IE Insp Repts 50-373/79-40 & 50-374/79-26 on 791109 & 19.No Noncompliance Noted.Major Areas Inspected:Review of Procedures,Observation of Preservice Insp Work Activities & Review of Nondestructive Examination Data Repts
ML19211D325
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/03/1979
From: Danielson D, Ward K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19211D322 List:
References
50-373-79-40, 50-374-79-26, NUDOCS 8001170529
Download: ML19211D325 (5)


Text

.

U.S. NUCLEAR REGULATORY COMMISSION

.

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-373/79-40; 50-374/79-26 Docket No. 50-373; 50-374 License No.

CPPR-99; CPPR-100 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:

La Salle County Station, Units 1 and 2 Inspection At: La Salle Site, Marseilles, IL Inspection Conducted: November 9 and 19, 1979 K.h D. Ward

/

7[/f Inspector:

l w

Approved by:

D. H. Danielson, Chief

/.3)3)7 7 Engineering Support Section 2 Inspection Summary Inspection on November 9 and 19, 1979 (Report No. 50-373/79-40; 50-374/79-26)

Areas Inspected: Review of procedures; observation of preservice inspection (PSI) work activities; review of nondestructive examinations (NDE) data reports.

The inspection involved a total of 17 inspector-hours onsite by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

1763 231 8001170 52 W

.

DETAILS

.

Persons Contacted Commonwealth Edison Company (CECO)

L. Burke, Site Project Superintendent

  • G. Groth, Field Engineer D. Shoza, Quality Assurance Engineer General Electric Company (GE)

L. Wheatley, Project QC Supervisor The inspector also contacted and interviewed other licensee and contractor employees.

  • Denotes individual present at final exit interview.

Functional or Program Areas Inspected 1.

General

.

Preservice inspection (PSI) of Unit 1 is to be completed approximately February 1980 and Unit 2 approximately December 1980.

General Electric Company hired NDT Services, Incorporated and Trans-Eastern Inspection, Incorporated to assist them in performing PSI.

2.

Review of Revised and New Preservice Inspection Procedures The following procedures were reviewed.

GE, Liquid Penetrant Examination of Nuclear Power Plant Components, a.

PP-S751, Rev. 6, November 5,1979.

b.

GE, Calibration Control Program, QC-001, Rev. 1, May 14, 1979.

GE, Automated Ultrasonic Testing of RPV Welds and Base Material, c.

'

APUV S751, Rev. 3, November 1, 1979.

d.

GE, Manual UT Examination of Flange Ligaments, MPUL-S751, Rev. 2, September 17, 1979.

GE, Determination of Wall Thickness, QC-002, Rev. 2, April 9, 1979.

e.

f.

GE, Automated Ultrasonic Testing of Nozzle to Vessel Welds, APUN-S751, Rev. 3, November 1, 1979.

1763 232

_2_

,

g.

GE, Surface Thermometer Control Program, QC-003, Rev. 1, November 7, 1979.

h.

GE, Installation and Services Engineering Division Nondestructive Examination Personnel Qualification and Certification Program, NDE PQ-8000, Rev. 5, March 10, 1978.

i.

GE, Apparatus Service Business Division, Personnel Training Qualification and Certification Procedure, No. A5BD-NDT-1101, Rev. 2, August 1, 1977.

j.

GE, Nuclear Energy Division, Certification of Nondestructive Test Personnel, 386HA480, Rev. 2, April 10, 1978.

k.

NDT Services, Procedures for the Qualification and Certification of Nondestructive Examination Personnel to SNT-TC-1A, 1975 Edition.

1.

Trans-Eastern Inspection, Incorporated, Certification of NDT Personnel, TEl-A-07, August 15, 1978.

No items of noncompliance or deviations were identified.

3.

Observation of Work and Work Activities The inspector observed and had discussions with GE personnel during the NDE. The observations included calibrations, performance of nondestructive examinations and review of documentation. The auto-matic vessel scanning system was observed performing ultrasound examinations of the circumferential seam weld "AB" between shell ring 1 and 2 on the reactor pressure vessel.

No items of noncompliance or deviations were identified.

4.

Review of Data and Audit Reports The inspector reviewed the following:

a.

Information available for the PSI activities to date.

b.

Audit of GE Oa4 Brook office, Oak Brook, Illinois by CECO.

c.

Audits of GE PSI by CECO.

d.

Surveillance reports of GE PSI by CECO.

e.

Surveillance reports of GE PSI by GE.

f.

General Inspection Reports of GE PSI by CONAM Nuclear Energy Services, Incorporated (NES).

}fh)2.

-3-

.

.

No items of noncompliance or deviations were identified.

5.

Material and Equipment Certifications The following materials and equipment certifications were reviewed:

a.

Liquid Penetrant - Magnaflux Materials Penetrant - batch No. 78E073 Developer - batch No. 79E033 Cleaner - batch No. 79C014 b.

Ultrasonic Complant - Glycerine P. O. #391N0234-1 c.

Ultrasonic instruments, transducers and calibration blocks.

No items of noncompliance or deviations were identified.

6.

NDE Personnel Certifications The following NDE personnel certifications were reviewed and found to be in accordance with SNT-TC-1A, 1975 Edition.

GE NES Name UT PT D. Bogues II P. Ramsey II J. Albaneese II F. Bernardo II R. Hooper II I

S. Razi III III NDT Services Name MT UT PT J. Story II II R. Austin II R. Piettak II II II C. Homler II II T. Telder II II S. Volk II K. Cutright II L. Frederick I

II 1763 234-4-

.

Trans-Eastern Inspection,

,

Incorporated Name UT PT D. Frazier II T. Holcombe II II R. Palmer II II J. Sheldon II S. Herman II II L. Holcombe II II J. Case II R. McLain II No items of noncompliance or deviations were identified.

7.

Exit Interview The inspector met with Mr. G. Groth at the conclusion of the inspection.

The inspector summarized the scope and findings of the inspection noted in this report.

.

-5-