IR 05000388/1982013

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-388/82-13 on 821115-19.No Noncompliance Noted.Major Areas Inspected:Installation of safety-related Cables,Cable Trays/Conduits & Electrical Equipment
ML20028D604
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/04/1983
From: Bettenhausen L, Finkel A, Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028D603 List:
References
50-388-82-13, NUDOCS 8301190321
Download: ML20028D604 (7)


Text

.

.

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-388/82-13 Gocket No. 50-388 License No. CPPR-102 Priority

--

Category B

Licensee: Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Facility Name: Susquehanna Steam Electric Station, Unit 2 Inspection At: Berwick, Pennsylvania Inspection Conducted:

November 15-19, 1982 Inspectors:

0/-0 P /3 A. Finkel,/ Lead Reactor Inspector date AAn Gv---

4, Me3 yPlisco,ReactorInspector f

date'

Approved by:

M/f/8

//&

~

L. H. Beftenhausen, Acting Chief, Plant date l

Systems Section, DETP Inspection Summary:

Inspection on November 15-19, 1982 (Report No.

50-388/82-13 Areas Inspected:

Routine, unannounced inspection by two region based inspec-tors of activities pertaining to the installation of safety-related cables, cable trays / conduits and electrical equipment. The inspection involved 62 inspector hours onsite by two region based inspectors.

Results: No violations were identified.

l 83J1190321 830105 PDR ADOCK 05000388 PDR

<

_ _ _ _ _ _ _ _ _ _ _ _ _

.

DETAILS 1.

Persons Contacted Pennsylvania Power and Light Company

  • P. Beckley, Resident Quality Assurance Engineer
  • J. Buczyrski, Senior Project Engineer
  • S. Denson, Project Construction Manager
    • G. Gulliver, Nuclear Quality Assurance
    • S. Koons, Nuclear Project Engineer
  • M. Parker, Coordination Engineer, Nuclear Quality Assurance
  • R. Prato, Nuclear Licensing
    • D. Reiment, Nuclear Project Engineer
  • R. Schwartz, Supervisor Engineering, Construction Bechtel Power Corporation
  • T. McHenry, Assistant Project Field QC Engineer
  • A. KonJura, Lead Field QA Engineer
  • T. Minor, Project Field Engineer
  • W. Mouser, Field Construction Manager
  • J. O'Sullivan, Field Engineering United States Nuclear Regulatory Commission
  • J. McCann, Resident Inspector
  • denotes personnel present at exit meeting.
    • denotes those licensee personnel the inspector contacted by phone at the Corporate Office Allentown, Pennsylvania.

2.

Facility Tour The inspectors observed work activities in progress, completed work and construction status in various areas of the site. Work items were examined for obvious defects and for violations with regulatory require-ments and licensee commitments. The presence of quality control inspec-tors was observed in various locations throughout the site. Specific work activities and completed work observed by the inspectors included installation of cables, and plant electrical equipment.

No violations were identified.

3.

Licensee Actions on Previous Inspection Findings (Closed) Unresolved Item 79-02-02 pertaining to revision review of Quality Control Instruction (QCI's) after initial review.

Procedures

- _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

.

.

.

have be changed to require QCI changes to be reviewed by the licensee before issue.

This item is considered closed.

(Closed) Violation 81-06-03 pertaining to solenoid valves not identified with hold tags in accordance with procedural requirements. The inspec-tors reviewed nonconformance report no. 7834 and the associated corre-spondence which documents the deficiency and disposition. Documentation indicated that hold tags had been placed on all the non-conforming solenoid valves. At the time of the inspection the solenoid valves were in place and had been reinspected. The inspectors verified that the solenoid valves were reinstalled.

--

This item is considered closed.

(Closed) Violation (81-07-01) pertaining to installed damper control assembly for HDM-17508A&B not conforming to certified drawings of the procured system. The licensee also noted four additional deviations from the drawings during the investigations of this problem. As a result, sn inspection was performed on all control dampers ordered from American Warming and Ventilation Co., which were installed in Unit #2.

The inspectors verified that the changes have been corrected and instal-lation modification were inspected.

This item is considered closed.

(Closed) Unresolved Item (388/81-07-02) pertaining to the mounting plate for the Damper control assembly.

The inspectors reviewed Design Change Package 532 which implemented reinforcement of solenoid valve mounts for the pneumatically operated dampers to meet seismic qualification require-ments. The modifications were verified to be accurate by seismic quali-fication tests documented on vendor prints 8856-M396-3-1 and 8856-M396-S-1. The inspections, results, and corrective actions taken were documented in the disposition of NCR 7834.

The inspectors reviewed the disposition of NCR 7834 and found it to be acceptable.

This item is considered closed.

4.

Electrical Cable and Terminations - Work Observations The inspectors observed work performance, partially completed work and completed work, as appropriate, relative to selected cables, raceways and terminations to determine whether the requirements of applicable speci-fications, work procedures and inspection procedures are Seing accom-plished in accordance with NRC requirements and licensee commitments.

., _

_ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ -. _

___

.

.

a.

The inspectors reviewed the following applicable documentation and procedures used by construction personnel:

--

Field Procedure (FP)-E-1, Revision 5, " Procedure for Handling and Storage of Electrical Cable"

--

Field Procedure (FP)-E-Z, Revision 7, " Procedure for Installa-tion and Computer Documentation of Electrical Raceways'!

--

Field Procedure (FP)-E-4, Revision 6, " Procedure for Installa-tion of Permanent Plant Electrical Equipment"

--

Field Procedure (FP)-E-5, Revision 6, " Procedure for Cable Card Control and Installation of Electrical Cables" Field Procedure (FP) E-8, Revision 2, " Procedure for Cable

--

Termination Card Control and Termination of Electrical Cables.

