IR 05000440/1980025
| ML19341A102 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/09/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML19341A103 | List: |
| References | |
| 810109, NUDOCS 8101220116 | |
| Download: ML19341A102 (1) | |
Text
[f
h
UNITED STATES e
NUCLEAR REGULATORY COMMISSION
$
- E REGION 111
,
?;
[
799 ROOSEVELT ROAD
,
- g'
GLEN ELLYN. ILLINOIS 60137
9 9R1
~;
SJAN
.:
_
W-
.,
-
.-
- _ :
_._
h
-
Docket No. 50-440 l,;
f?
S
Docket No. 50-441 u
The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your letter dated December 19, 1980, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Reports No. 50-440/80-25; No. 50-441/80-23 forwarded by our letter dated November 19, 1980.
We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, e
-
/4 G. Fiorelli, Chief Reactor Construction and Engireering Support Branch cc w/1tr dtd 12/19/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio h
8101220 llh