Forwards IE Insp Repts 50-424/80-13 & 50-425/80-13 on 800915-18.No Noncompliance Noted
ML19343A739
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/08/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19343A740 List:
References
NUDOCS 8011210139
Download: ML19343A739 (2)


See also: IR 05000424/1980013

Text

.

p tstoq

[l0

~

+

/

h

UNITED STATES

'*

$*38" h(f)I'3

NUCLEAR REGULATORY COMMISSION

q

n

E

REGION 11

$

'

2

ed

  • '

f

101 MARIETT A ST., N.W., SUITE 3100

n

,

i-

ig

/

ATLANT A, GEORGIA 30303

Q

4....

__

<a

os

a>

.

3

In Reply Refer To:

OCT 0 81980

- y

,"

,

rip BRC

y

7

NJ

A0-424/80-13

73

'

~

U O-425/80-13 ' )

M

2

u

-.

u>

_

Gebrgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by B. R. Crowley of this office on

September 15-18, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our

findings held with H. H. Gregory, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in th'e

enclosed report. This item will be examined during subseq'ient inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Rc

If this

report contains any information that you (or your contractor) be.

'e to be

- proprietary, it is necessary that you make a written application withu. :'O days

to this office to withhold such information from public disclosure. Ar.y such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chi

Reactor Construction and Engineering

Support Branch

Enclosure: (See Page 2)

l

8011210

g

r

-

a

OCT 0 8 u8a

Georgia Power Company

-2-

.

a

Enclosure:

Inspecti,a Report Nos. 50-424/80-13

and 50-425/80-13

cc w/ encl:

K.-M.

Gillespie, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. E. Dutton, Project General Manager

l

1

l