IR 05000458/2019010

From kanterella
Jump to navigation Jump to search
Triennial Fire Protection Inspection Report 05000458/2019010
ML19339H014
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/02/2019
From: Nick Taylor
NRC/RGN-IV/DRS/EB-2
To: Vercelli S
Entergy Operations
References
IR 2019010
Download: ML19339H014 (14)


Text

ber 2, 2019

SUBJECT:

RIVER BEND STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000458/2019010

Dear Mr. Vercelli:

On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station. On November 7, 2019, the NRC inspectors discussed the results of this inspection with Mr. K. Scott, General Plant Manager, Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2019010 Enterprise Identifier: I-2019-010-0001 Licensee: Entergy Operations, Inc.

Facility: River Bend Station Location: St. Francisville, LA Inspection Dates: October 21, 2019, to November 7, 2019 Inspectors: S. Anderson, Health Physicist C. Hobbs, Reactor Inspector J. Mateychick, Senior Reactor Inspector N. Okonkwo, Reactor Inspector Approved By: Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at River Bend Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05T - Fire Protection Fire Protection Inspection Requirements (IP Section 02.02)

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

(1) AB-1/Z-4 Auxiliary Building - West Side Crescent, 141 Level
(2) C-2 Control Building Cable Chase II
(3) C-15 Division I Standby Switchgear Room
(4) C-25 Control Room

B.5.b Inspection Activities (IP Section 02.03) (1 Sample)

(1) OSP-0066, Revision 31, Attachment 20 - Operation of FPW-P4

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. K. Scott, General Plant Manager, Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.05T Calculations G13.18.14.0*171 Determine if Post-Fire Safe Shutdown SSW loads can be 1

satisfied with one SSW pump

Corrective Action Condition Reports 2013-03397, 2016-02953, 2016-03264, 2018-03030, 2018-

Documents (CR-RBS-XXX- 03575, 2019-00830, 2019-02524, 2019-05541, 2019-06023,

YYYYY) 2019-06086, 2019-06097, 2019-06149, 2019-06801, 2019-

06838, 2019-06839, 2019-07049, 2019-07130, 2019-07134,

2019-07135, 2019-07136, 2019-07188

Corrective Action Condition Report 2019-6795, 2019-6796, 2019-6805, 2019-6809, 2019-6838,

Documents (CR-RBS-XXXX- 2019-6839, 2019-6920, 2019-6968, 2019-6989, 2019-7010,

Resulting from YYYYY) 2019-7023, 2019-7134, 2019-7135, 2019-7136, 2019-7140,

Inspection 2019-7143, 2019-7188

Drawings 12210-CBD- Cable Block Diagram, Annunciators 08

10ANN17-01

CE-001A Appendix R Safe Shutdown Analysis Emergency Lighting 6

Control Building EL. 98'-0"

CE-001C Appendix R Safe Shutdown Analysis Emergency Lighting 5

Control Building EL. 136'-0"

CE-001K Appendix R Safe Shutdown Analysis Emergency Lighting 6

Auxiliary Building EL. 141'-0"

