IR 05000369/1982010

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-369/82-10 on 820224-0323.No Noncompliance Noted.Major Areas Inspected:Operation Safety Surveillance, Safety Sys Challenges,Significant Event Followup & Fire Brigade Responsibilities
ML17194B011
Person / Time
Site: McGuire 
Issue date: 04/12/1982
From: Bemis P, Bryant J, Ignatonis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17194B012 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.E.4.2, TASK-2.F.1, TASK-2.K.1, TASK-2.K.3.01, TASK-2.K.3.05, TASK-2.K.3.09, TASK-3.A.1.2, TASK-TM 50-369-82-10, IEB-79-06A, IEB-79-6A, NUDOCS 8205040399
Download: ML17194B011 (6)


Text

4015N Dresden Station Units 2 and 3 Proposed Changes to Operating Licenses DPR-19 and DPR-25 Technical Specifications..

Revised Page:

.. **.>",:*<*-~*~',~*::1.~:jtiJ}~~tuu~.~.)'~2w1&1t.Lin *Sifti+* ;:.;~: 1w ~

,,. *..

DPR-19
. r, I.JMITiNG CO~l>ITION F<>lt OPERATIO ~~~----------~--.,.,...------.:--------------------......... ~ '

I conL'\\lnmcnt cool Ing subsystem, both core spr:iy *subsystems and holh diesel gt.*ner-.

ntors required fur opcr:tllon of such components If no external source or *

  • power were available, shall be operabl * f.the requirements of l. S. B cannot be met an orderly shutdown shall be initiated and the reactor shall be in a Cold Shutdown condition within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> J

C. HPCI Subsystem Except as specified In 3.5.C.2 below, the llPCI subsystem shall be operable whenever the reactOr pressure Is *greater th:in 90 *pstg and Irradiated fuel ls In the reactor vesse.

From :ind after the date that the JIPC subsystem Is made or found to be lnoper-nblc for any reason, reactor opcrntlon ls permissible only during the succeeding seven days unless such subsystem ls sooner made operable, provided that dur-ing such seven days all active components of the Automallc *~rcssure Relief Sub-system, the core spray subsystems, LPCI *

subsystem.. and Isolation cooling system.

are operabl.

l.:f the requirements of l. 5.c canno.t be *met an orderly shutd<>Wn ~hall be in:ltiated"and the reactor pressure. shall be reduced to *

90 psig With.in 24 lrour *

'.5 SURVEILLANCE REQUmEMEN,

Surveillance of HPCI Subsystem shall be performed as follows:.

1...HPCI Subsystem Testing shall be as specl-

_.flecHn 4.5.A.1.n; b, c, d, and f, except lhal thf: llPCI pump shall deliver at least

.

. 5000 gpm against a system head correspon"-

i ng to a reactor vessel pressure of 1150 psfg* *

. to 150 psl **

. the LPCI subsystem, both core spray subsystems, the auto-matic pressure* relief subsystem, and the motor operated isolation valves and shell side *make-up system for the isolation condenser system shall be demonstrated to be operable immediatel The motor operated isolation valves and shell side make-up system of the isolation condenser shall be demonstrated to be operable daily thereafte Daily demonstration of the automatic pressure relief sub-system operability is not required provided that tvo feedwater pumps are operating*at power levels above 300

-,,...

HWe; and' one feedwafer pump is operating as normally re-quired with one additional feedwater pump operable at power levels less than 300 MW *.""!

--

....-..~~'

-~.;

~:

DPR...;25

  • .,,--.;.....--~--------------------

.. :*:I.a uinTING CONl>rnoN Fdlt OPERATION

..

4.G *SURVEILU\\~CE REQUmEMENT*


~-------~--~ ~-+----------.-~---.----~--~---~---------~

cont.'\\lnmcnl cool lnat subs)"slcm, both core ilpray subs~*sll-n1s and bolh diesel St\\*ncr-alors required (ur Upt.*rnllun c1r SUCh componC?n~s H no cxlt'rnal source of power **ere available, sh.'lll be operable *

.

.

. -

4. If the requirements of 3.5.B cannot be *et an orderly shutdown shall.be initiated and the reactor shall be in a Cold Shutdovn

  • condition vi thin 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. HPCI SUbsystem Except as specified In_ 3. 5. C. 2 below, the HPCI subsystem shall be operable whenever the reactor pressure ls greater than 90 pslg and Irradiated fuel ls In the

'reactor vessel~

From and al\\cr tho dale lhat lhe HPCI *

subsystem Is made or found to be Inoper-able for any reason, reactor operation l* *

permissible only during lhe succeeding

.

seven days Wllcss such subsystem Is sooner made operable, provided that dur-

.lng such seven days all active components of the Aulomallc Pressure Reller Sub-system, the core spray subsystems, LPCI

  • subsystem, ond lsolallon cooling system are operabl. 1.* If the requirements of 3.5.t; cannot be aet an orderly shutdown. shall be initiat~ and the reactor pressure shall be reduced to 90 psig within. 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *----'---*.,,.

i;.i

.

--~ -* _...__.,:.

c. Sunelllance of HPCI Subsystem shall be

_performed as follows: HPCI Subsystem Testing shall be as specl-

- necf:lll 4. 5. A~ I * a, b* c, d, and r, except I.tint. the: llPCI pu_mp..-hall dellnr at leDBt 5000 gpm against a system head correspond-ing to a reactor vessel preesure or 1150 psis to 150 pal.z *.

