December 2, 2019

SUBJECT:

RIVER BEND STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000458/2019010

Dear Mr. Vercelli:

On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On November 7, 2019, the NRC inspectors discussed the results of this inspection with Mr. K. Scott, General Plant Manager, Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2019010

Enterprise Identifier: I-2019-010-0001

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

St. Francisville, LA

Inspection Dates:

October 21, 2019, to November 7, 2019

Inspectors:

S. Anderson, Health Physicist

C. Hobbs, Reactor Inspector

J. Mateychick, Senior Reactor Inspector

N. Okonkwo, Reactor Inspector

Approved By:

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at River Bend Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05T - Fire Protection Fire Protection Inspection Requirements (IP Section 02.02)

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

(1) AB-1/Z-4 Auxiliary Building - West Side Crescent, 141 Level
(2) C-2 Control Building Cable Chase II
(3) C-15 Division I Standby Switchgear Room
(4) C-25 Control Room

B.5.b Inspection Activities (IP Section 02.03) (1 Sample)

(1) OSP-0066, Revision 31, Attachment 20 - Operation of FPW-P4

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. K. Scott, General Plant Manager, Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05T Calculations

G13.18.14.0*171

Determine if Post-Fire Safe Shutdown SSW loads can be

satisfied with one SSW pump

Corrective Action

Documents

Condition Reports

(CR-RBS-XXX-

YYYYY)

2013-03397, 2016-02953, 2016-03264, 2018-03030, 2018-

03575, 2019-00830, 2019-02524, 2019-05541, 2019-06023,

2019-06086, 2019-06097, 2019-06149, 2019-06801, 2019-

06838, 2019-06839, 2019-07049, 2019-07130, 2019-07134,

2019-07135, 2019-07136, 2019-07188

Corrective Action

Documents

Resulting from

Inspection

Condition Report

(CR-RBS-XXXX-

YYYYY)

2019-6795, 2019-6796, 2019-6805, 2019-6809, 2019-6838,

2019-6839, 2019-6920, 2019-6968, 2019-6989, 2019-7010,

2019-7023, 2019-7134, 2019-7135, 2019-7136, 2019-7140,

2019-7143, 2019-7188

Drawings

210-CBD-

10ANN17-01

Cable Block Diagram, Annunciators

CE-001A

Appendix R Safe Shutdown Analysis Emergency Lighting

Control Building EL. 98'-0"

CE-001C

Appendix R Safe Shutdown Analysis Emergency Lighting

Control Building EL. 136'-0"

CE-001K

Appendix R Safe Shutdown Analysis Emergency Lighting

Auxiliary Building EL. 141'-0"

EE-001AZ

480 V MCC One Line Diagram, General Notes, Symbols,

Location and References

EE-001K

4160V One Line Diagram, Standby Bus ENS-SWG1A

EE-001TA

480V One Line Diagram, EHS-MCC2A & 2L, Auxiliary Building

EE-001TB

480V One Line Diagram, EHS-MCC2C & 2D, Auxiliary Building 13

EE-001TE

480V One Line Diagram, EHS-MCC2J & K, Auxiliary Building

EE-008AQ

4160V Wiring Diagram, Standby Bus ENS-SWG1A

EE-008AR

4160V Wiring Diagram, Standby Bus ENS-SWG1A

EE-008AS

4160V Wiring Diagram, Standby Bus ENS-SWG1A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EE-027A

