IR 05000424/1980009

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-424/80-09 & 50-425/80-09 on 800522 & 23.No Noncompliance Noted.Major Area Inspected:Licensee Identified Item Re Erosion of Category I Backfill
ML19330A785
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/13/1980
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19330A783 List:
References
50-424-80-09, 50-424-80-9, 50-425-80-09, 50-425-80-9, NUDOCS 8007290414
Download: ML19330A785 (2)


Text

.f-3 v

p at:

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION n

d

$

E REGION 11

[

101 MARIETTA ST N.W., SUITE 3100 o

%

b o

ATLANTA, GEORGIA 30303 Report Nos. 50-424/80-09 and 50-425/80-09 Licensee:

Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name: Vogtle Docket Nos. 50-424 and 50-425 License Nos. CPPR-108 and CPPR-109 Inspection at Vogtle Nuclear Plant near Waynesboro, Georgia Inspector:

kb J /.

'

,.

J R. Harris

,

,

Date Signed Approved b'yP M?r / 4 1'

( '/ :

r

.. -

T. E. Conlon, Section Chief, RCES Branch Date Signed SUMMARY Inspection on May 22-23, 1980 Areas Inspected This special, announced inspection involved 12 inspector-hours on site in the acea of a licensee identified item (10 CFR 50.55(e)).

Results Of the one area inspected, no items of noncompliance or deviations were identified.

8007290hk

..

_ _ _ - - -. _ - - _ _ _

<

'M DETAILS 1.

Persons Contacted Licensee Employees

  • E. D. Groover, Site QA Manag r H. H. Gregory, III, Assistant Project Manager
  • B. Harbin, Supervisor, Project Engineering
  • R. W. McManus, Civil QC Supervisor A. N. Lankford, Civil QC Inspector
  • J. Bailey, Licensing Manager, Southern Company Other Organizations
  • V. Srinivason, Geotechnical Engineering Supervisor, Bechtel
  • F. R. McCarty, Project Manager, Walsh Construction Company
  • D. P. Armstrong, Resident Engineer, Civil, Bechtel Z. Yazdani, Geotechnical Engineer, Bechtel
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on May 23, 1980 with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Licensee Identified Item (10 CFR 50.55(e))

(0 pen) Item (424-425/79-18-01): Erosion of Category I Backfill.

The inspector performed. a special announced inspection to witness partial removal of the Unit 2 tendon gallery mudslab and testing of the structural backfill beneath the mudslab. The inspector witnessed sand cone density tests, proving ring penetrometer testing and examined results of dynamic cone penetration tests on structural backfill beneath the mudslab. Testing was done in accordance with licensee commitments. Results of testing and analysis of effects of erosion on structural backfill and foundations of category I structures will be submitted in a report to the NRC by the licen-This item remains open pending NRC's review of the licensee's report.

see.

_

.

No deviations or items of noncompliance were disclosed.