IE Insp Rept 50-346/78-06 on 771206-08 & 780306-08. Noncompliance Noted:Failure to Follow Procedures Re Startup Testing
ML19256B812
Person / Time
Site: Davis Besse, Crane  
Issue date: 04/19/1978
From: Creswell J, Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19256B808 List:
References
TASK-TF, TASK-TMR 50-346-78-06-01, 50-346-78-6-1, NUDOCS 7908310131
Download: ML19256B812 (1)


Text

.

-

M

%%

..

'

.

/)

.

c

., A s

.

7;

-

r

-

-

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

,

REGION III

t Report No. 50-346/78-06 f

Docket No. 50-346 License No. NPF-3

,

Licensee:*

Toledo Edison Co=pany I

Edison Plaza 300 Madison Avenue Toledo, OH 43652

!

Facility Na=e:

Davis-Besse Nuclear Power Station, Unit I h

T Inspection At:

Davis-3 esse Site, Oak Harbor, OR

[

Inspection Conducted: Dece=ber 6-8, 1977 and March 6-8, 1978

'

,

Inspector:.

// f/7 t

.

i

<

[

e

'

,

Acco=panying Personnel:

K. A. Connaughton Approved By: W.

S. utttle, Chief

// /O'

-

G

-

r Nuclear Support Section I

/

'

f Insoection Su==arv C

Inspection on Dece=ber 6-8, 1977 and March 6-8, 1978 (Rentrt No.

5C-346/76-06)

'

t Areas Insoected:

Routine, unannounced inspection of startup testing, natural circulation perfor=ance, and followup associated with rod

[

,

drop incident which occurred 'on Dece=ber 4, 1977.

The inspection L

involved 35 onsite inspector-hours by one NRC inspector.

Results:

Of the three areas inspected, no ite=s of nonco=pliance

[

,

were icentified in two areas. One ite= of nonce =pliance was ident-

,

ified in regard to startup testing.

(Infraction - Failure to follow

[

procedures - Paragraph 6)

'