IR 05000400/1993018

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-400/93-18.Info Provided Acceptable Course of Action
ML18011A232
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/29/1993
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Orser W
Carolina Power & Light Co
References
NUDOCS 9311160132
Download: ML18011A232 (5)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9311160132 DOC.DATE: 93/10/29 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION LINE,W.E.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION ORSEREW ST Carolina Power

& Light Co.

SUBJECT:

Ack receipt of 931011 ltr informing NRC of steps taken to correct violations noted in insp rept 50-400/93-18.Info provided acceptable course of action.

DZSTRZBUTZON CODE:

ZEOZD COPZES RECEZVED:LTR I ENCL Q SZZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.

DOCKET 05000400 S

0500040('

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES/HFB EXTERNAL: EG&G/BRYCEzJ.H.

NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME LEiN AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DIR REG E

GN2 FILE

NRC PDR COPIES LTTR ENCL D

C t1 NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

Docket No. 50-400 License No. NPF-63 Carolina Power and Light Company ATTN:

Mr.

W. S. Orser Executive Vice President Shearon Harris Nuclear Power Plant P. 0.

Box 165

- Mail Zone

New Hill, NC 27562-0165 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/93-18 Thank you for your response dated October ll, 1993, as requested by Inspection Report No. 50-400/93-18.

We have reviewed the information you have provided and have found it to be an acceptable course of action.

The adequacy of your corrective actions as implemented will be reviewed during the next annual

,.emergency preparedness exercise and at your November 4, 1993 drill if scheduling permits.

Should you have any questions concerning this letter, please contact us.

Sincerely, WWN4 IED BY Skf.IAMB. CUNE CC:

William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards W.

R. Robinson Plant Manager Harris Nuclear Plant P. 0.

Box 165 New Hill, NC 27562-0165 H.

W. Habermeyer, Jr.

Vice President Nuclear Services Department Carolina Power

& Light Company P. 0.

Box 1551

- Mail OHS7 Raleigh, NC 27602

.

'-50052 9311160132 931029'DR ADOCK 05000400

PDR

V J

~

Carolina Power and Light Company (cc:

cont'd)

David HcCarthy, Hanager Regulatory Affairs Harris Nuclear Project P. 0.

Box 165 New Hill, NC 27562 H.

Ray Starling Vice President

- Legal Department Carolina Power and Light Co.

P. 0.

Box 1551 Raleigh, NC 27602 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Commerce

& Natural Resources P. 0.

Box 27687 Raleigh, NC 27611-7687 Karen E.

Long Assistant Attorney General State of North Carolina P. 0.

Box 629 Raleigh, NC 27602 Public Service Commission State 'of South Carolina P. 0.

Box 11649 Columbia, SC 29211 Admiral Kinnaird R.

HcKee 214 South Horris Street Oxford, HD 21654 Robert D. Har tin 3382 Sean Way Lawrenceville, GA 30244 bcc:

H. Christensen, RII N. Le, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Route 1,

Box 315B New Hill, NC 27562 Commission RII:D SS W artor 10/zl/93 I:DRSS IOP'93 RII:DRP CChristensen 10/g +93