When it* is dete_ni.ine~ tha*t HPCI subsystem is inoperable, the LPCI subsystem, both core 'spray subsystems, the auto-matic J>Tessure_relief subsystem, and the motor operated isolation valves _and shell side make-up system for the isolation condenser system shall be demonstrated to be operable immediatel The motor operated isolation valves and shell side make-up system of the isolation condenser shall be demonstrated to be operable daily thereafte * *Daily demonstration of the automatic pressure relief sub-system operability is.not required provided that two

  • feedwater pumps are operating at power levels above 300 HWe; and one feedwater pump.is operating as normally re-quired *with one additional feedwater pump operable *at power levels les_s than 300 HWe *

.

"

'.

4015N Quad Cities Units l and 2 Proposed Changes to Operating License DPR-29 and DPR-30 Technical Specifications Revised Page: *.3.5/4.5-5

I

./.

  • QUAD-CITIES DPR-29 provided that dtring such 7 days all active compooem of the automatic pressure relief absystcms, the core spray ll.lbsystcm\\ LPCJ mode or the llHR system. udlhe RCJC system are operabl J. It the requimnmts or Specification 3.5.C cannot be m:t. an orderly shut*

down shall be iniiated. and the reac*

  • IOr pressure shallli: reduced to 90 psig within 24 llow y operable immedi,atel The RCIC system shall be demonstrated to be operable daily thereafte Daily demonstr~tiori of the

automatic pres,ure relief sub-system operabilty is hot required provided that two feedwater. pumps are operating ~t levels above.30U *

MWe; and one f~edwater pump is operating ~s ndrmally'required with one additional feedwater pump operable at power levels less than 300 MW.

.

D. Aatomadc Pressure llelieT Subsystems D. Automadc PrHsure Relier.Subsystems..

I. The automatic pessure relief subsys*

.tem shall be opable whene1er the reactor pressure is gr~aier than 90 psig. irradialcd kl is in the r~ac:tor w:uel. and prior to reactor stanup from a cold condiion. **

2. from and 1talhrda1e that one or th.

.*Amendment Ive relief valves cfithe automatic pres*

sure reliersubsystan is made or found IO be inoperable.. hen "the reactor is pressurized abovetO psig with irradi*

ated fuel in the rstor.Ve$sel. reaaor operation is pemasible only during lhe iucceeding 7 ays unless repairs

. ~ made and p!To'ided that during IUCh time &he WCI subsystem is operabl.a Plant operation shall be.

in accordance with 3.5.D*2 above except that,,for the current operating. cycle 5,.

four of the five relie valves of the ADS are required to be operabl In subsequent operating cycles, operation 1hall be

  • in accordance with 3.S~D.2 *.

If the requirements of Specif i-

. cation 3. 5.D cannot be met, ari *

orderly shutdown shall be initiated arid the reac.tor pressure shall be reduced to 90 psig within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> No~)rd': 55 Surveillance of the automatic pressure ~lier subsystems shall be perfor~cd as follows:

3.5/4.5-5 l. The-following surveillance shall be carried out on a six-month surveillance *

interval:

  • a *. With. the reactor at pressure each relief..

va,lve shall.be 111.&Dually opene Relief valve * *

opening shall be verified by a compensating turbine bypass val'.ve or control v~lve closur ~

.

2. A logic system functional test shall be performed each refueli~g outag '

.

3, A ~imulated auto~atic initi~tion which opens a11 pilot valves

shall be perf~*rmed each refueling outag.

.

  • .

. **

4 * When it is deterrrlined that one relief valve or the autotitatic pressure relief

.aubsystem is inoperable. the HPCI

  • shall be demonstrated 10 be operable immediately and weekly therc:af1er:

..,

. L~**

_.,

QUAD-CTIES DPR-30 provided that during such 7 days all active components of the automatic*

pressure relief subsystems, the core spray subsystems, LPCI mode of the RHR system, and the RCIC system are operabl. If the requirements of Specification 3.5.C cannot be met, an orderly shut-down shall be initiated, and the reac-tor pressure.,shall be reduced to 90 psig within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *

operable immediately*.

The RCIC system shall be demonstrated to be operable daily thereafte Daily demonstration of the..

automatic pressure relief sub-system operabilty is not r~qulred provided that two feedwater pumps are operating at le~els above 300 MWe: and one.feedwater pump is operating as normally required with one additional feedwatei pump operable at power levels less than 300 MW D. Automatic: Pressure Relief Subsystems

.

.

,

D. Automatic Pressure Relief Subsystems Surveillance of the automatic pressure relief sub*

I. The automatic pressure reiief subsys~

-tern shall be operable whenever the reactor pressure is greater than 90.

psig; irradiated fuel is in the reactor vessel and prior to reactor startup from a cold conditio. *. * From and after the date that one of the

  • five relief valves of the automatic pres-sure relief subsystem.is made or found.

. to be inoperable. when the reactor is pressurized about * 90 psig with irradi-

. ated fuel *hi the reac~or vessel, reactor.

operat~on is pennissible only during the succeeding 7 days unless repairs are made and provided that during such time the HPCl subsystem is operabl. If the requirements of Specification **.

3.5.D cannot be met, an orderly.shut- * * *

down. shall be. initiated and the reactor pressure ahall be *reduced to. 90 plig within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.. 514.5-5 systems shall be performed as follows:

1. The following surveillance shall be carried out on a 6 month surrveillance interval:.

i

. a * With the reactor at pressure each

  • relief valve sh8ll be manually opene Relief valve opening shall be verified by a compenlating turbine bypass valve or control valve closur. A logic system functional test.shall be performed each refueling outag.

A simulated automatic initiation which opens all pilot valves shall be performed each refueling outage.

4 * When it is determmed that one relief valve of the autori,atic pressure* relief subsystem is inoperable, the HPCI shall be demonstrated to be operable im-mediately and weekly thereafte..

Amendment 38 S/2/77