Drawing 8856-E-58, Cable Codes and Description

--

--

Drawing 8856-E-59, Cable and Wire Installation Procedures Quality Control Instruction E-4.0 " Installation of Class 1E

--

Electrical Cables" The above documents were updated as required by the program documen-tation and signed by the responsible personnel.

No violatioas were identified.

b.

The inspectors witnessed a cable pull for cable Bk2V14515 from 2C 236A to 20624. On review of the applicable cable pull card, it was noted that the scheduled length for the cable was 103', but the actual length recorded on the card was 300'.

The QC Inspector and General foreman were questioned about the large discrepancy between the cable lengths. They stated that the raceway length was actually measured, but it is not recorded. The Electrical Superintendent determine * t v cable length to cut using pull card length and a safety Dutm D;e cable cut from the reel is recorded on the pull card e etb personnel also stated once the cable is terminated, the y aec A is returned to the shop and the amount is subtract-ed fd m the ce#1e length on the pull card. The cable length on the pull card is used to document the actual cable length. The pull card data is entered into the computer program and is the data that produces the information in the Circuit Schedule Control Document.

The inspectors determined that the licensee has not defined what is excessive cable length and the numbers stated by the licensee varied from 5 feet to 30 feet to 10% of the cable pulled length. Neither the cable installation procedure FP-E-5 Revision 6 nor the termina-tion procedure FP-E-8 addre-'es the subject of up-dating the pull

.

.

card cable lengths with the field cable cut length data.

To verify this condition the inspectors reviewed the following cable pull cards:

Circuit Cable No.

Scheduled Length Actual Length CF200803A 252'

265'

CF2Q3002A 142'

180'

PF2V2600A 233'

280'

CF2A0407A 56'

100'

EP280503S 23'

30'

EP280503L 157'

275'

PP2S1201A 491'

555'

RK2Q7002Q 395'

560'

The inspectors determined that the " Circuit Actual Length" value on the pull card was the "as cut" length and not the "as terminated" length. A review of the Electrical Circuit Schedule data verified that the data is the "as cut" length of cable and not the "as terminated" length.

The "as built" design of the safety related cable system appears to have cable length data that is on an average of 40% over the installed figure. This was also identified by the licensee in their Performance Evaluation Summary report objective number CC-4.

This item is unresolved pending NRC review of licensee's evaluation and resolution.

(388/82-13-01)

5.

Cable and Raceway Separation The inspectors observed work performance and completed work to ascertain whether the location, routing, physical separation as well as electrical separation of various circuits are being accomplished as specified in the applicable specifications, work procedures ar? :nspection procedures.

The following areas were specifically inspe -

2:

Upper Cable Spreading Room, elevation 753'

--

--

Equipment Room, elevation 771'

--

Lower Cable Spreading Room, elevation 714'

--

Engineered Safeguards Auxiliary Bus 2E No violations were identifie.

.

6.

Electrical Cables and Terminations - Quality Records The inspectors reviewed quality related records relative to electric cables, terminations and related equipment to ascertain whether these records reflect work accomplishment consistent with NRC requirements and licensee commitments.

a.

The inspectors reviewed the records of two licensee formal Quality Assurance audits and ten informal audits associated with cable installation, raceway installation, and cable termination to ascer-tain whether the records confirmed that the required audits were performed and that the deficiencies identified were corrected and documented.

No violations were identified.

b.

The inspectors reviewed ten licensee nonconformance reports relative to cables, terminations and related equipment to ascertain whether the records are current, complete, reviewed ad reflect that appro-priate corrective action was taken.

No violations were identified.

c.

The inspectors reviewed five cable tension calculation worksheets to ensure that cable pull procedures were being followed, calculations were completed in accordance with the licensee guidelines and that pulling (tension) limits were not exceeded.

No violations were identified.

d.

The inspectors reviewed thirteen safety-related cable termination Cards including the associated quality control inspection records and megger test data sheets. Minor discrepancies were identified by the inspector which were corrected by the licensee before the inspectors left the site.

It appeared that the discrepancies were due to carelessness in recording dates and data.

No violations were identified.

e.

The inspectors reviewed nine safety-related cable pull cards includ-ing the associated quality control inspection record.

The following discrepancy was noted:

Cable PPZSIZ01A indicated that the cable was machine pulled and

--

that a dynamometer was used, but the maximum tension allowed block was signed as "N/A" (not applicable), and no maximum tension was stated on the QCIR as required by procedure.

The discrepancy was immediately brought to the attention of the licensee. The licensee supplied the inspector the appropriate cable

O V

pull tension calculation worksheet and verified that the maximum tension was not exceeded. A memo to file was entered by the licensee to correct the pull card.

No violations were identified.

.4 7.

power, Voltage and Relay Study The licensee is preparing a power, voltage and relay study for the present design of the Unit 2 electrical systems. The inspectors informed the licensee that due to the wide tolerance on cable pull length, refer-ence paragraph 4, the calculation used in the power and voltage calcu-lations could have errors on an average of over 40%.

This item is unresolved pending NRC review of licensee's evaluation and resolution.

(388/82-13-02)

8.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items or violations.

Unresolved items identified during this inspection are discussed in Details, paragraphs 4 and 7.

9.

Exit Meeting The inspectors met with licensee and contractor representatives (denoted in paragraph 1) at the conclusion of the inspection on November 19,.1982.

The inspector summarized the scope and findings of the inspection as described in this report.

-