IR 05000373/1979022

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-373/79-22,50-374/79-09,50-454/79-09, 50-455/79-09,50-456/79-07 & 50-457/79-07 on 790521.No Noncompliance Noted.Major Areas Inspected:Fuel Loading Schedule,Electrical Area & QA Personnel
ML19242A271
Person / Time
Site: Byron, Braidwood, LaSalle  Constellation icon.png
Issue date: 06/07/1979
From: Barrett P, Fiorelli G, Hayes D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19242A244 List:
References
50-373-79-22, 50-374-79-16, 50-454-79-09, 50-454-79-9, 50-455-79-09, 50-455-79-9, NUDOCS 7908010193
Download: ML19242A271 (4)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

~

Report No. 50-373/79-22; 50-374/79-16; 50-454/79-09; 50-455/79-09; 50-456/79-07; 50-457/79-07 Docket No. 50-373; 50-374; 50-454; 50-455; 50-456; 50-457 Licensee:

Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name:

La Salle Nuclear Power Station, Units 1 and 2 Byron Nuclear Power Station, Units 1 and 2 Braidwood Nuclear Power Station, Units 1 and 2 Inspection At:

Region III office, Glen Ellyn, Illinois Inspection Conducte,d:

May 21, 1979 Inspectors:

D."

H s

7 N

.A a

f C W{e

~ 7~ 2 N'

R. C. Knop 5 'l G.

rel J. G. heppler A-11 79

/ C' h I;;relli,Chie{

[ -/

Approved By:

u.

Reactor Construction and

$

Engineering Support Branch 4u0 25 I A

7908010 / I3 G

.

.

Inspection Summary

,.

Inspection on May 21, 1979 (Report No. 50-373/79-22; 50-374/79-16; 50-454/79-0); 50-455/79-09; 50-456/79-07; 50-457/79-07)

Areas Inspected: A special announced meeting was conducted to discuss the performance of the three Commonwealth Edison Nuclear Stations under construction.

Results:

Of the areas discussed, no further items of noncompliance or deviations were identitled.

jt U,r; i J ' yP,'

+

i

. ~, -

U-2-

i DETAILS

-

1.

Attendance CECO J. J. O'Connor, President B. Lee, Jr., Vice President (Construction, h oduction, Licensing

-

and Environmental Affairs)

L. Peoples, Director, Nuclear Licensing F. Palmer, Division Manager, Nuclear Stations A. Kleinrath, Manager Station Construction

'd. Shewski, danager Quality Assurance C. Reed, Assistant Vice President C. Young, Compliance Administrator h}_C J. G. Keppler, Director G. Fiorelli, Branch Chief, Reactor Construction and Engineering Support Branch D. Hayes, Section Chief, Engineering Support Section 1 R. Knop, Section Chief, Projects Section

'

Barrett, Reactor Inspector, Engineering Support Section 1 2.

Corporate Meeting This meeting was held between corporate management from Commonwealth Edison Company and RIII represent. 'ves to review m

clear the performance of the three Commonwealth Ed Stations under construction and also include?-

a.

Post I.ispection Findings A number of items in which the NRC felt improveruent was warranted included:

-

Direction and osarview provided by Electrical QA/QC Contractor personnel.

'

Number of outstanding unresolved and noncompliance

-

items in the electrical area.

-

Amount of train?ng and turnover experience provided to QA personnel curing job changes.

b hl-3-460

\\

-

liousekeeping as it concerns protection of equipment and attitude of workers.

-

Supplemental inspection required in areas where initial inspection was not adequate (electrical terminations and connectors, equipment cabling).

b.

future Potential Issues r

A number of items which could impact on fuel loading schedule were discussed. These items were:

-

Equipment Qualification record review.

-

Testing of control cables (meggering or other suitable checks).

Resolution of the unresolved items.

-

-

Review of balance of plant equipment effect on safety related equipment.

-

Resolution of fire barriers and seal design.

During the wrapup session it was discussed and agreed that periodic meetings would improve problem resolution between the two parties. The next meeting is tentatively set for mid-summer 1979.

.

J