Insp Rept 50-400/89-26 on 891002-06.No Violations or Deviations Noted.Major Areas Inspected:Commercial Grade Procurement & Design,Design Changes & Mods
ML18005B131
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/01/1989
From: Jape F, Edwin Lea
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18005B130 List:
References
50-400-89-26, NUDOCS 8911130210
Download: ML18005B131 (4)


Text

c(

~p,R RECT P0 Cy

!.

Ih

/y +**y 4 UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30323 Report No.:

50-400/89-26

.

Licensee:

Carolina Power and Light Company P. 0.

Box 1551 Raleigh, NC 27602 Docket No.:

50-400 Facility Name:

Harris Inspection Conducted:

October 2-6, 1989 Inspector:

.-fir./~,~3 E.

Lea e./J Approved by:,

I F. Jape; Secti'

ref guality Performance Section

.

Division of Reactor Safety License No.:

NPF-63 Date Signed ate

>gne SUMMARY Scope:

This routine, unannounced inspection was in the areas of Commercial Grade Procurement and Design, Design Changes and modifications.

Results:

A total of seven PCRs were reviewed to determine the adequacy of the licensee procurement program, and the technical support provided.

Special attention was focused on commercial grade procurement.

For the PCRs and their associated procurement packages reviewed, the use of comercial grade items in safety related application was limited.

The dedication process selected by the licensee for ITE breakers, which were procured commercial grade, was inadequate (the inadequacy will be addressed in an upcoming resident inspector's report).

The procurement of safety related items, which are unique to nuclear, were performed adequately.

In the areas inspected, violations or deviations were not identified.

891ii302io 89ii03 PDR ADOCK 05000400

PNU

-i REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • J. Hammond, Manager, Onsite Nuclear Safety
  • C. Hinnant, Plant General Manager
  • C; McKenzie, Manager, guality Assurance Engineering
  • L. Olsen, Project Specialist, Technical Support
  • D. Tibbitts, Director, Regulatory Compliance
  • R.'an Metre, Manager, Technical Support
  • M. Wallace, Senior Specialist, Regulatory Compliance
  • L. Woods, Engineering Supervisor, Technical Support Other licensee employees contacted during this inspection included engineers, operators and administrative personnel.

NRC Resident 'Inspector

\\

  • M. Shannon
  • Attended exit interview Acronyms and initialisms used throughout this report are listed in the last paragraph.

2.

PROCUREMENT, DESIGN CHANGES AND-MODIFICATIONS (37700/38703)

The inspector performed a cursory review of the programs for the procurement of components and equipment currently installed in safety related applications at Shearon Harris Nuclear Power Plant.

The review addressed the procedures that govern the procurement process, with special emphasis given to the upgrade/dedication of 'commercial grade items for use in safety-related application.

To evaluate the implementation of the program, the inspector reviewed plant procedures, plant change requests, modifications, maintenance work orders, procurement package and interviewed li'censee personnel.

The procurement of materials and components used at Shearon Harris is governed-oy plant procedure PMC-OOl, Procurement and Cataloging of Parts, Materials, Equipment, and Services, Revision 4.

Procedure TMM-104, Determination of Technical and gA Requirements for Procurement Document, establishes the method for determining and assigning both technical and gA requirements for the materials and components purchased.

TMM-104 also defines the methods used to dedicate commercial grade items for use in safety related application The inspector selected the following PCRs to review.

Each PCR was reviewed to determine if there was a

need to procure new materials/components or a need to upgrade existing ones:

PCR-1957 PCR-2271 PCR-3700 PCR-3709 PCR-3732 PCR-3801 PCR-4007 PCR-1957, Auxiliary Feedwater Agastat Changeout, was initiated to address a

blowdown valve positioning problem which occurred when a low low level signal in any steam generator is received.

Upon receipt of a low low level in any steam generator the AFW pump auto starts and the blowdown valves should close.

The problem occurred once the signal was received, in that the blowdown valves did not have adequate time to move off the "open" limit switch within the five second period allowed by the time delay relays.

If the valves did not travel off the open limit switch within the time provided, a "seal-in" in the blowdown valve circuity would occur.

The "seal-in", which is in the open position, would result in the blowdown valves returning to their full open position.

The two Agastats used had a range of 0.5-5 seconds.

The original setpoint was one second.

The setpoint was changed to five seconds via FCR-SI-989 during blowdown pre-operational testing.

The licensee realized that the five second setpoint was at the upper limit of the relays'ange, and that these instruments are unreliable at either end of their range.

The recommended action was to replace the relays with two model 7012PCLL Agastats (1.5-15 seconds).

The licensee later realized that the five second setpoint was still to low to assure closure of the blowdown valves.

The licensee then initiated PCR 2271, Blowdown Time Delay, to add time delay relays in series with the existing relays.

The relays added were 20-200 seconds, with a setpoint of 120 seconds.

The licensee then decided that it was no longer necessary to change the existing relays from 0.5-5 seconds to 1.5-15 seconds.

They instead changed the setpoint to 4.5 seconds, which should be within the time de'lay relay's reliable operating range.

The total time allowed to assure blowdown'alve closure is 124.5 seconds.

The auto start of the AFW pumps remained the same (4.5 seconds).

The inspector reviewed the original Ebasco purchase data to determine how the Agastat relays were procured.

The Agastats purchased were provided unoer contract number NY-43528.

They were purchased for installation in a Sequencer Panel which is Class 1E.

Oualification of the panel and components supplied were provided in compliance with IEEE-344 arid IEEE-323 standards.

Documentation reviewed supported the qualifications of the components purchase The inspector also reviewed the purchase order and other documentation associated with the relays installed under PCR 2271.

The purchase order contained sufficient information to assure that the component being procured would meet the design requirement/qualifications of original components.

Not all PCRs required material/component changes.

PCR-3792, ASCO Model Discrepancies, was written to resolve discrepancies that occurred when PCR-3269 was written.

PCR-3792 provided calculation corrections for gualified Lives (g.L.) for the. elastomers and coils used in various ASCO solenoid valves.

These valves are used in var ious applications throughout the plant.

The calculations are used to establish maintenance scheduling, such as preventive maintenance and replacement intervals.

The calculations are also used to establish suitability for various applications, such as Eg or non-Eg applications.

The PCR also indicated that the responsible group, which is engineering, did not provide specific enough information in PCR-3269 to assure that all required documents were changed.

Inadequate information.was also noted in 'one other PCR reviewed.

The PCR was reviewed at the request of the resident inspector to address URI 89-17-01.

The URI was identified in the Resident Inspector Report No.

50-400/89-17,.

The URI addressed the use of commercial grade ITE molded case circuit breakers in safety related applications.

It appeared that the licensee's technical/engineering group did not provide specific testing requirement to assure that the commercial grade circuit breakers were adequate for safety-related applications.

The licensee's oedication of the breakers was performed through PCR-4007.

Complete details will be provided in a future resident inspector's report.

Within these areas, no violations or deviations were identified.

3.

Exit Interview The inspection scope and results were summarized on October 6, 1989, with those persons indicated in paragraph 1.

The inspector described the areas inspected and discussed in detail the inspection results.

Proprietary information is not contained in this report.

Dissenting comments were not received from the licensee.

4.

Acronyms and Initialisms AFW FCR IEEE PCR PMC gA TMM URI Auxiliary Feedwater Field Change Reque'si Institute of Electrical and Electronics Engineers Plant Change Request Procurement and Material Control guality Assurance Technical Support Management Manual Unresolved Item