IR 05000413/1987012

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-413/87-12 & 50-414/87-12 on 870413-17 (Ref 10CFR2.790 (D) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Security Plan & Implementing Procedures
ML20209J580
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/28/1987
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20209J527 List:
References
50-413-87-12, 50-414-87-12, NUDOCS 8705040315
Download: ML20209J580 (1)


Text

!

..

'

e ?820 UNITED STATES m

.

9'o NUCLEAR REGULATORY COMMISSION

/

[\\

REGION 11 n

3*

,, j 101 MARIETTA STREET,N.W.

  • -

'c ATL ANTA. GEORGI A 30323

'N...*'

APR 281987 Report Nos.:

50-413/87-12and50-41I/87-12 Licensee:

Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-413 and 50-414 License Nos.:

NPF-35 and NPF-52 Facility Name:

Catawba 1 ar.d 2 Inspection Conducted:

April 13-17, 1987 Inspector-N$h 4/D7fHl

{A.Till n, P ysical Security Inspector

'Date Signed Approved by:

AG^M M

)

-(p.JL R. McGuire, Chief, @ysical Security Section Date Signed Nuclear Materials Safet) and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine, unannounced physical security inspection included a review and examination of:

Physical Security Plan and Implementing Procedures; Security Program Audit; Records and Reports; Testing and Maintenance; Security System Power Supply; Compensatory Measures; Access Control - Vehicles; Detection Aids - Protected Area; Alarm Stations; Personnel Training and Qualification -

General Requirements; and Safeguards Contingency Plan Implementation Review.

Results:

The licensee was found to be in compliance with regulatory requirements within the eleven areas inspected.

8705040315 870428 ADOCK0500g3 PDR Q

55$E5s

~somlEsE8 m n ::.mm.o,,my

_

n..g;,