Arrangement Main Control Room

EE-027C

Arrangement Control BLDG, Standard Switchgear Area

EE-34ZE

Standard Details For Separation Requirement

EE-34ZH

Standard Details For Separation Requirement

EE-34ZJ

Standard Details Installation of Barriers For Separation

ESK-05CSL01,

Sh. 1

Elementary Diagram 4.16KV Low Pressure Core Spray Pump

ESK-05ENS01,

Sh. 1

Elementary Diagram 4.16KV Switchgear Standby Bus 1A

Normal Supply ACB

ESK-05ENS04,

Sh. 1

Elementary Diagram 4.16KV Switchgear Standby Bus 1A

Alternate Supply ACB

ESK-05ENS06,

Sh. 1

Elementary Diagram 4.16KV Switchgear Standby Bus 1A GEN

ACB

ESK-05ENS08,

Sh. 1

Elementary Diagram 4.16KV Switchgear Transformer EJS-

X1A Feeder ACB

ESK-05ENS09,

Sh. 1

Elementary Diagram 4.16KV SWGR XFMR EJS-X2A FDR

ACB

ESK-05ENS14,

Sh. 1

Elementary Diagram 4.16KV SWGR STBY NORM. SPLY ACB

ESK-05ENS16,

Sh. 1

Elementary Diagram 4.16KV SWGR STBY BUS 1A ALTN

SPLY ACB

ESK-05ENS18,

Sh. 1

Elementary Diagram 4.16KV SWGR STBY XFMR 1EJS-3A

FDR ACB

ESK-05RHS01,

Sh. 1

Elementary Diagram 4.16KV Residual Heat Removal Pump

E12-PC002A

ESK-05SWP04,

Sh. 1

Elementary Diagram 4.16KV Switchgear Standby SWP-P2A

ESK-06CSL01,

Sh. 1

Elementary Diagram 480V Control Circuit Low Pressure Core

Spray MOVS

ESK-06RHS06,

Sh. 1

480V Control CKT Residual Heat Removal System

ESK-11SWP05,

Sh. 1

Elementary Diagram, 125V Cont. CKT, Standby Service water

Aux. Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EW-103K

480V One Line Diagram, NHS-MCC-9L2 & L3, Admin

Complex in Services Building

PID-09-100

Engineering P & I D Diagram, System 118, Service Water

Normal

PID-09-10E

Engineering P & I Digram System 256 Service Water -

Standby

PID-23-12B

Engineering P & I Diagram System 609 Drains - Floor and

Equipment

PID-27-06A

Engineering P & I Diagram System 209 reactor core Isolation

Cooling

PID-27-07A

Engineering P & I Diagram System 204 Residual Heat

Removal - LPCI

PID-27-20C

Engineering P & I Diagram System 208 LSV*C3A Copressor

Skid

Updated Safety

Analysis Report

Figure 9A.2-2

Fire Area boundaries Plant Plan View-Elevations 65'-0" to 90'-

0"

Updated Safety

Analysis Report

Figure 9A.2-3

Fire Area Boundaries Plant Plan View -Elevations 83'-0" to

106'-0"

Updated Safety

Analysis Report

Figure 9A.2-4

Fire Area Boundaries Plant Plan View-Elevations 109'-0" to

148'-0"

Updated Safety

Analysis Report

Figure 9A.2-5

Fire Area Boundaries Plant Plan View-Elevations 113'-0" to

186'-0"

WD-84-51380-23-

C97

Schematic and Wiring Diagram for FVR Starter

Engineering

Changes

EC 64599

Backup FPW Connections

EC 71077

Permanent Abandonment of Temperature Control Valves

HVK-TV17A and HVK-TV17B Instrument and Controls

EC 75020

240.201A Mark-Up for Addition of Emergency Lights

EC 75864

Replacement of Transformer RCS-X1B for Recirc Pump B

Motor

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EC 78833

Install Blind Flange on 066-13-4 Line to Stop Leak

EC EE 81170

Engineering Change EC Engineering Temporary Power for

SFC-PIB During RF 20

EC-80650

Spared in Place Automatic Beam Smoke Detection systems in

FLEX Buildings (North and South)

Fire Plans

AB-141-529

Mezzanine Area West Fire Area AB-1/Z-4

CB-070-102

Cable Chase II Fire Area C-2

CB-098-116

Cable Chase II Fire Area C-2

CB-098-118

Standby Switchgear 1A Room Fire Area C-15

CB-116-126

Cable Chase II Fire Area C-2

CB-136-138

Control Room Fire Area C-25

NS-98

Normal Switchgear Building, Elevation 98'

