IE Insp Repts 50-424/80-03 & 50-425/80-03 on 800205-08.No Noncompliance Noted.Major Areas Inspected:Structural Concrete,Structural Backfill & Previously Identified Items
ML19309A509
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/21/1980
From: Carlon J, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19309A495 List:
References
50-424-80-03, 50-424-80-3, 50-425-80-03, 50-425-80-3, NUDOCS 8003310376
Download: ML19309A509 (3)


Text

{{#Wiki_filter:7- ._ , . . / UNITED STATES d i NUCLEAR REGULATORY COMMISSION

c REGION 11

, o, [ 101 MARIETTA ST., N.W., SUITE 3100 % g* ATLANTA, G EORGIA 30303 Report Nos. 50-424/80-03 and 50-425/80-03 Licensee: Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name: Vogtle Units 1 and 2 Docket Nos. 50-424 and 50-425 License Nos. CPPR-108 and CPPR-109 . Inspection at Vogtle Site near Waynesboro, Georgia Inspector: d[[ .2 ' 2 / - M O 4,W J.R.[irYIi Date Signed Approved b a M __ A - # / - [O T. E. Conlon, Section Chief, RC&ES Branch Date Signed SUMMARY Inspection on February 5-8, 1980 Areas Inspected This routine unannounced inspection involved 26 inspector-hours on site in the areas of structural concrete, structural backfill and previously identified items.

Results Of the 3 areas inspected, no items of noncompliance or deviations were identified.

, . scosau 374

_ _ _ _ e . . . ,- DETAILS 1.

Persons Contacted Licensee Employees

  • K. M. Gillespie, Construction Manager
  • R. R. Allen, Manager of Quality Control
  • B. C. Harbin, Civil Project Section Supervisor
  • R. W. McManus, Civil QC Supervisor A. N. Lankford, Civil QC Inspection Supervisor
  • E. D. Groover, QA Site Supervisor M. Googe, Civil QC Inspector

'

  • B. Johnston, Manager Nuclear Construction
  • D. M. Fiquett, Manager Field Operations
  • H. H. Gregory, Assistant Construction Manager Other licensee employees contacted included I construction craftsmen, and 4 technicians.

Other Organizations

  • J. E. Mah1meister, Resident Engineer, Bechtel
  • D. Armstrong, Civil Resident Engineer, Bechtel T. Claunch, Geotehnical Engineer, Bechtel
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on February 8, 1980, with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings (Closed) Infraction (424/425/79-08-01): Failure to document backfill test data. Examination of quality records and instructions indicate that test data are being documented in accordance with licensee requirements. This item is closed.

(Closed) Info,ction (424-425/79-11-01): Backfill moisture control. Field methods used to control the moisture content allowed a variation frem the plus or minus two percent of optimum that is specified by specification ,

X2AB01. The inspector examined the licensees responses dated July 31, and , August 7, 1979 and implementation of the corrective action stated in the l response. This item is closed.

l 4.

Unresolved Items ! Unresolved items were not identified during this inspection.

-

. .. . . . -2-5.

Independent Inspection The inspector examined the following areas: a.

Construction status b.

Concrete and soils testing laboratory c.

Concrete batch plant d.

Surface drainage controls Repair work on concrete voids in the auxiliary building e.

No deviations or items of noncompliance were identified.

6.

Licensee Identified Item 10 CFR 50.55(e) (Open) Item 424/79-18-01 and 425/79-18-01; Erosion of Category I Backfill.

The licensee reported a potential CDR regarding erosion of Category I Back-fill on November 14,1979, (see RII:IE inspection report number 424-425/79-17).

Region II:IE issued a confirmation of action letter dated November 15, 1979, James P. O'Reilly, IE Region II to J. H. Miller, in which it was understood that the licensee will not continue with backfill placement in or around the powerblock area or concrete placement on affected structures without the concurrence of NRC.

Based on information presented in Georgia Power letters, D. Dutton to J. P. O'Reilly dated January 8 and 10,1980, RII:IE concurred with the licen-sees request to resume work on backfill and concrete operations on specified areas in NRC letters J. P. O'Reilly to J. H. Miller dated January 14, 22 and February 8,1980.

The inspector examined work, procedures and records for ongoing backfill repair, dewatering operations, and a proposed scheme for additions to the existing dewatering system.

No deviations or items of noncompliance were identified.

i l - I . .. - - .. - . }}