U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No. 50-387/82-38 Docket No. 50-387 License No. SNM-1878 Safeguards Group IV Licensee: Pennsylvania Power and Light Company Two North Ninth Street
'
- .
Allentown, Pennsylvania 18101 Facility Name: Susquehanna Steam Electric Station Inspection At: Berwick, Pennsylvania
.'
Inspection Conducted:
September 1-2, 1982 Date of Last Physical Security Inspection:
June 21-25, 1982 Type of Inspection: Preoperational Physical Protection Inspection bre,/f[-
//-/- f 2__
Inspectors:
/W.' Madden,' Physical Protection date Inspector Approved by:
//'
O
/o L
-_
A. T/ G6dy, Chief, Safe ards & Fuel Facilities date Section, Nuclear Mate als &
Safeguards Branch Inspection Summary:
Announced Preoperational Physical Protection Inspection on September 1-2, 1982 (Report No. 50-387/82-38)
Areas Inspected:
Security Plan change proposal under the provisions of 10 CFR 50.54(p). The inspection involved 13 inspector-hours on-site by one NRC in-spector and was begun during regular hours.
Results: The licensee was found to be in compliance with NRC requirements within the area examined.
.
.
8211300390821116
^
DR ADOCK 05000387 i
PDR t
--
-
.
,
.
.
j DETAILS
>
1.
Key Persons Contacted H. W. Keiser, Site Superintendent
- G. L. Adams, Supervisor of Operations
- C. Sprunk, Director, Corporate Security
- R. Stotler, Supervisor, Site Security
- F. Eisenhuth, Senior Compliance Engineer J
D. Flyte, Senior Project Engineer
- K. Hart, Technical Section
,i R. Kelm, Supervisor, System Security (Corporate Security)
F. Malek, Security Training Supervisor
'
/
- R. Prato, Licensing Representative i
- R. Prego, Nuclear QA/ Operations
-
R. Gaudreau, Security System Coordinator C. Lopes, Sr. Security Shift Supervisor D. Mitchell, Compliance Engineer
'
K. Heffelinger, Supervisor, Personnel Security G. Rhoads, NRC Resident Inspector
..,
D. Kunze, NRC Plant Protection Analyst (NMSS)
- denotes those present at the exit interview.
2.
30703 - Exit Interview The scope and findings of the inspection were discussed with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspec-tion on September 2, 1982.
The inspector stated the purpose of the inspection.
3.
81118 - Security Plan (SGI)
)
i
.
.
l
!
e d
- e-3-(SGI)
..
.
J i
!
'!
,
I
,
,
e i
i
!
e i
-"
e---
- - - - -, _ _.,,, _ _, _ _ _ _ _ _ _
__
"'--"--------.7,<,
,__
__ _
-'----v
--,, _,