IR 05000424/1980013
| ML19343A743 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/08/1980 |
| From: | Crowley B, Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19343A740 | List: |
| References | |
| 50-424-80-13, 50-425-80-13, NUDOCS 8011210145 | |
| Download: ML19343A743 (8) | |
Text
r
.
9 eac
~d
'o#
UNITED STATES 8*
- - F ^n NUCLEAR REGULATORY COMMISSION
$,g
.. E -
REGION 11
,
o
[o 101 MARIETT A sY., N.W sulT E 3100
'
o ATLANTA, GEORGIA 30303 e...e
-
Report Nos. 50-424/80-13 and 50-425/80-13 Licensee:
Georgia Power Company
_
270 Pecchtree Street Atlanta, GA 30303 Facility Name: Vogtle Docket Nos. 50-424 and 50-425 License Nos. CPPR-108 and CPPR-109 Inspection at Vogtle site near Wa sboro, GA Inspector:
/d 7 O
.
.
B. R..Cr *le
/
Date' Signed Approved by:
/0 f A. R. Herdt, Section Chief, RCES Branch Date Signed SUMMARY Inspection on September 15-18, 1980 Areas Inspected This routine, unannounced inspection involved 29 inspector-hours onsite in the areas of reactor coolant pressure boundary piping (Units 1 and 2), safety related piping (Units 1 and 2), general construction activities (Units I and 2).
Results No items of noncompliance or deviations were identified.
,
i l
8011210
.
.
-
_.
.
.
.
W DETAILS 1.
Persons Contacted
--
Licensee Employees
-
l K. M. Gillespie, Construction Project Manager I
- H. H. Gregory III, Assistant Construction Project Manager
- C. R. Miles, Jr., QA Field Supervisor
- E. D. Groover, QA Site Supervisor
- W. R. Evans, Project Section Supervisor - Mechanical B. F. Barrett, Senior QA Field Representative M. G. Upchurch, QA Field Representative R. M. Beavers, Engineering Supervisor, Mechanical Piping Other licensee employees contacted included corstruction craftsmen, techni-cians, security force members, and office personnel.
i Other Organizations J. P. Runyan, QA Manager, Pullman Power Products
'
- Attended exit interview
2.
Exit Interview On September 18, 1980, the inspector met with the licensee' representatives noted in paragraph I above and summarized the scope and findings of the inspection of reactor coolant pressure boundary piping, safety related piping, and general construction activities.
>
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items are matters about which more information is required to determine whether they are acceptable or may involve noncompliance or deviations.
New unresolved items identified during this inspection are discussed in paragraph 7.
5.
Independent Inspection Effort
-
The inspector examined the following areas of interest:
A general plant tour was made during which the following was observed a.
by the inspector:-
/
_
.:- -..
-g w
~
m
-
F
.
.
-2-(1) Storage of Unit 1 polar crane structural steel (2) Storage of Chicago Bridge and Iron (CB&I) embeds for Unit 1 containment f
(3) Storage of Bristol Steel structural steel for Unit I containment (4) Storage of small bore pipe (5) Storage of piping assemblies in the warehouse piping laydown yard (6) Storage of Units 1 and 2 reactor vessels (7) Storage of Unit I reactor coolant pump casings (8) General Construction and housekeeping activities at Units 1 and 2 reactor building and auxiliary building sites b.
The inspector observed cleanup prior to pour and various activities uch as slump testing, air content testing and concrete placement during pour of the Unit I reactor building base mat.
c.
The inspector observed reinforcement bar cadwelding in the Unit 2 turbine building. Cadweld number 18HZE90 was observed in process and compared with the requirement.= of construction specification X2AP01, Section C3.5, Revision 3, " Mechanical Splicing of Reinforcing Bars".
Within the areas inspected no items of noncompliance or deviations were identified.
6.
Reactor Coolant Loop and Other Safety-Related Piping - Welding Procedure Specific. tions and Quality Assurance Procedures (Units I and 2)
Reactor coolant and other safety-related piping are being welded by Pullman Power Products (PPP). The inspector reviewed PPP and interfacing licensee welding procedure specifications (WPS) and quality assurance procedures used for field welding of pipe to determine whether specifications and procedures have been established, qualified and controlled in accordance with NRC requirements, SAR commitments, licensee's QA program, and ASME code requirements, as applicable. The applicable code for this welding is the ASME Boiler and Pressure Vessel Code,Section III, 1977 Edition with Addenda through the winter of 1977. The following areas were reviewed:
The QA manual and referenced documents, a.
identified below, were as reviewed to determine whether adequate QA plans and procedures, inclu-j
'
ding QC procedures have been established (written, reviewed, approved and issued) to assure acco ;.iishment and control of the following activities:
.
