ML20151M482

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/88-06 on 880229-0304.No Violations or Deviations Noted
ML20151M482
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20151M485 List:
References
NUDOCS 8804250062
Download: ML20151M482 (2)


See also: IR 05000382/1988006

Text

~ _ _

_

. _ _

. .

,

. c

In Reply Refer To:

Docket: 50.382/88-06

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuc kar Operations

317 Baronne Street

New Orleans, Louisiana 'i0160

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Kelley and G. A. Pick

cf this office and three members of the Nuclear Reactor Regulation staff during

the period February 29 through March 4,1988, of activities authorized by NRC

Operating License NPF-38 for the Waterford 3 Steam Electric Station, cnd to the

discussion of our findings with Mr. R. P. Barkhurst and other members of your

staff at the cc,aclusion of the inspection.

Areas examined during the inspection included determination of diesel generator

reliability / operability and Technical Specifications reportability. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

Within the scope of the insoection, no violations or deviations were

identified.

We understand that a compre w sive maintenance plan has been developed to

restore the emergency diesel generators to their design basis. We further

,

understand this is to be accomplished during the refueling outage which began

on April 1, 1988. If this is contrary to your understanding, then please

notify this office promptly.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

DtE inal SIB

n 3. Call *

,

L. J. Callan, Director l

Division of Reactor Projects j

[ Enclosure: (see next page)

TPS:RI * OPS:RE * C:TPS * D:DRS *

hh

C:DRP/A D:0R RECONCUR

DLKelley/cz GAPick WCSeidle JLMilhoan DD <amberlain LJCal an WCSei le $

/ /88 / /88 / /88 / /88 4 uf/88 q /(5/88 4//. 88

  • Previously concurred

l

8804250062 880415

PDR ADUCK 05000382 l \k

Q DCD

. .. .

. .

,

. o

,

Louisiana Power & Light Company -2-

Enclosure:

Appendix - NRC Inspection Report >

50-382/88-06 w/ attachment-

cc w/ enclosure:

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite ,

Licensing Coordinator

P.O. Box B 1

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P.O. Box 61000

New Orleans, Louisiana 70161 '

Louisiana Power & Light Company

ATTN: K. W. Cook, Nuclear Safety and ,

Regulatory Affairs Manager

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI R. D. Martin, RA
  • SectionChief(DRP/A) *DRP
  • RPSB-DRSS * MIS System
  • Project Engineer, DRP/A *RSTS Operator
  • RIV File *J. Wilson, NRR Project Manager
  • R. Hall *DRS
  • TSS Lisa Shea, RM/ALF

D. Powers *G. Pick

  • D. Kelley *W. Seidle
  • w/766

. - _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - - _ _ _ _