Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
Text
. ,
.
. <-
Il APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-382/88-06 -Operating License: HPF-48 Docket: 50-382 Licensee: Louisiana Power & Light Company (LP&L)
317 Baronne Street
'
New Orleans, Louisiana 70160 Facility Name: Waterford 3 Steam Electric Station (W3 SES)
Inspection At: Taft, Louisianna Inspection Conducted: February 29 through March 4, 1988 Inspectors: I_ m /'n /PB Dat'e /
-
DN. Kelley, Reac) tor Jhpeh, Test Programs Section, Division of\Deactor. Safety
%
G. A. Pfik,' Feactor Inspector, Operational
[ Date lZs IT8h
'
Prograts Stction, Division of Reactor Safety Accompanying Personnel: P. O. Chopra, D. L. Wigginton, and A. Notafrancesco, Nuclear Reactor Regulation Approved: # </h=///
W. C. Seidlq) Chief, Test Programs Section Date Division of Reactor Safety Inspection Summary Inspection Conducted February 29 through March 4, 1988 (Report 50-382/88-06)
Areas Inspected: Nonroutine, announced inspection of diesel generator
>
reliability / operability and Technical Specifications reportabilit i, PDR ADOCK 05000382 O DCD
-
,
.
h.
l-
i Results: Within the two areas inspected, no violations or deviations were identified; however, the inspection team members expressed their concern over LP&L's nonconservatism in regard to "A" diesel generator operation outside of-its design basis, f
'l i
!
!
,
f l
l l
l l
l l
.
,
.
. .
DETAILS Persons Contacted
- G. E. Wuller, Operational Licensing
- H. J. Meisner, Licensing Manager
- S. A. Alleman, Quality Assurance Manager
- P. V. Prasankumar, Assistant Plant Manager, Plant Technical Services
- N. S. Carnes, Nuclear Plant Manager
- R. P. Barkhurst, Vice President, Nuclear
- R. S. Starkey, Operations Superintendent
- D. E. Baker, Event Analysis Manager P. N. Backes, Assistant to Plant Manager, Special Projects C. R. Gains, Staff Assistant R. A. Legere, Plant Engineering, System Engineer
'
K. McBee, Instrument and Control L. Laughlin, Licensing M. K. Smith, Electrical Supervisor The NRC inspector also interviewed other selected licensee personne * Denotes those licensee personnel attending the exit intervie . Diesel Generator Reliability / Operability A special Region IV inspection team composed of two Region IV reactor inspectors and three representatives from the Office of Nuclear Reactor ;
Regulation were dispatched to W3 SES on February 29, 1988. The team's
'
objective was to assess the reliability of the "A" train diesel generator to perform its design safety function until the scheduled refueling outage in April 198 , Background W3 SES is equipped with two Cooper-Bessemer emergency diesel generators. The diesel generators are lined up in the emergency start mode during reactor power operatio The W3 SES Technical Specifications (TS) require certain periodic tests to be performed to demonstrate operability. Technical Specification 4.8.1.1.2-4(b)
specifies the starting methods for the tests. There are four start signals specified: manual, simulated loss-of-offsite power by itself, simulated loss-of-offsite power in conjunction with an emergency safety feature (ESF) actuation test signal, and an ESF actuation signal by itself. The last three start classifications are emergency starts. In the emergency start mode, all trips are bypassed except engine overspeed and generator high differential fault tri In the manual start mode, several other trips are active. One such trip is turbo charger low lube oil pressure. When-d
_ _ _ _ _
. .