(1) Organizational structure including qualifications, training and stop work authority
,
.
.
-3-
.
(2) Audits including procedures, checklists, scope, freque ;cy and qualification of auditors (3)
General quality requirements relative to material sp test reports, procurement documents, deviations ecifications, components, structures, and systems and control of
-
,
(4)
Work and inspection procedures including provisions
"
approval, and control F.,r review, (5)
Control of material including traceability storage, and identification of nonconforming material, handling, shipping (6)
Procedures for Control of processes including special pro cesses (7)
Procedures for corrective action (8) Document control including review for adequacy of document controlcontrol of QA manual and periodic (9)
Test control and control of test equipment l10) Quality records The following documents 5 ere reviewed:
Plant Design Piping and
.
(8/4/80)
Instrumentation Specification X4AZ01 Division 1, revision 2, " General Requirements" Division 3, revision 2, "ASME Section III Piping Field F b i and Installation" a r cation Assurance Program Manual ASME III, Div.PPP Mecha
.
uality e
1" (11/16/79)
PPP Procedure XV-4, " Holo Tag Usage (12-5-79)
.
Administrative of Training, Examination Qualificat
.
n rol and fication" (1/28/80)
and Certi-Personnel Control, and Administrative of Training
.
xamination Qualification and Certification'.' (1/18/80), Examination, PPP Procedure 'II-3, " Level III Nondestructive Personnel C
.
and Administration of Examination Qualification and Ca ontrol (1/17/80)
on"
.
Up O
M ag.. _
,
e
E C
.
-4-A PPP Procedure II-4, " Inspection and Testing Personnel - Control
.
and Administration of Training, Examination, Qualification and Certification" (1/24/80)
PPP Procedure II-10, " Maintaining Proficiency of Level III Per;onnel"
.
(5/23/79)
.
PPP frocedure XVIII-1, " Internal Auditing Procedures of Field QA
.
Programs by the Quality Engineering Group" (3/1/79)
PPP Procedure VII-2, " Material Coi. trol" (8/10/79)
.
PPP Procedure VIII-1, " Identification of Materials, Parts and
.
Components" (6/7/78)
PPP Procedure IX-3, " Fabrication and Installation Specifications
.
for Nuclear Power Plant components, Piring Systems and Appurten-ances ASME-Section III" (6/15/78)
PPP Procedure VI-1, " Document Control" (10/2/79)
.
PPP Procedure VIII-3, " Control of Welding Materials (Field)"
.
(3/8/79)
PPP Procedure XIII-9, " Field Handling of Materials and Equipment"
.
(4/10/80)
PPP Procedure V.III-5, " Field Storage Procedure" (6/2/78)
.
PPP Procedure XV-2, " Procedure for Handling Nonconformances
.
(Field) (5/29/79)
PPP l-rocedure XI-I, " Field Leak Testing Hydrostatic and Pneumatic"
.
(11/1/79)
PPP Procedure XI-2, " Vacuum Box Testing" (4/5/80)
.
PPP Procedure XII-2, " Procedure for the calibration of tools,
.
Measurement and Testing Equipment" (11/30/79)
PPP Procedure XVII-1, " Field Quality Assurance Records Procedure"
.
.(6/21/79)
GP Procedure GD-T-01, revision 5, "Nonconformance Control"
.
GP Procedure QA-05-07, revision 4, " Audit Report Writing"
.
.
.
GP Procedure QA -05-14, revision 1, " Field Audit"
.
!
GP Procedure QA-03-02, revision 6, " Training and Personnel Quali-
,
.
!
fication"
[
l i
~ -.. -.
....-, - --..
r
=
,-
.
-5-
<
...
I GP Procedure ffD-A-03, revision l', " Field Procurement Process"
.-
GP Procedure GD-T-07, revision 2, " Work Stoppage"
.
GP Procedure QA-5-16, revision 0, "Stop Work Orders"
.
i -
Pechtel Bill of ifaterials X4AQ37, " Bill of Material for Welding
~ ~ ~
.
,
'
Filler Materials for Nuclear Services" During review of the above procedures, the following two problems were encountered:
During review of nonconformance procedures, the inspector noted
.
i that the PPP procedure, XV-2, specifies that minor nonconformances are not to be reviewed by Georgia Power. Discussions with the
,
licensc.e revealed that in fact all nonconformances are being
reviewed by Georgia Power. In addition, review of Georgia Power QA-audit GD 05-80-26 revealed that numerous problems have been-found by the licensee relative to r.onconformance reporting.
