 2500240, 52641444, 52764460, 52766622, 52870113

71124.01

Corrective Action

Documents

CR-RBS-

2018-05978, 2018-06008, 2018-06556, 2019-00332, 2019-

00696, 2019-01158, 2019-01196, 2019-01619, 2019-01739,

2019-01747, 2019-01783, 2019-01845, 2019-01902, 2019-

01999, 2019-02002, 2019-02157

71124.01

Miscellaneous

2019

NSTS Annual Inventory Reconciliation Confirmation

1/30/2019

71124.01

Miscellaneous

RBS-RPT-19-001

Optimization of ARGOS-5AB Whole Body Contamination

Monitors in the Presence of Noble Gases

3/6/2019

71124.01

Miscellaneous

RBS-RPT-19-003

Review of Radiological Data Relevant to RF20

3/20/2019

71124.01

Procedures

EN-RP-100

Radiation Worker Expectations

71124.01

Procedures

EN-RP-101

Access Control for Radiologically Controlled Areas

71124.01

Procedures

EN-RP-102

Radiological Control

71124.01

Procedures

EN-RP-108

Radiation Protection Posting

71124.01

Procedures

EN-RP-121

Radioactive Material Control

71124.01

Procedures

EN-RP-122

Alpha Monitoring

71124.01

Procedures

EN-RP-123

Radiological Controls for Highly Radioactive Objects

71124.01

Procedures

EN-RP-143

Source Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.01

Radiation

Surveys

RBS-1902-0059

FB 70 SFC HX 1A

2/5/2019

71124.01

Radiation

Surveys

RBS-1902-0060

FB 70 SFC HX 1B

2/5/2019

71124.01

Radiation

Surveys

RBS-1903-0419

SB109 Rooms 224& 236

3/26/2019

71124.01

Radiation

Surveys

RBS-1904-1192

TB 67 Chemistry

4/15/2019

71124.01

Radiation

Surveys

RBS-AS-RFO20-

22

Cavity Decon

3/30/2019

71124.01

Radiation

Surveys

RBS-AS-RFO20-

0047

Routine

3/30/2019

71124.01

Self-Assessments 2017

RBS RP 10 CFR 20.1103(c) Report

6/21/2018

71124.01

Self-Assessments LO-RLO-2017-

00075

Pre-NRC Radiological Hazard Assessment and Exposure

Controls (71124.01) & Performance Indicator Verification

(71151-OR01)

1/14/2019

71124.02

ALARA Plans

2019-1500

In-Progress Review (50%)

4/13/2019

71124.02

ALARA Plans

2019-1555

In-Progress Review (50%)

4/13/2019

71124.02

ALARA Plans

2019-1801

In-Progress Review (40%)

4/13/2019

71124.02

Corrective Action

Documents

CR-RBS-

2018-00935, 2018-01567, 2018-03244, 2018-04681, 2018-

05153, 2018-05481, 2018-05973, 2018-06401, 2018-06473,

2019-02006, 2019-02090

71124.02

Miscellaneous

RBS-RPT-19-003

Review of Radiological Data Relevant to RF20

3/20/2019

71124.02

Procedures

EN-RP-110

ALARA Program

71124.02

Procedures

EN-RP-110-01

ALARA Initiative Deferrals

71124.02

Procedures

EN-RP-110-03

Collective Radiation Exposure (CRE) Reduction Guidelines

71124.02

Procedures

EN-RP-110-04

Radiation Protection Risk Assessment Process

71124.02

Radiation Work

Permits (RWPs)

2019-1500

Refueling Activities on FB 113

71124.02

Radiation Work

Permits (RWPs)

2019-1555

RFB 113 Fuel Sipping and Cleaning Operations

71124.02

Radiation Work

Permits (RWPs)

2019-1801

Refuel Floor - Fuel Movements, IVVI, & Support Activities

71124.02

Self-Assessments LO-RLO-2017-

Pre-NRC Occupational ALARA Planning & Controls

10/30/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0055

(71124.02)

71124.02

Self-Assessments QA 14/15 2017

RBS 1

Quality Assurance Audit Report: Combined Radiation

Protection and Radwaste

10/24/2017

The following items are requested for the

Occupational Radiation Safety Inspection

at River Bend Station

Dates of Inspection: 04/08/2019 to 04/19/2019

Integrated Report 2019002

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, March 25, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

The information should be provided in electronic format or a secure document management

service. If information is placed on ims.certrec.com, please ensure the inspection exit date

entered is at least 30 days later than the onsite inspection dates, so the inspectors will have

access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact John O'Donnell at 817-200-1441 or via

e-mail at John.ODonnell@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

1.