EE-001AZ 480 V MCC One Line Diagram, General Notes, Symbols, 12

Location and References

EE-001K 4160V One Line Diagram, Standby Bus ENS-SWG1A 26

EE-001TA 480V One Line Diagram, EHS-MCC2A & 2L, Auxiliary Building 19

EE-001TB 480V One Line Diagram, EHS-MCC2C & 2D, Auxiliary Building 13

EE-001TE 480V One Line Diagram, EHS-MCC2J & K, Auxiliary Building 21

EE-008AQ 4160V Wiring Diagram, Standby Bus ENS-SWG1A 17

EE-008AR 4160V Wiring Diagram, Standby Bus ENS-SWG1A 21

EE-008AS 4160V Wiring Diagram, Standby Bus ENS-SWG1A 10

Inspection Type Designation Description or Title Revision or

Procedure Date

EE-027A Arrangement Main Control Room 17

EE-027C Arrangement Control BLDG, Standard Switchgear Area 9

EE-34ZE Standard Details For Separation Requirement 9

EE-34ZH Standard Details For Separation Requirement 8

EE-34ZJ Standard Details Installation of Barriers For Separation 4

ESK-05CSL01, Elementary Diagram 4.16KV Low Pressure Core Spray Pump 14

Sh. 1

ESK-05ENS01, Elementary Diagram 4.16KV Switchgear Standby Bus 1A 19

Sh. 1 Normal Supply ACB

ESK-05ENS04, Elementary Diagram 4.16KV Switchgear Standby Bus 1A 19

Sh. 1 Alternate Supply ACB

ESK-05ENS06, Elementary Diagram 4.16KV Switchgear Standby Bus 1A GEN 21

Sh. 1 ACB

ESK-05ENS08, Elementary Diagram 4.16KV Switchgear Transformer EJS- 17

Sh. 1 X1A Feeder ACB

ESK-05ENS09, Elementary Diagram 4.16KV SWGR XFMR EJS-X2A FDR 18

Sh. 1 ACB

ESK-05ENS14, Elementary Diagram 4.16KV SWGR STBY NORM. SPLY ACB 9

Sh. 1

ESK-05ENS16, Elementary Diagram 4.16KV SWGR STBY BUS 1A ALTN 9

Sh. 1 SPLY ACB

ESK-05ENS18, Elementary Diagram 4.16KV SWGR STBY XFMR 1EJS-3A 13

Sh. 1 FDR ACB

ESK-05RHS01, Elementary Diagram 4.16KV Residual Heat Removal Pump 19

Sh. 1 E12-PC002A

ESK-05SWP04, Elementary Diagram 4.16KV Switchgear Standby SWP-P2A 31

Sh. 1

ESK-06CSL01, Elementary Diagram 480V Control Circuit Low Pressure Core 8

Sh. 1 Spray MOVS

ESK-06RHS06, 480V Control CKT Residual Heat Removal System 13

Sh. 1

ESK-11SWP05, Elementary Diagram, 125V Cont. CKT, Standby Service water 5

Sh. 1 Aux. Control

Inspection Type Designation Description or Title Revision or

Procedure Date

EW-103K 480V One Line Diagram, NHS-MCC-9L2 & L3, Admin 13

Complex in Services Building

PID-09-100 Engineering P & I D Diagram, System 118, Service Water 37

Normal

PID-09-10E Engineering P & I Digram System 256 Service Water - 24

Standby

PID-23-12B Engineering P & I Diagram System 609 Drains - Floor and 7

Equipment

PID-27-06A Engineering P & I Diagram System 209 reactor core Isolation 45

Cooling

PID-27-07A Engineering P & I Diagram System 204 Residual Heat 38

Removal - LPCI

PID-27-20C Engineering P & I Diagram System 208 LSV*C3A Copressor 3

Skid

Updated Safety Fire Area boundaries Plant Plan View-Elevations 65'-0" to 90'- 13

Analysis Report 0"

Figure 9A.2-2

Updated Safety Fire Area Boundaries Plant Plan View -Elevations 83'-0" to 22

Analysis Report 106'-0"

Figure 9A.2-3

Updated Safety Fire Area Boundaries Plant Plan View-Elevations 109'-0" to 21

Analysis Report 148'-0"

Figure 9A.2-4

Updated Safety Fire Area Boundaries Plant Plan View-Elevations 113'-0" to 13

Analysis Report 186'-0"

Figure 9A.2-5

WD-84-51380-23- Schematic and Wiring Diagram for FVR Starter 0

C97

Engineering EC 64599 Backup FPW Connections 0

Changes EC 71077 Permanent Abandonment of Temperature Control Valves 0

HVK-TV17A and HVK-TV17B Instrument and Controls

EC 75020 240.201A Mark-Up for Addition of Emergency Lights 0

EC 75864 Replacement of Transformer RCS-X1B for Recirc Pump B 0

Motor

Inspection Type Designation Description or Title Revision or

Procedure Date

EC 78833 Install Blind Flange on 066-13-4 Line to Stop Leak 0

EC EE 81170 Engineering Change EC Engineering Temporary Power for 0

SFC-PIB During RF 20

EC-80650 Spared in Place Automatic Beam Smoke Detection systems in 0

FLEX Buildings (North and South)

