IR 05000387/1982038

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-387/82-38 on 820901-02.No Noncompliance Noted.Major Areas Inspected:Security Plan Change Proposal Per 10CFR50.54(p).Safeguards Info Deleted (Ref 10CFR2.790)
ML20028B445
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/10/1982
From: Gody A, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028B440 List:
References
50-387-82-38, NUDOCS 8211300390
Download: ML20028B445 (3)


Text

..

"

s<

-

.

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-387/82-38 Docket No. 50-387 License No. SNM-1878 Safeguards Group IV Licensee: Pennsylvania Power and Light Company Two North Ninth Street

'

.

Allentown, Pennsylvania 18101 Facility Name: Susquehanna Steam Electric Station Inspection At: Berwick, Pennsylvania

.'

Inspection Conducted:

September 1-2, 1982 Date of Last Physical Security Inspection:

June 21-25, 1982 Type of Inspection: Preoperational Physical Protection Inspection bre,/f[-

//-/- f 2__

Inspectors:

/W.' Madden,' Physical Protection date Inspector Approved by:

//'

O

/o L

-_

A. T/ G6dy, Chief, Safe ards & Fuel Facilities date Section, Nuclear Mate als &

Safeguards Branch Inspection Summary:

Announced Preoperational Physical Protection Inspection on September 1-2, 1982 (Report No. 50-387/82-38)

Areas Inspected:

Security Plan change proposal under the provisions of 10 CFR 50.54(p). The inspection involved 13 inspector-hours on-site by one NRC in-spector and was begun during regular hours.

Results: The licensee was found to be in compliance with NRC requirements within the area examined.

.

.

8211300390821116

^

DR ADOCK 05000387 i

PDR t

--

-

.

,

.

.

j DETAILS

>

1.

Key Persons Contacted H. W. Keiser, Site Superintendent

  • G. L. Adams, Supervisor of Operations
  • C. Sprunk, Director, Corporate Security
  • R. Stotler, Supervisor, Site Security
  • F. Eisenhuth, Senior Compliance Engineer J

D. Flyte, Senior Project Engineer

  • K. Hart, Technical Section

,i R. Kelm, Supervisor, System Security (Corporate Security)

F. Malek, Security Training Supervisor

'

/

  • R. Prato, Licensing Representative i
  • R. Prego, Nuclear QA/ Operations

-

R. Gaudreau, Security System Coordinator C. Lopes, Sr. Security Shift Supervisor D. Mitchell, Compliance Engineer

'

K. Heffelinger, Supervisor, Personnel Security G. Rhoads, NRC Resident Inspector

..,

D. Kunze, NRC Plant Protection Analyst (NMSS)

  • denotes those present at the exit interview.

2.

30703 - Exit Interview The scope and findings of the inspection were discussed with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspec-tion on September 2, 1982.

The inspector stated the purpose of the inspection.

3.

81118 - Security Plan (SGI)

)

i

.

.

l

!

e d

..

.

J i

!

'!

,

I

,

,

e i

i

!

e i

-"

e---

- - - - -, _ _.,,, _ _, _ _ _ _ _ _ _

__

"'--"--------.7,<,

,__

__ _

-'----v