Qe JULSBB Docket No.
50-410 Niagara Mohawk Power Corporation ATTN:
Mr. C. V. Mangan Senior Vice President 300 Erie Boulevard, West Syracuse, New York 13202 Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) Report No.
50-410/85-98 This refers to the SALP for the Nine Mile Point Unit 2 project, conducted by this office on March 17, 1986 and discussed with you and your staff at a
meeting on May 30, 1986.
The list of meeting attendees is attached as Enclosure 1.
The NRC Region I final SALP Report is provided as Enclosure
and covers the period February 1,
1985 to January 31, 1986.
Your response dated June 30, 1986, submitted in reply to our letter of May 14, 1986 provided comments on the SALP Report.
These letters are provided as Enclosures 3 and 4.
Our overall assessment indicates that construction activities have been per-formed in an acceptable manner.
Based on our evaluation, we believe that corporate management involvement and controls have been a key factor in this performance.
As the project moves through the preoperational testing phase, and toward an operational organization, continued management attention at both corporate and site levels will be required.
We expect to maintain a high level of NRC inspection activity at Nine Mile Point Unit 2 in the coming months.
In the meeting of'ay 30, 1986 we discussed your regulatory performance and received your comments on the SALP program and our assessment.
We have consi-dered your comments at the meeting and in your letter of June 30, 1986, and made one change in the SALP report.
The change, involving clarification of the Nine Mile Point site INPO accreditation status, is indicated by a vertical line in the margin on page 9 of Enclosure 2.
We note Attachment 1 to your letter which addresses the report Recommendations to the Licensee and will assess the adequacy and implementation of your ongoing actions, which you indicate currently address most of the recommendations, during our future inspections.
We consider that our meeting and subsequent interchange of information were beneficial and improved mutual understanding of your activities and our regulatory program.
8608040ii9 860728 PDR ADOCK 050004i0
PDR.
OFFICIAL RECORD COPY SALP-LINVILLE-.NMP2 0001.0. 0 07/16/86 1/(
N
Niagara Mohawk Power Corporation 28 JUL 1986 In accordance with 10-CFR 2.790(a),
a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
No reply to this letter is required.
Your cooperation is appreciated.
Sincerely, Or%'g1alsf@net by 'Thomas E, Murley Thomas E. Murley Regional Administrator Enclosures:
~ SALP Management Meeting Attendees 2.
SALP Report 50-410/85-98 3.
NRC Region I Letter, T. Murley to B.
G. Hooten, May 14, 1986 4.
NMPC Letter, C.
V. Mangan to T. Murley, June 30, 1986 cc w/encl: Connor 5 Wetterhahn John W. Keib, Esquire J.
A. Perry, Vice President, Quality Assurance W. Hansen, Manager of Quality Assurance D.
Quamme, NMP-2 Project Director C.
Beckham, NMPC QA Manager T. J.
Perkins, General Superintendent R.
B. Abbott, Station Superintendent Department of Public Service, State of New York Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector State of New York Chairman Zech Commissione} Roberts Commissioner Asselstine Commissioner Bernthal OFFICIAL RECORD COPY SALP-LINVILLE-NMP2- 0002.0.0 07/16/86
)(
Niagara Mohawk Power Corporation Pg JUL 1986 bcc w/encl Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o encl) DRP Section Chief.
Region I SLO J ~ Taylor, IE T. Murley, RI J ~ Allen, RI K. Abraham, PAO (2 copies) Management Meeting Attendees .DRP Linville/rhl 7/~X/86 R: P RI D C i Starostecki 7~%/86
an v>~is5 vi)ass OFFICIAL RECORD COPY I:RA Murley
/86 SALP-LINVILLE-NMP2- 0003.0.0 07/16/86
I ~l
ENCLOSURE
U.S.
NUCLEAR REGULATORY COMMISSION SALP MANAGEMENT MEFTING ATTENDEES Licensee: Niagara Mohawk Power Corporation 300 Erie Boulevard, West Syracuse New York 13202 Facility: Nine Mile Point Unit 2 Meeting Conducted: Meeting Held: NRC Attendees Licensee Attendees: Other: May 30, 1986 Region I, King of Prussia, Pennsylvania T. Murley, Regional Administrator J.
M. Allan, Deputy Regional Administrator R. Starostecki, Director, Division of Reactor Projects (DRP) W.
F.
Kane, Deputy Director, DRP W.
V. Johnston, Deputy Director, Division of Reactor Safety (DRS) S. J. Collins, Chief, Projects Branch No. 2, DRP J. Durr, Chief, Engineering Programs Branch, DRS J. Linville, Chief, Reactor Projects Section 2C, DRP R.
Gramm, Senior Resident Inspector, NMP Unit 2 W. Cook, Senior Resident Inspector, Ginna C. Marschall, Resident Inspector, NMP Unit
M.
M. Shanbaky, Chief, Facilities Radiation Protection Section, Division of Radiation Safety 8 Safeguards (DRSS) R. Nimitz, Senior Radiation Specialist, DRSS M. Haughey, Project Manager, NRR W. J.
Donlon, President T.
E.
Lempges, Vice President,, Nuclear Generation J.
A. Perry, Vice President, Quality Assurance T. A. Perkins, General Superintendent D-. Quamme, Project Director A.
F. Zallnick, Manager, Nine Mile Point Unit 2 Licensing C.
G.
Beckham, Quality Assurance Manager - Projects G.
K. Afflerbach, Startup Manager M. Wetterhahn, Attorney, Conner 8 Wetterhahn