IR 05000387/1982006

From kanterella
Jump to navigation Jump to search
Confirmation of Action Ltr 82-16 Re IE Emergency Preparedness Appraisal Rept 50-387/82-06 on 820422 & 820501 & 20 Concerning Emergency Preparedness.Util Will Complete All Procedures Including Mgt Approval & Issuance
ML20053B986
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/24/1982
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
CAL-82-16, NUDOCS 8206010397
Download: ML20053B986 (3)


Text

....

. -.

-

-_. _ _

. _ _

_ -._ - ___

.

.

MAY 2 41932 Docket No. 50-387 CAL No. 82-16 Pennsylvania Power and Light Company ATTN: Mr. Norman W. Curtis I

Vice President Engineering and Construction - Nuclear

2 North Ninth Street Allentown, Pennsylvania 18101'

Gentlemen:

Subject:

Inspection 50-387/82-06 This refers to a meeting between Mr. B. D. Kenyon and other members of the Pennsylvania Power and Light Company staff and Mr. R. W. DeFayette and other l

members of the NRC Emergency Preparedness Appraisal Implementation team which was held at the Susquehanna Steam Electric Station on April 22, 1982, to a telephone conversation between Mr. S. H. Cantone and Mr. Gary L. Snyder of my staff on May 1, 1982, and a telephone conversation between Mr. De Fayette and Dr. Bores of the NRC and Mr. J. Minneman of your staff on May 20, 1982. With regard to the matters discussed relating to emergency preparedness, we understand that you will undertake and complete the following actions prior to fuel loading:

i 1.

Revise the list of alternate EOF Support Managers to include personnel at levels of management who can meet the EOF Recovery Manager Qualifi-cations, and provide the required training to those individuals.

,

2.

Complete all Emergency Preparedness Implementing Procedures, including

management approval and issuance.

3.

Provide training for a sufficient number of individuals in the emergency organization.

This training shall focus on the Emergency Preparedness Implementing Procedures and on the specific functional

~

duties assigned to each individual.

4.

. Complete the purchase, testing, and distribution of the pagers which will be used for staff augmentation, and demonstrate by unannounced drills that the additional specified persons in the proposed staffing plan can be onsite in about 30 or 60 minutes after initial notification.

Records must be kept for these drills.

OFFICIAL RECORD COPY

,

82,06 010 2pg g p,p;

.

. _.

- _.

.

-

- - -

-

- - -

-.

-

..

-

,

Pennsylvania Power and Light Company

gyg,32 5.

Revise the Implementing Instructions to clearly indicate to the i

Emergency Director his responsibility for making initial offsite protective action recommendations.

'

6.

Develop Emergency Action Levels (EALs) based on actual and projected I

plant status and conditions and on the potential for radioactive releases to the environment.

7.

Complete the installation, testing, and calibration of the post-accident I

!

sampling system for reactor coolant and containment atmosphere.

Train personnel in use of the system, i

8.

Ensure that all emergency equipment, supplies, kits, and facilities (such as decontamination facilities) used by emergency response l

personnel and emergency response teams are completed, stocked, and

available at the proper locations.

'

9.

Complete the installation and testing of the public prompt notification system. The test shall be an integrated "operabilfty" test of the

installed systems and shall be activated from the location specified in the emergency procedures.

The test is intended to confirm that

'

the integrated system can operate properly upon activation.

Results of the test shall be documented.

If our understanding of your planned actions, described above, is not in accordance with the actual plans and actions'>eing implemented, please contact H. W. Crocker of this office by telephone (21 2) 337-5000, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the receipt of this letter.

.

Sincerely, Original Signed By:

George H. Smith, Director Division of Emergency Preparedness

and Operational Support cc:

B. D. Kenyon, Vice President, Nuclear Operations S. H. Cantone, Manager, Nuclear Support

,

A. R. Sabol, Manager, Nuclear Quality Assurance.

W. E. Barberich, Licensing Engineer H. W. Keiser, Superintendent of Plant Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Pennsylvania j

NRC Resident Inspector 0FFICIAL RECORD COPY l

t Y

- -

-

-

.

.

Pennsylvania Power and Light Company

MLY Z 1 G12 bcc:

Region I Docket Room (with concurrences)

L. Narrow, Reactor Inspector Chief, Operational Support Section (w/o encl)

,,

/,

,