Report No. 50-373/82-27(DETP)
.
Docket No. 50-373 License No. NPF-11 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: LaSalle Nuclear Power Station, Unit 1 Inspection At: LaSalle County, IL Inspection Conducted: April 29 and June 11, 1982 Date of Last Physical Security Inspection: First. Physical Security Inspection conducted after license issuance Type of Inspection: Announced, Special Physical Protection Inspector:
wf (f MA 7[/J/fE-T.[ic/adeda Date
.
Phys al Protection Specialist
[/O Ob Approved By:
.
-5
. R. C:;eed, Chief D' ate '
afeguards Section s
Inspection Summary
.
Inspection on April 29 and June 11, 1982 (Report No. 50-373/82-27(DETP))
Areas Inspected:
Included a selective review of Access Control Measures (personnel and packages) in the Contractor Access Facility (CAF). The inspection involved three inspectar-hours onsite by one NRC inspector and two hours for an enforcement meeting with the licensee. The inspection began during regular hours.
Results: One item of noncompliance was identified during this inspection.
Ac. cess Control: The licensee failed to control access to the protected area.