Miscellaneous

1EJSCRC204

1NNSANH309

1NNSANH310

1NNSANH312

1NNSANH306

1NNSANH305

1ENSARH300

1ENBARC619

1ENBARC628

1SWPA2H300

1ENSARH301

1ENSARH304

1ENBARC630

1ENSARC300

1ENSARC301

1ENSARC302

1SYDARC450

1CSLNRC004

1CSLNRC005

1CSLNRK005

1EHSJRL200

1EHSJRL201

Circuits Reviewed

N/A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1EHSCRL202

1EGSARC451

1ENSARC304

1ENSARC307

1ENSARC317

1ENSARC318

1ENSARC319

1ENSARC326

1ENSARC338

1ENSARC450

1ENSARC451

1SYDARC451

1SYDARC452

Design Criterion

240.201A

Post-Fire Safe Shutdown Analysis

EN-DC-330

Fire Protection Program

RBS-FP-17-

00003

River Bend Supplementary MSO Analysis for Fire Area

Outside of the Main Control Room

RBS-FP-17-

00004

River Bend Supplementary MSO Analysis for Appendix R

Alternate Shutdown Areas

SEA-95-001

River Bend Station Engineering Report for Individual Plant

Examination of External Plants (IPEEE)

SEP-FPP-RBS-

001

River Bend Station Fire Protection Program

Updated Final

Safety Analysis

Report Appendix

A

Aging Management

Updated Safety

Analysis Report

Section 9.5.2

Communication Systems

Updated Safety

Analysis Report

Section 9B

Fire Protection Program Comparison With Appendix R to

10CFR50

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Updated Safety

Analysis Report,

Section 9A

Fire Hazards Analysis

Yokogawa

DX2000 Recorder

Operator Code

VTD-Y006-0234

Procedures

0SP-0602

Remote Shutdown System Control Circuit Operability Test

(Switches 43-1HVCN30, 43-1HVCN31 and 43-1HVKA01)

ADM-0037

Equipment Identification and Labeling

018

AOP-0031

Shutdown from Outside the Main Control Room

335

AOP-0052

Fire Outside the Main Control Room in Areas Containing

Safety Related Equipment

CMP-1277

Lugging, Splicing, and Termination of Power, Control and

Instrument Cable.

EN-DC-115

Engineering Change Process

EN-DC-127

Control of Hot Work and Ignition Sources

EN-DC-132

Control of Engineering Documents

EN-DC-161

Control of Combustibles

EN-DC-179

Preparation of Fire Protection Engineering Evaluations

EN-DC-330

Fire Protection Program

EN-WM-105

Firefighting Equipment

11/05/2019

NE-DC-128

Fire Protection Impact Reviews

NEI 00-01

Guidance For Post Fire Safe Shutdown Circuit Analysis

OP-0052

Fire Outside the Main Control Room in Areas Containing

Safety Related Equipment

20

OSP-0066

Extensive Damage Mitigation Procedure

OSP-0600

Remote Shutdown System Control Circuit Operability

(Switches 43-LSVA08 AND 1A-LSV08)

2

OSP-0610

Remote Shutdown System Control Circuit Operability Test

(Switch 43-1EGAN05)

SEP-FFP-RBS-

2

River Bend Station Fire Fighting Procedure

SEP-FPP-RBS-

River Bend Station Fire Protection Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

001

SEP-FPP-RBS-

005

River Bend Station Duties of Fire Watch

SEP-FPP-RBS-

006

Fire Protection System Impairment

004

SOP-0027

Remote Shutdown System (#200)

308

SOP-0031

Residual Heat Removal (Sys #204)

2

SOP-0058

Control Building HVAC System (Sys. #402)

SOP-0061

Diesel Generator Building Ventilation

STP-200-0603

Division III Remote Shutdown System Control Circuit

Operability Test

STP-200-0605

Shutdown System Control Circuit Operability Test (Switches

S1, S6, S7, S8, S9 & S12)

