ML20054E197

From kanterella
Jump to navigation Jump to search
Responds to NRC 811215 Ltr Re Violations Noted in IE Insp Rept 50-346/81-18.Corrective Actions:Independent Review of Safety Features Actuation Sys Instrument Calibr Procedures Will Be Conducted to Verify Instrument String Accuracies
ML20054E197
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/26/1982
From: Crouse R
TOLEDO EDISON CO.
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20054E178 List:
References
1-250, NUDOCS 8204260244
Download: ML20054E197 (1)


Text

'

1TREDO

%me EDISON ACHARD P. Caoust vu %t man, 14193259 *4 21 Docket No. 50-346 License No. NPF-3 Serial No. 1-250 February 26, 1982 Mr. R. L. Spessard, Director Division of Resident and Project Inspection U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Spessard:

This letter is to identify ongoing activity related to your December 15, 1981 letter containing report 50-346/81-18. This deals with the violation of Appendix A Technical Specification Section 2.2.1 (Table 2.2-1). In addition to the corrective action taken in our letter of January 14, 1982 (Serial No. 1-239), Toledo Edison is providing an independent review of the Safety Features Actuation Systems (SFAS) ' Instrument Calibration Procedures. The intent of this' review is aimed at verifying SFAS instrument string accuracies. This will assure compliance with the Davis-Besse Technical Specification requirements and the appropriate Safety Analysis, i

This review is to be completed by March 31, 1982.

l Very truly yours, ffz 2 __ -

RPC:RFP:rs cc: DB-1 NRC Resident inspector l