Radiological Hazard Assessment and Exposure Controls (71124.01) and

Performance Indicator Verification (71151)

Date of Last Inspection:

November 5, 2018

A.

List of contacts and telephone numbers for the Radiation Protection Organization Staff

and Technicians, as well as the Licensing/Regulatory Affairs staff. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, LARs, and LERs written since the last inspection

date, related to this inspection area

D.

Procedure indexes for the radiation protection procedures and other related disciplines.

E.

Please provide procedures related to the following areas noted below. Additional

procedures may be requested by number after the inspector reviews the procedure

indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations, if not included in #1.

3. Personnel Dosimetry

4. Posting of Radiological Areas

5. High Radiation Area Controls

6. RCA Access Controls and Radiation Worker Instructions

7. Conduct of Radiological Surveys

8. Radioactive Source Inventory and Control

9. Fuel Pool Inventory Access and Control

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) since the last inspection date.

1. Initiated by the radiation protection organization

2. Assigned to the radiation protection organization

NOTE: These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

List of radiologically significant work activities scheduled to be conducted during the

inspection period. (If the inspection is scheduled during an outage, please also include a

list of work activities greater than 1 rem, scheduled during the outage with the dose

estimate for the work activity.) Please include the radiological risk assigned to each

activity.

I.

Provide a summary of any changes to plant operation that have resulted or could result

in a significant new radiological hazard. For each change, please provide the

assessment conducted on the potential impact and any monitoring done to evaluate it.

J.

List of active radiation work permits and those specifically planned for the on-site

inspection week.

K.

Please provide a list of air samples taken to verify engineering controls and a separate

list for breathing air samples in airborne radiation areas or high contamination work

areas. Please include the RWP the breathing air sampling supports.

L.

Please provide the current radioactive source inventory, listing all radioactive sources

that are required to be leak tested. Indicate which sources are deemed 10 CFR Part 20,

Appendix E, Category 1 or Category 2. Please indicate the radioisotope, initial and

current activity (w/assay date), and storage location for each applicable source.

M.

The last two leak test results for all required/applicable radioactive sources that have

failed its leak test within the last two years. Provide any applicable condition reports.

N.

A list of all non-fuel items stored in the spent fuel pools, and if available, their appropriate

dose rates (Contact / @ 30cm)

O.

A list of radiological controlled area entries greater than 100 millirem, since the last

inspection date. The list should include the date of entry, some form of worker

identification, the radiation work permit used by the worker, dose accrued by the worker,

and the electronic dosimeter dose alarm set-point used during the entry (for

Occupational Radiation Safety Performance Indicator verification in accordance with IP 71151).

P.

A list describing VHRAs and TS HRAs (> 1 rem/hour) that are current and historical.

Include their current status, locations, and control measures.

Q.

Temporary effluent monitor locations and calibrations (AMS-4) used to monitor normally

closed doors or off-normal release points (e.g., equipment hatch or turbine heater bay

doors). Include any CRs associated with this monitoring or instrumentation.

2.

Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection:

January 22, 2018

A.

List of contacts and telephone numbers for ALARA program personnel, as well as the

Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell

numbers are appropriate, then please include them as well.

B.

Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C.

Copies of audits, self-assessments, LARs, and LERs, written since the date of last

inspection, focusing on ALARA

D.

Procedure index for ALARA Program procedures and other related disciplines.

E.

Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Planning

3. ALARA Reviews

4. ALARA Committee

5. Radiation Work Permit Preparation

F.

Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G.

Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of last inspection, related to the ALARA

program, including exceeding RWP Dose Estimates.

NOTE: These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H.

List of work activities (RWPs) greater than 1 rem, since date of last inspection,

including the original dose estimates and actual doses accrued. (Excel format

preferred). Please provide all revisions/changes, as well as any related RWPs that

support the work activity.

I.

List of active work activities (RWPs) that will be in use while we are onsite, including the

dose and dose rate settings, and if available, the planned dose. Include planning

documents and surveys. Include radiological risk assessments and proposed control

measures.

J.

Site dose totals for the past 3 years (based on dose of record). Also provide the current

year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide

another document that separates the online and outage doses for the past 3 years.

K.

Most recent assessment of your isotopic mix, including the hard-to-detect radionuclides

and alpha hazards. Include a list of new and historical exposure issues (radiological

source term or high exposure areas/activities).

L.

If available, provide a copy of the lessons learned from the most recently completed

outage for each unit. Include a summary list of any associated corrective action

documents and the current status of any corrective actions assigned.

M.

Please provide the methods/reports that are in your process to meet the requirements of

CFR 20.1101(c) for periodic review of your RP program.

N.