IR 05000373/1982027

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-373/82-27 on 820429 & 0611. Noncompliance Noted:Failure to Control Access to Protected Area.Details Withheld (Ref 10CFR73.21)
ML20058E671
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/13/1982
From: Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058E660 List:
References
50-373-82-27, NUDOCS 8207300147
Download: ML20058E671 (1)


Text

.

.

4.

Ij.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-373/82-27(DETP)

.

Docket No. 50-373 License No. NPF-11 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: LaSalle Nuclear Power Station, Unit 1 Inspection At: LaSalle County, IL Inspection Conducted: April 29 and June 11, 1982 Date of Last Physical Security Inspection: First. Physical Security Inspection conducted after license issuance Type of Inspection: Announced, Special Physical Protection Inspector:

wf (f MA 7[/J/fE-T.[ic/adeda Date

.

Phys al Protection Specialist

[/O Ob Approved By:

.

-5

. R. C:;eed, Chief D' ate '

afeguards Section s

Inspection Summary

.

Inspection on April 29 and June 11, 1982 (Report No. 50-373/82-27(DETP))

Areas Inspected:

Included a selective review of Access Control Measures (personnel and packages) in the Contractor Access Facility (CAF). The inspection involved three inspectar-hours onsite by one NRC inspector and two hours for an enforcement meeting with the licensee. The inspection began during regular hours.

Results: One item of noncompliance was identified during this inspection.

Ac. cess Control: The licensee failed to control access to the protected area.

(Details )

I

!

Enclosure Contains SAFEGUARDS If1FORMATICM Upon Separation This Page is Decontrolled 8207300147 820926 PDR ADOCK 05000373 O

PDR