,
.
the engine is started, all engine trips are bypassed for 15 second At the end of 15 seconds, in the manual start mode, all the engine trips are activ ,
In June 1987, during two consecutive days when the manual' start mode was used, the "A" diesel engine tripped aTtei the 15-second bypass timed out. The trips were annunciated as low turbo lube oil pressure. Each time it was restarted, the engine ran satisfactoril '
This trip circuit continued to degrade until in October 1987, and thereafter, the engine manual start had to be initiated twice each time a manual start was initiated. Consistently, the turbo charger low lube oil pressure would trip the engine on the first attempt to start. The subsequent start would result in satisfactory operatio b. Inspection I Because of the licensee's misinterpretation of the reporting requirements
, for valid and nonvalid failures, the gradual deterioration from the ,
design basis for the "A" diesel generator was not apparent to the i NRC. When the condition became known to the NRC, the question of l reliability and operability arose. Region IV determined that an immediate team inspection would be required to make these determination ,
The team identified above arrived on site on February 29, 198 Prior to the arrival of the team, the Region IV W3 SES docket file <
was searched for all Licensee Event Reports (LERs) and special l
reports from 1984 to the present. The results of the docket search revealed no new information and did not identify reports of these
diesel generator start problem The team met with the LP&L diesel generator system engineer and several technical support personnel. The team received a detailed briefing from the licensee's technical staff and reviewed in detail the electrical and pneumatic control system diagrams. These documents were Cooper-Bessemer Pneumatic Drawing KSV-36-11 and Control Wiring Diagram 65-553-110, Sheets 1-3 and 1 To verify that the oil pressure was indeed not an issue, the licensee started the "A" diesel generator in the emergency mode. There were three team members at the diesel generator to monitor the turbo charger lube oil pressure and the overall engine start process. Two team members were in the control room to observe the starting process l and monitor the remote instrumentation. The local condition l indication prior to engine start for the turbo charger oil pressure !
was 3 psig. After engine start, the pressure rose to 7.5 psig (5 psig is minimum). As the engine warmed up, the pressure leveled !
out at 8.0 psig. The team also verified that the low turbo charger '
oil pressure trip and alann did not reset in 15 seconds as designed, i but did reset a short time late ;
l l
1
- -
. _ _ _ _ _ _ _ _
.
,. .
.
,
Additional discussion with the system test engineer and review of the I diesel generator outage schedule disclosed that the pneumatic control ,
system on the "A" diesel generator is going to be rebuil The control air system rebuilding and the diesel generator work will be l monitored by the NRC during the April 1988 refueling outag A review of licensee procedures was conducted by the NRC inspectors to determine if a program for identification and correction of adverse plant system and equipment conditions was in plac The procedures included in the review are listed below: i NPD-0005, Revision 1, "Corrective Action," dated October 26, 198 QAP-012, Revision 6 "Corrective Action," dated February 26, 198 UNT-5-002, Revision 7, "Condition Identification," dated July 7, 198 UNT-5-015, Revision 0, "Work Authorization Preparation and Implementation," dated July 20, 198 MD-1-014 Revision 2. "Conduct of Maintenance," dated l December 19, 198 ;
In addition to the above procedures, a series of Potential Reportable Events (PRE) from 1985 to 1988 were examined. The PRES selected were all identified problem occurrences with the emergency diesel <
generators. A list of the PRES examined is contained in Attachment 1 l to this repor I
!
c. Findings I (1) Procedural Review
A system of adverse condition identification is in plac The identification system is use !
Provisions for scheduling of corrective maintenance are in l effec Directions for the production of detailed work instruction are provide *
The licensee also included the philosphy of timely correction of adverse condition l
___ _ - - _ - _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(
r .
.
.
.
(2) Potential Reportable Events Associated With A Diesel Engine
The engine trip in the manual start mode is caused by a failure of the pneumatic control system to reset the turbo charger low oil pressure trip prior to the time out 15-second delay of the er'11ne trip *
The failure is probably caused by internal air leakage in the pneumatic control syste *
The low oil pressure tri) is completely bypassed when the diesel generator is in tie emergency start mode (this is the nonnal lineup when the reactor is in Modes 1, 2, 3, or 4).
