IR 05000346/1978017
| ML19256A030 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Crane |
| Issue date: | 08/23/1978 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Grant TOLEDO EDISON CO. |
| Shared Package | |
| ML19256A031 | List: |
| References | |
| TASK-TF, TASK-TMR NUDOCS 7809260185 | |
| Download: ML19256A030 (2) | |
Text
s*
/
.
.
, s..y
<
.
r 4""
%
UNITED STATES
-
..
+
t NUCLEAR REGULATORY COMMISSION
[ g,.. X ) j REGloN iti
-
799 ROOSEVELT PoAD
'
{#p 3g g
,
GLEN ELLYN,ILLtNotS 60137 g
up s
....+
-
AUG 231978
C124 S N
~
Docket No. 50-346 I
~
-
Toledo Edison Company ATIN:
Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
Thisreferstothei'spectionconductedbyMr.J.S._Creswell).of this office on April 4-7, May 17-19, 25, June 27-30, July 20-21, and July 27-28, 1978, of activities at Davis Besse Nuclear Plant authorized by NRC Operating License No. NPF-3 and to the discussion of our findings with Mr. T. Murray at the conclusion of the inspec-tion.
The enclosed copy of our inspection report identifies areas
'
examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in noncompliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office within twenty days of your receipt of this notice a written statement or explanation in reply, including for each item of noncompliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further non-compliance; and (3) the date when full compliance will be achieved.
,
>
In our letter to you dated June 28, 1978, we brought to your
.
attention instances which we considered were symptomatic of a general degradation in adherence ro your management control Appendix A to this letter identifies additional systems.
matters which we feel relate to our stated concern. Although r~
g-
-
1917 245 ospinp0
.
.-
.
.. A -
--
y b
-
(
..
.
.
Toledo Edison Company-2-AUG 231978 we recognize that the matters described in Appendix A to this letter occurred prior to your July 24, 1978, response to our June 28, 1978 letter, we expect you to factor them into your cont nned review and i
_ _.
-
upgrading of your management controls.
~~
-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2. Title 10. Code of Federal Regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room, except.as follows. If the enclosures contain information that you or your contractors believe to be pro-prietary, you must apply in writing to this offica, within twenty days of your receipt of this letter, to withbold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and abould be prepared so that proprietary information identified in the application is cont =fnad in an anelnsure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely, l
James C. Kepplar Director h
Ynelnsures:
1.
Appendix A. Notica O
of Violation
2.
IE Inspection Report No. 50-346/78-17
,
cc w/-ael=:
Mr. T. D. Murray, Station Superi.stendent i O 1 '7 9kh L.
Central Files I/Ii Reproduction Unit NEC 20b
,
'
Iocal PDR
'
NSTC (1 g
lk l1 C[
"
U. Young Park, Power Siting Comission (
J fj_
'
,
,
,
(
_ _R,III_
RIII,___
omeo
-
I_
RIII RIM ___ _ RIIIg
--
p q,,--
swel1[bk su m u m
_ Tanbling_
- gln nL-
---
Streeter Fiorelli e ius_,
,
e r__
-n snaaa Wis;(18
~ c,. m. io x= m.n> ~ c om
.. _, _,,,,..
,,,,_,, m,
-
-