309

STP-200-0606

Remote Shutdown System Control Circuit Operability Test

(Switches S1, S2, S3, S4, S5, and S11)

309

STP-200-0607

Division 1 Remote Shutdown System Control Circuit

Operability Test (Switch S10)

305

STP-200-0613

Remote Shutdown System Control Circuit Operability Test

(Switches 43-1SWPA45, and 43-SWPA46)

004

STP-251-3602

Fire Pump Functional Test

016

TPP-7-021

Fire Protection Training and Qualifications

Self-Assessments LO-RLO-2018-

00010

RBS Fire Protection Focused Self-Assessment

4/18/2019

QA-9-2018-RBS-1 Quality Assurance Audit Report

Work Orders

00046684

EJS-SWG2B Global PM Clean and Inspect, RE

234145

EHS-MCC2J-1C INSTALL BREAKER FROM EHS-MCC16A-

8BT/BB

00446603

STP-251-3700: Fire System Yard Water Suppression Loop

Flow

2427157

STP-303-1700: (Div. 2) Table 4 / EHS-MCC2K-4A (E12-F009)

2442213

STP-000-3604: Fire Barrier Sealed Penetration Inspection

2505675

STP-251-3701: Spray and Sprinkler Open Nozzle Head Air

Flow

2528148

STP-251-3700: Fire System Yard Water Suppression Loop

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Flow

2541735

STP-000-3604: Fire Barrier Sealed Penetration Inspection

2559801

STP-251-7607: FPW-P1A Fire Pump Engine 72 Month

Inspection

2572828

Post Service Discharge Test for Appendix R Emergency Lights

06/28/16

2633994

STP-251-3602: Fire Pump Functional Test

2644283

STP-000-3603: Fire Damper Visual Inspection

2644283

STP-000-3603: Fire Damper Visual Inspection

2651144

Post Service Discharge Test for Appendix R Emergency Lights

08/24/17

2660042

STP-251-3601: Fire Protection Sprinkler Header/Nozzle

Inspection

2695875

STP-251-3701: Spray and Sprinkler Open Nozzle Head Air

Flow

2717898

FPW-P2 OFF-LINE MOTOR TESTING WITH GVI - GENERAL

VISUAL INSP.

2732340

STP-251-3602: Fire Pump Functional Test

2739162

STP-281-7609: FPW-P1B Fire Pump Engine 72 Month

Inspection

2740244

STP-251-3501: Tech Spec Related Yard Fire Hydrant Flow

Test

2756896

STP-251-3601: Fire Protection Sprinkler Header/Nozzle

Inspection

2763560

STP-200-0608: REMOTE SHUTDOWN SYSTEM CONTROL

CIRCUIT OPERAB

2767668

STP-200-0607: DIVISION 1 REMOTE SHUTDOWN

CONTROL CIRCUIT OP

2786304

Fire Extinguishers - Perform Annual Inspection

2805279

STP-251-3501: Tech Spec Related Yard Fire Hydrant Flow

Test

2806840

STP-000-3603: Non-Divisional on Line Fire Damper Visual

Inspection

2806840

STP-000-3603: Non-Divisional on Line Fire Damper Visual

Inspection

2827617

FPW-P4 Mitigation Strategy Pump Annual Maintenance

06/28/19

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2844634

Gaitronics Speaker Verification - Control Building & Diesel

Building

08/04/019

2871619

Gaitronics Speaker Verification - Auxiliary Building

08/17/19

2882768

SOP-0054, FWP-P4 Contingency Equipment Quarterly Run

and Inspection

08/27/19

2888427

FPP-0090: Fire-Fighting Equipment Inventory Inspection

2894962

STP-251-3205: Diesel Fire Pump Operational Test

2896369

Fire Extinguishers - Perform Monthly Inspection

2897387

Operations Fire Extinguisher Monthly Inspection

2901393

Operations Fire Extinguisher Monthly Inspection

01