There have been, from January 1986 to present, 58 emergency starts with one failure. The failure was due to an electrical component failure in the engine governor control syste Note: The "B" emergency diesel generator experienced air leakage problems of a different nature. A mini-outage to repair those air leakage problems was conducted in early February of this year and the problems were satisfactorily correcte Therefore this report does not address the "B" emergency diesel generato d. Conclusions The conclusions drawn by the team were that:
(1) The 'A' diesel generator will satisfactorily perform its safety '
functio (2) The present manual start problem does not pose a significant safety problem that would preclude continued power plant operation to the scheduled refueling outage in April 198 (3) The purpose of the manual start test surveillance requirements of TS 4.8.1.1.2.a is to verify the overall condition (not just the safety function) of EDG 'A'. This testing function has been defeated since June 198 (4) Although LP&L was aware of the spurious lube oil pressure trip problem and the operation of the diesel engine was different than the design basis, no corrective actions were taken to find the root cause and effect necessary repairs in a timely manne (5) The diesel generators at W3 SES have been start tested very I frequently. There.were a total of 104 starts for Diesel Generators "A" and "B" during the year 1987. Many of these l
.
.
.
starts were performed as Actuation Signal (ESFAS) part of the subgroup Engineered relay Safety functional tes Feature The NRC inspectors believe the operability of these relays can be demonstrated without actually starting the diesel generator The licensee plans to reevaluate their test procedures to see if the operability of the ESFAS relays can be demonstrated without starting the emergency diesel generator ;
3. Technical Specifications Reportability The inspection team reviewed the PRES related to the diesel generators to !
detennine reportability as required by the Technical Specifications. The I NRC inspectors concluded that several of the PRE's should have been 1 reported in accordance with Technical Specification 4.8.1.1.3. This was previously identified in NRC Inspection Report 50-382/87-25 (Unresolved Item 382/8725-05) and will be followed up by the resident inspecto ,
The Region IV reactor inspectors reviewed the below listed PRES to determine whether their disposition was in agreement with the requirements of 10 CFR 50.73. The listing includes the PRE number, whether LP&L has ;
closed the PRE file and in which Plant Operations Review Connittee (PORC)
meeting the PRE was reviewed:
J )
!
PRE N Status PORC Meeting N '87-044 Open 87-123
,87-045 Closed 87-104 87-062 Closed 87-104 l
'87-063 Open 87-100 I 87-066 Closed 87-100 ;87-067 Closed 87-153 )87-080 Closed 87-123 l 87-082 Closed 87-153 87-085 Closed 88-001 87-088 Open 88-010
,87-089 Closed 87-146 :
87-090 Closed 88-001 87-091 Closed 87-134
.87-104 Closed 87-149
- 87-114 Open 88-001
'87-115 Closed 88-010 The disposition by LP&L of the PRES listed above were determined to be in accordance with the requirements of 10 CFR 50.73. Review of the remaining PRES will be completed in later NRC inspections.
,
No violations or deviations were identified.
,
v - .-- -
_ _ _
- -
.
e
4. Exit Interview The Region IV reactor inspector sunnarized the inspection scope and findings on March 4, 1988, with the licensee representatives identified in paragroph 1,
r-
. .
,
- , .*
ATTACHMENT'1
.
The following Potential Reportable Event (PRE) reports were reviewed that concerned diesel generator problems:
PRE N Report Subject 85-148 - EDG B wouldn't start following maintenance 85-201 LER 85-054 Loss of offsite power 85-208 SR 85-022 EDG A Surveillance Test Failure 86-007 EDG B Tripped 86-020 EDG A Tripped 86-036 SR 86-004 EDG A Tripped 86-105 EDG A Turbo bearing sei:ed during .
maintenance
.{
,86-113 EDG A Tripped on overspeed 87-013 EDG B Fuel Injector Leak 87-047 EDG A Test Failure due to air leak l
'
- 87-059 EDG A Trip - Lo Turbo charger lube oil pressure
- 87-061 EDG A Trip - Lo Turbo charger lube ;
oil pressure ;
t
'87-073 EDG A Spurious Bearing Temperature Trip ;87-086 EDG B Failed control circuit fuses
'
- 87-106 EDG A Trip - Lo Turbo charger lube ,
oil pressure
- 8'-113 EDG A Trip - Lo Turbo charger lube oil pressure
- 88-005 EDG A Trip - Lo Turbo charger lube oil pressure
- 88-015 EDG A Trip - Lo Turbo charger lube oil pressure
- 0ccurred on manual diesel engine start J