Based on the audit results, the Georgia Power nonconformance
,
procedure GD-T-01, was -in the process of.being revised at the time of the inspection. After revision to procedure GD-T-01,re.ision to tl
PPP procedure, XV-2 is planned. This area will be examined further after completion of the procedure revisions and is identified as inspc.ctor followup item 424/425/80-: 3-01, " Review cf Penconformance Reporting Procedures".
In PPP procedure II-3, which covers qualification and certifica-w
.
tion of Level III personnel, paragraph 5.0, paragraph 7.0, para-graph 8.0 and Appendix A confuse the terms " Proficiency Examination" and " Physical Examination" (eje examination). PPP agreed to revise
-
the procedure to clarify these terms. This procedure will be reviewed on a future inspection and is ider.tified as inspector followup item 424/425/80-13-03, " Clarification of Certification Procedure for NDE Level III Personnel",
b.
The inspector reviewed preparation, qualification, approval / certification, distribution and revision requirements for WPS's as covered by:
(1) Sections I and IX of the PPP Field QA Manual (2) PPP QEG procedure, " Welding Procedure Qualification" (3/27/80)
.
c.
The PPP general welding standard and WPS's listed below were reviewed for: compliance with documents of paragraph 6.b. above; qualification in accordance with ASME Section IX; procedure qualification records containing essential. variables and.
mechanical test results in accordance with ASME Section IX; and compliance with PSAR and regu-latory guide commitments.
I (1) General Welding Standard GWS-III/I (9/12/79)
,
te-e s s eaw w w e,e n --
-e-es
, - '
av~-w--
- - >
.ve-9-*
,
-w,
-~->,-e--w---wa
-n e -e n-
r
.
-6-
.
(2) L 24-III/I-8-KI-12 (1/19/79)
(3) kTS 27-III/I-8-KI-12 (9/20/79)
(4) kTS 29-III/I-8-0B-1 (9/20/79 (5) WPS 38-III/I-8-KI-1 (1/7/80)
-
During review of the above procedures, the following two problems were encountered:
'In General Welding Standard GWS-iia /I the following areas need
.
clarification:
The procedure does not clearly address the methods for inter-pass cleaning.
For GTA welding, the procedure is not clear in defining purge gas flow rate during welding after satisfactory purge has been established.
Figure 9.5B, which gives the minimum size for socket weld flange welds specifies a minimum leg size of 1.4 t or 1/4" whichever is smaller. The 1/4" appears to be in error.
PPP agreed to clarify the above requirements. This is identified inspector followup item 424/425/80.3-02, " Clarification of as General Welding Standard".
kTS 38-III/I-8-KI-1 specifies a qualified thickness range of
.
1/16"-1.120".
The applicable procedure qualification records indicate that the procedure is only qualified up to.560" in thickness. PPP personnel stated that the procedure is in error but has not been used on any pipe greater than.180" in thickness.
The procedure will be revised. This will be identified as inspector followup item 424/425/80-13-04, " Incorrect Thickness Range on WPS".
Within the areas inspected, no items of noncompliance or deviations were identified.
7.
Other Safety-Related Piping - Visual Examination of Welds (Units 1 and 2)
.The inspector reviewed quality records for completed piping field welds listed below to determine whether applicable code and procedure requirements were being met.
See paragraph 6 above for the applicable code. Records covering visual and dimensional inspection, weld quality, and weld history were reviewed for the following welds:
.
.,
+,
'-
-
l
.,..
--
. _ - - -
- -,
--
- - - - - - -
- - -
-.--_;7---.----.
-
_
_, _.
_
r MJ s
M
. <.
i o.
-7-yeid No.
ISO No.
Weld Tize Unit t
084-W-01 IX4DK3121402-12R3 4"
156-W-01 IX4DK3121803-4R3 3"
101-W-05 IX4DK3121803-14R1 4"
130-W-05 IX4DK3121803-13R2 4"
'
157-W-02 IX4DK3121803-1R3 3"
'089-W-01 2X4DK3121506-6R1 4"
101-W-01 2X4DK3121803-5R2 4"
025-W-02 2X4DK3121803-4R2 4"
During review of the above records, the inspector noted that for welt 025-W-02, the weld process sheet did not list procedure and drawing revision numbers as required by paragraph 6.2.2 of PPP procedure VI-5, " Control of Process Sheets and Weld Rod Stores Requisitions". This appeared to be an isolated case and the licensee agreed to investigate and determine the extent of this problem.
This matter is considered unresolved pending determination of whether this is an isolated case. This is identified as item 425/80-13-05, " Failure to Enter Procedure and Drawing Revision Numbers en Weld Process Sheet".
Within the areas inspected, no items of noncompliance or deviation were identified.
.
O-i u
-
-
-
,o
.,--
.
,.
,,
,,
,, - -.,
.