ML20032A375
| ML20032A375 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 10/16/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20032A376 | List: |
| References | |
| NUDOCS 8110290467 | |
| Download: ML20032A375 (2) | |
See also: IR 05000373/1981035
Text
E Hy HLt COPY
.
-
.
OCT161981
yy
to
6
%
7
.
p
p
Docket No. 50-373
Commonwealth Edison Company
T, y
O 1997
ATTN:
Mr. Cordell Reed
g
' Qg%,
Vice President
v(j
g\\g
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. D. E. Miller
of this office on September 28 and 29, 1981, of activities at LaSalle County
Nuclear Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99
and to the discussion of our findings with Mr. Holyoak and others at the
conclusion of the inspection.
4
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit.
If we do
i{
PMB
8110290467 811016
PDR ADOCK 05000373
G
fe' 0 6
L -
~
.
.
..
-
Commonwealth Edison Company
-2.
OCT161981 '
not hear from you in this regard within the specified periods noted above, a.
copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We.will gladly discuss any questions you have concerning this inspection.
Sincerely,
Mrastnai srsneuy c.r. n=n==
C.-E. Norelius, Director
Division of Engineering and
-
Technical Inspection
-Enclosure:
IE Inspection
Report No. 50-373/81-35
cc w/ enc 1:
Louis O. DelGeorge
Director of Nuclear
Licensing.
L. J. Burke, Site
Construction Superintendent
-T. E. Quaka, Quality-
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson
Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
- RI
RIII
RII
RIII
M
er/to
GregEr
ann
gI
10/15/81.
/O-/f-g(
to
d --
.
.
. .