ML19309A499

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/80-03 & 50-425/80-03 on 800205-08.No Noncompliance Noted
ML19309A499
Person / Time
Site: Vogtle  
Issue date: 02/22/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19309A495 List:
References
NUDOCS 8003310369
Download: ML19309A499 (2)


See also: IR 05000424/1980003

Text

_ - .

_

,

e

,

t

]

/

t

UNITED STATES

, b' 8 '

NUCLEAR REGUL ATORY COMMISSION

$

i

e c

REGION 11

%*****/[

'

o,

101 MARIETTA ST

N.W.. SUITE 3100

ATLANTA, GEORGIA 30303

FEB 2 21980

In Reply Refer To:

RII:JRif

50-424/80-3

50-425/80-3

Georgia Power Company

ATTN:

J. II. Miller, Jr.

Executive Vice Preaident

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

.

This refers to the inspection conducted by J. R. Harris of this office on

February 5-8, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our

findings held with K. M. Gillespie at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you for your contractor) believe to be

proprietary, it is necessary that you mak; a written application within 20 days

to this office to withhold such informatun from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

l

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

I

t

l

B00331 0

^*

'6

..

FEB 2 21980

o'

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

J.

.B

ant, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-424/80-3

and 50-425/80-3

cc w/ encl:

K. M. Gillespie,

Construction Project Manager

P. O. Box 282

Waynesboro, GA 30830

E. D. Groover

QA Site Supervisor

P. O. Box 282

Waynesboro, GA 30830

D. E. Dutton

!

Project General Manager

Georgia Power Companv

Post Office Box 4545

Atlanta, CA 30303

i

l

l

l

!

l

l

.

9