Fire Plans AB-141-529 Mezzanine Area West Fire Area AB-1/Z-4 4

CB-070-102 Cable Chase II Fire Area C-2 3

CB-098-116 Cable Chase II Fire Area C-2 3

CB-098-118 Standby Switchgear 1A Room Fire Area C-15 3

CB-116-126 Cable Chase II Fire Area C-2 4

CB-136-138 Control Room Fire Area C-25 6

NS-98 Normal Switchgear Building, Elevation 98' 2

Miscellaneous 1EJSCRC204 Circuits Reviewed N/A

1NNSANH309

1NNSANH310

1NNSANH312

1NNSANH306

1NNSANH305

1ENSARH300

1ENBARC619

1ENBARC628

1SWPA2H300

1ENSARH301

1ENSARH304

1ENBARC630

1ENSARC300

1ENSARC301

1ENSARC302

1SYDARC450

1CSLNRC004

1CSLNRC005

1CSLNRK005

1EHSJRL200

1EHSJRL201

Inspection Type Designation Description or Title Revision or

Procedure Date

1EHSCRL202

1EGSARC451

1ENSARC304

1ENSARC307

1ENSARC317

1ENSARC318

1ENSARC319

1ENSARC326

1ENSARC338

1ENSARC450

1ENSARC451

1SYDARC451

1SYDARC452

Design Criterion Post-Fire Safe Shutdown Analysis 6

240.201A

EN-DC-330 Fire Protection Program 5

RBS-FP-17- River Bend Supplementary MSO Analysis for Fire Area 0

00003 Outside of the Main Control Room

RBS-FP-17- River Bend Supplementary MSO Analysis for Appendix R 0

00004 Alternate Shutdown Areas

SEA-95-001 River Bend Station Engineering Report for Individual Plant 0

Examination of External Plants (IPEEE)

SEP-FPP-RBS- River Bend Station Fire Protection Program 6

001

Updated Final Aging Management 26

Safety Analysis

Report Appendix

A

Updated Safety Communication Systems 24

Analysis Report

Section 9.5.2

Updated Safety Fire Protection Program Comparison With Appendix R to 24

Analysis Report 10CFR50

Section 9B

Inspection Type Designation Description or Title Revision or

Procedure Date

Updated Safety Fire Hazards Analysis 26

Analysis Report,

Section 9A

Yokogawa VTD-Y006-0234 0

DX2000 Recorder

Operator Code

Procedures 0SP-0602 Remote Shutdown System Control Circuit Operability Test 7

(Switches 43-1HVCN30, 43-1HVCN31 and 43-1HVKA01)

ADM-0037 Equipment Identification and Labeling 018

AOP-0031 Shutdown from Outside the Main Control Room 335

AOP-0052 Fire Outside the Main Control Room in Areas Containing 29

Safety Related Equipment

CMP-1277 Lugging, Splicing, and Termination of Power, Control and 14

Instrument Cable.

EN-DC-115 Engineering Change Process 27

EN-DC-127 Control of Hot Work and Ignition Sources 20

EN-DC-132 Control of Engineering Documents 8

EN-DC-161 Control of Combustibles 20

EN-DC-179 Preparation of Fire Protection Engineering Evaluations 6

EN-DC-330 Fire Protection Program 5

EN-WM-105 Firefighting Equipment 11/05/2019

NE-DC-128 Fire Protection Impact Reviews 12

NEI 00-01 Guidance For Post Fire Safe Shutdown Circuit Analysis 3

OP-0052 Fire Outside the Main Control Room in Areas Containing 020

Safety Related Equipment

OSP-0066 Extensive Damage Mitigation Procedure 31

OSP-0600 Remote Shutdown System Control Circuit Operability 002

(Switches 43-LSVA08 AND 1A-LSV08)

OSP-0610 Remote Shutdown System Control Circuit Operability Test 0

(Switch 43-1EGAN05)

SEP-FFP-RBS- River Bend Station Fire Fighting Procedure 3

2

SEP-FPP-RBS- River Bend Station Fire Protection Program 6

Inspection Type Designation Description or Title Revision or

Procedure Date

001

SEP-FPP-RBS- River Bend Station Duties of Fire Watch 2

005

SEP-FPP-RBS- Fire Protection System Impairment 004

006

SOP-0027 Remote Shutdown System (#200) 308

SOP-0031 Residual Heat Removal (Sys #204) 342

SOP-0058 Control Building HVAC System (Sys. #402) 27

SOP-0061 Diesel Generator Building Ventilation 16

STP-200-0603 Division III Remote Shutdown System Control Circuit 17

Operability Test

STP-200-0605 Shutdown System Control Circuit Operability Test (Switches 309

S1, S6, S7, S8, S9 & S12)

