ML19309E773

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/80-04 & 50-425/80-04 on 800311.No Noncompliance Noted
ML19309E773
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/24/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19309E769 List:
References
NUDOCS 8004240352
Download: ML19309E773 (2)


See also: IR 05000424/1980004

Text

.

. _

___

.

-

'

a

<*

$*^

UNITED STATES

Q l'

NUCLEAR REGULATORY COMMISSION

n

5

E

REGION 11

4

o,

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAR 2 41980

In Reply Refer To:

RII:JRH

50-424/80-4

50-425/80-4

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by J. R.

Harris of this office on

March 11, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-108

and CPPR-109 for the Vogtle facility, and to the discussion of our findings held

with H. H. Gregory, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Documect Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

-

1

Sincerely,

l

.

l

i

'

s ,

C. E. Murphy, Ch'

.

Reactor Construction and Engin_eering

Support Branch

'

Enclosure:

See Page 2

8004240 N b

- _ _ _ .

_ . - . . - _ .

_.

> s,'

>

MAR 2 41980

'

Georgia Power Company

-2-

.

.,

Enclosure:

Inspection Report Nos. 50-424/80-4

and 50-425/80-4

cc w/ encl:

K. M. Gillespie,

Construction Project Manager

P. O. Box 282

Waynesboro, GA 30830

E. D. Groover

QA Site Supervisor

P. O. Box 282

Waynesboro, GA 30830

D. E. Dutton

Project General Manager

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

,

.

t

w

.

9

L

.

O

.

~

4

-

'

.

.

a

-