IR 05000369/1982037

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-369/82-37 on 821018-22.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security organization-mgt & Program Audit.Details Withheld (Ref 10CFR73.21)
ML20027E585
Person / Time
Site: McGuire 
Issue date: 11/08/1982
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20027E564 List:
References
50-369-82-37, NUDOCS 8211150513
Download: ML20027E585 (1)


Text

-

.

.,

'

    • W UNITED STATES Io NUCLEAR REGULATORY COMMISSION g

o REGION 11

,

E 101 MARIETTA ST, N.W,9JlTE 3100 f,,

I ATLANTA, GEoRO*". 2

,

\\...../

.

November 9, 1982

.

Report No. 50-369/82-37 Docket N'o 50-369 -

License'No. NPF-9 Liceisee: Duke Power Corporation (

422 South Church Street

,

'

Charlotte, NC 28242 Facility Name: McGuire Nuclear Station

Inspection at: McGuire Site near Charlotte, NC

-

Inspection conducted: October 18-22, 1982 j

'

Date of Last Physical Security Inspection Visit: September 7-10, 1982 Type of Inspec

announced P ysic Security

)

Inspector:

//W/

/} Wit

//

hh A. 'Til man,"

siYaT 5ei:6rity Inspector

~D4te Signed

~

X

/

//

/b Approved by:

.

L-D. R.'McGuire, Chief, Physical Protection Section 04te' Signed Technical Inspection Branch Division of Engineering and Technical Programs.

Inspection Summary g

Areas Inspected. Inclede review of Security Plan and Implementing procedures; Security 3 Organization-Management; Security Organization-Personnel; Security Organization-Response; Secur,ity Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers-Pr;'otected Areas; Physical Barriers " ital Areas; Security System Power Supply; dghting; Assessment Aids; Access :ontrol-Personnel; Access Control-Packages; Access j

Control-Vehicles; Des.ection Aids-Protected Area; Detection Aids-Vital Areas; l/

Alarm Stations; Communications; General Requirements For Personnel: Additional Requirements For Power Reactor and Fixed Site Personnel; and Safeguards Contingency Plan Implementation Review.

The inspection involved 39 inspector hours on site by one NRC inspec' tor. The

> inspection was begun during an offshift period; eight inspection hours were accomplished during offshift periods.

,

Results: The licensee was found to be in compliance with NRC requirements within the 23 areas examined during the inspection.

,

INCLOSURE CONTAINS

~.

j

O 00 69 UPON SEPARATION THIS PDR PAGE IS DECONTROLID-

'

O '

-

,

-

.