STP-200-0606 Remote Shutdown System Control Circuit Operability Test 309

(Switches S1, S2, S3, S4, S5, and S11)

STP-200-0607 Division 1 Remote Shutdown System Control Circuit 305

Operability Test (Switch S10)

STP-200-0613 Remote Shutdown System Control Circuit Operability Test 004

(Switches 43-1SWPA45, and 43-SWPA46)

STP-251-3602 Fire Pump Functional Test 016

TPP-7-021 Fire Protection Training and Qualifications 15

Self-Assessments LO-RLO-2018- RBS Fire Protection Focused Self-Assessment 4/18/2019

00010

QA-9-2018-RBS-1 Quality Assurance Audit Report 1

Work Orders 00046684 EJS-SWG2B Global PM Clean and Inspect, RE 28

234145 EHS-MCC2J-1C INSTALL BREAKER FROM EHS-MCC16A- 01

8BT/BB

00446603 STP-251-3700: Fire System Yard Water Suppression Loop 01

Flow

2427157 STP-303-1700: (Div. 2) Table 4 / EHS-MCC2K-4A (E12-F009) 01

2442213 STP-000-3604: Fire Barrier Sealed Penetration Inspection 01

2505675 STP-251-3701: Spray and Sprinkler Open Nozzle Head Air 01

Flow

2528148 STP-251-3700: Fire System Yard Water Suppression Loop 01

Inspection Type Designation Description or Title Revision or

Procedure Date

Flow

2541735 STP-000-3604: Fire Barrier Sealed Penetration Inspection 01

2559801 STP-251-7607: FPW-P1A Fire Pump Engine 72 Month 01

Inspection

2572828 Post Service Discharge Test for Appendix R Emergency Lights 06/28/16

2633994 STP-251-3602: Fire Pump Functional Test 01

2644283 STP-000-3603: Fire Damper Visual Inspection 01

2644283 STP-000-3603: Fire Damper Visual Inspection 01

2651144 Post Service Discharge Test for Appendix R Emergency Lights 08/24/17

2660042 STP-251-3601: Fire Protection Sprinkler Header/Nozzle 01

Inspection

2695875 STP-251-3701: Spray and Sprinkler Open Nozzle Head Air 01

Flow

2717898 FPW-P2 OFF-LINE MOTOR TESTING WITH GVI - GENERAL 01

VISUAL INSP.

2732340 STP-251-3602: Fire Pump Functional Test 01

2739162 STP-281-7609: FPW-P1B Fire Pump Engine 72 Month 01

Inspection

2740244 STP-251-3501: Tech Spec Related Yard Fire Hydrant Flow 01

Test

2756896 STP-251-3601: Fire Protection Sprinkler Header/Nozzle 01

Inspection

2763560 STP-200-0608: REMOTE SHUTDOWN SYSTEM CONTROL 01

CIRCUIT OPERAB

2767668 STP-200-0607: DIVISION 1 REMOTE SHUTDOWN 01

CONTROL CIRCUIT OP

2786304 Fire Extinguishers - Perform Annual Inspection 01

2805279 STP-251-3501: Tech Spec Related Yard Fire Hydrant Flow 01

Test

2806840 STP-000-3603: Non-Divisional on Line Fire Damper Visual 01

Inspection

2806840 STP-000-3603: Non-Divisional on Line Fire Damper Visual 01

Inspection

2827617 FPW-P4 Mitigation Strategy Pump Annual Maintenance 06/28/19

Inspection Type Designation Description or Title Revision or

Procedure Date

2844634 Gaitronics Speaker Verification - Control Building & Diesel 08/04/019

Building

2871619 Gaitronics Speaker Verification - Auxiliary Building 08/17/19

2882768 SOP-0054, FWP-P4 Contingency Equipment Quarterly Run 08/27/19

and Inspection

2888427 FPP-0090: Fire-Fighting Equipment Inventory Inspection 01

2894962 STP-251-3205: Diesel Fire Pump Operational Test 01

2896369 Fire Extinguishers - Perform Monthly Inspection 01

2897387 Operations Fire Extinguisher Monthly Inspection 01

2901393 Operations Fire Extinguisher Monthly Inspection 01

2