Text
_ _..
_
_
_ _
.
h UNITED STATES
g NUCLEAR REGULATORY COMMISSION o
g g
a REGION 11 l
o,
101 MARIETTA ST., N.W., SUITE 3100
&
ATLANTA, GEORGIA 303o3
,
MAR 241990
!
'
Report Nos. 40-424/80-04.and 50-425/80-04 Licensee:
Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name: Vogtle Plant
Docket Nos. 50-424 and 50-425 License Nos. CPPR-108 and CPPR-109 Inspection at Vogtle Site near Wayneboro, Georgia Inspect
- ?>
b 8M8d J. R. Harris
"
Date Signed Approved by.
.8d [
O T. E. Conlon, Section Chief, RCES Branch Date Signed SUMMARY Inspection on March 11, 1980 Areas Inspected This special, unannounced inspection involved 3 inspector-hours onsite in the areas of a licensee identified item and site preparation.
Results
!
Of the two areas inspected, no items of noncompliance or deviations were identified.
i o
.
\\
,8
.
~
l
.
I
-
s t
s 8004240 3 h
._
.
-____
l.,'
- -
i i
j l
'
.
DETAILS 1.
Persons Contacted Licensee Employees
- H. H. Gregory, Assistant Project Manager
- E. D. Groover, QA Site Supervisor
- B. C. Harbin, Civil Project Supervisor
- D. M. Fiquett, Manager Field Operations
- B. Johnston, Manager General Plant Construction, Nuclear
- C. W. McManus, Civil QC Section Supervisor Other Organizations
- J. E. Mahlreister, Senior Resident Engineer, Bechtel
- D. P. Armstrong, Civil Resident Engineer, Bechtel
- Attended exit interview 2.
Exit Interview i
The inspection scope and findings were summarized on March 11, 1980 with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings
!
Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection The inspector examined surface drainage and subsurface drainage controls
'
and slope stabilization measures.
,
-
.g No deviations or items of noncompliance were identfied.
'
'
6.
Licensee Identified Item 10 CFR 50.55(e)
(0 pen) Item 425/80-08-01: Undermining of the Control Building Electric Tunnel Number 2 Foundation. The inspector examined results of the under-
.
mining which was reported to RII:IE on March 10, 1980 as a CDR reportable
'
,
under 10 CFR 50.55(e). Undermining occurred as a result of a March 8 storm. The licensee documented the undermining in nonconformance report number CD-780 and issued stop work notice number SW-Cd16.
Surveys show a
,
61 foot long gulley cut to a maximum depth of 4 feet into the backfill
-
l
- .
-
-.
---
T
. -
,
-2-t
~.
along the west wall of the Control building. The gulley undercuts 40 feet of the mudslab with 20 feet of the undercut extending up to 3.5 feet under the building foundation. Maximum vertical height of undercut bene'ath the
.
building is 3.5 feet.
!
The licensee has secured the area to prevent further erosion damage and is preparing a damage evaluation and recommended method of repair, which will be reviewed by NRC prior to commencement of repairs.
t No deviations or items of noncompliance were identified.
!
l i
l
,
t
,
e
,
.O t
i
.
,
b
!
>
.
g
.
.
.
F
>
t
.