Forwards SALP Rept 50-410/85-99 for Oct 1983 - Jan 1985.List of Attendees of 850424 Meeting Re SALP Also Encl.Overall Assessment of Const Activities Indicates That Initiatives Have Improved Performance
ML17054B708
Person / Time
Site: Nine Mile Point 
Issue date: 06/14/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17054B709 List:
References
NUDOCS 8506200052
Download: ML17054B708 (6)


Text

JUN14

)gag Docket No.

50-410 Niagara Mohawk Power Corporation ATTN:

Mr. B.

G. Hooten Executive Director Nuclear Operations c/o Miss Catherine R. Seibert 300 Erie Boulevard, West Syracuse, New York 13202 Gentlemen:

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No.

50-410/85-99 This refers to the SALP for the Nine Mile Point Unit 2 project, conducted by this office on March 28, 1985 and discussed with you and your staff at a

meeting on April 24, 1985.

The list of meeting attendees is attached as Enclosure 1.

The NRC Region I SALP Report is provided as Enclosure 2 and covers the period October 1,

1983 to January 31, 1985.

Your response dated May 14, 1985, submitted in reply to our letter of April 17, 1985 provided comments on the SALP Report.

These letters are provided as Enclosures 3 and 4.

Our overall assessment of construction activities at the Nine Mile Point Unit 2 project is that your initiatives have improved performance.

We are encouraged by the present management support of guality Assurance and organizational improvements which enhance management controls. Active corporate management involvement has resulted in high levels of performance in the areas of safety related components and support systems and improvements in the areas of piping systems and supports, project management/quality assurance and nondestructive examination.

Some performance shortcomings were observed, however, in the electrical equipment and cables, and engineering areas.

Also, management attention to improving the performance rating in the licensing activities area is warranted to support the anticipated work load necessary to support the facility licensing process.

In the meeting of April 24, 1984, we discussed your regulatory performance and received your comments on the SALP program and our assessment.

We have consi-dered your letter of May 14, 1985 and made no changes in the SALP report.

We note Attachment 1 to your letter which addresses the report Recommendations to the Licensee and will assess the adequacy and implementation of your ongoing actions, which you seem to indicate currently address most of the recommen-dations, during our future inspections.

We consider that our meeting and subsequent interchange of information were beneficial and improved mutual understanding of your activities and our regula-tory program.

B506200052 850hi4 PDR 'DOCK 05D004iO

(

OFFICIAL RECORD COPY LINVILLE4/2/85 - 0001.0.0 04/02/85

~

~

~

ll,

)

l'lf>

NiagaraMohawk Power Corporation JUN 14 1985 In accordance with 10 CFR 2.790(a),

a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

No reply to this letter is required.

Your cooperation with us is appreciated.

Sincerely, Original signed by Thomas E. Murley Thomas E. Murley

'Regi onal Administr ator cc w/encl:

Connor

& Wetterhahn John W. Keib, Esquire D.

Quamme, NMP-2 Project Director C.

Beckham, NMPC QA Manager Department of Public Service, State of New York Public Document Room (PDR)

Local Public Document Room ( LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Zech Commissioner Bernthal bcc w/encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

DRP Section Chief PAO T. Murley D. Holody J.

lor, IE R

RP DR DR L'nvilly/jm Col

'

Star c

5 pi $ ~

A.g

~RA

.~gg A>

t OFFICIAL RECO D COPY

'INVILLE4/2/ 5 - 0002.0.0 04/02/85 Enclosures:

1.

SALP ManagementMeeting Attendees 2.

SALP Report 50-41,0/85-99 3.

NRC Region I Letter, T. Murley to B. G.Hooten, April 17, 1985 4.

NMPC Letter, W. J.

Donlon to T. Murley, May 14, 1985

t

~

~

1'

l yP l',gape

',"

f p)fgreg<)

Q'

lk "<<fj

~ ~

~."> +'3'jk l

'

f f'P

~

V il I

ENCLOSURE

U. S.

NUCLEAR REGULATORY COMMISSION SALP MANAGEMENT MEETING ATTENDEES Licensee:

Niagara Mohawk Power Corporation 300 Erie Boulevard, West Syracuse, New York 13202 Facility:

Nine Mile Point Unit 2 Meeting Conducted:

April 24, 1985 Meeting at:

'Region I, King of Prussia, Pennsylvania NRC Attendees:

T.

R.

S.

J.

R.

J.

S.

A.

Murley, Regional Admi ni strator Starostecki, Director, Division of Reactor Projects Collins, Chief, Projects Branch No. 2, DRP Linville, Chief, Reactor Projects Section 2C, DRP Gramm, Senior Resident Inspector, NMP-Unit 2 Durr, Chief, Engineering Programs Branch, DRS Ebneter, Director, Division of Reactor Safety, DRS Schwencer, Chief, Licensing Branch 2, Division of Licensing, NRR Licensee Attendees:

W. J.

B.

G.

C.

G.

T.

E.

A.

F.

C.

L.

C.

V.

T.

W.

R.

G.

D.

R.

Donlon, President Hooten, Executive Director, Nuclear Operations Beckham, equality Assurance Manager - Projects Lempges, Vice President, Nuclear Generation Zallnick, Manager, Nine Mile Point Unit 2 Licensing Stuart, Assistant to Executive Director, Nuclear Operations Mangan, Vice President, Nuclear Engineering 8 Licensing Roman, Station Superintendent, Nine Mile Point, Unit 1 Matlock, Deputy Project Director, Nine Mile Point Unit 2 Palmer, Manager QA, Nuclear Other:

B. Charlson, Project Director, Stone and Webster

?