i
.'.
.
.U.S.
NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION.AND ENFORCEMENT
-
REGION III
Report No. 50-346/78-25 License No. NPF-3
-
Docket No. 50-346 Licensee: Toledo Edison Company Edison Plaza 300 Madison' Avenue Toledo, OH 43652 Davis-Besse Nuclear Power Station, Unit 1 Facility name:
Inspection at: Davis-Besse Site, Oak Harbor, OH
f Inspection conducted:
September 28, 1978 h,,)". :2,vm ku
!S3)78
Inspector:
A. G. Vanuska h
ID 15 Approved by:
T. 'H.
Ess1g, ief Environmental and Special Projects Section Inspection Summary Inspection on September 28, 1978 (Report No. 50-346/78-25)
Areas Inspected: Routine, announced observation of (1) the. response by the. licensee's organization during a scheduled drill conducted by the licensee's Emergency Medical Contractor and (2) follow-up of open items from a previous Emergency Planning Inspection.
The inspection involved eight inspector-hours onsite by one NRC inspeccor.
No items of noncompliance or deviations were identified for Results:
the areas inspected.
7811290D)-
i l
.
i
-
.. -
-
.
- - - -
,
. - - - -
. - -, -.
.
.'
'
.
DETAILS
..
1.
Persons Contacted T. Murray, Station Superintendent
- W. Green, Administrative Coordinator D. Varwig, Safety Coordinator
"
- denotes those present at exit interview.
Licensee Action on Previous Inspection Findings 2.
Malfunctioning (Closed) Outstanding Inspection Item (346/78-09):
The inspector examined instruments in the emergency equipment.
radiological emergency equipment locker.
During a previous inspec-tion, batteries were found to be inoperable and corroded and battery The licensee acid was found in the bottom of an instrument case.
stored them with has removed all batteries from the instruments, the instruments, and has purchased heavy duty batteries which will be placed with all emergency monitoring instruments when received.
Site accountability.
(Closed) Outstanding Inspection Item (346/78-09):
The inspector reviewed the accountability used during the schedule 28, 1978 and determined that measures drill conducted on September taken since a previous inspection have facilitated more rapid Accountability may be further enhanced by the use accountability.
of a computer-controlled personnel access system to be used in con-junction with the security program at the site.
(Closed) Outstanding Inspection Item (346/78-09):
The Station Review Board reviewed the Emergency Plan Review.
(AD 1827.00) as required by Section 6.2 of the Plan.
Final approval date was May 3, 1978.
3.
Drill Observation The inspector observed the response by the licensee organization during a scheduled drill conducted by the licensee's emergency Corporation) on medical contractor (Radiation Management The drill was a combination drill and training September 28, 1978.
exercise.
Site Actions a.
The drill site was the 545 foot elevation R. C. Drain Pump The scenario involved two plant employees, one of whom Room.
-2-
. _ _
n'
.
.
became injured, contaminated and is in a radiation field.
Actions by the uninjured employee and the First Aid Team Ths' inspector noted a communication were prompt and proper.
Communications problem when additional help was requested.
problems were also noted by plant observers and discussed at the critique held after the conclusion of the drill.
'
the critique held at the station, the video tape of the
'
Atstation and hospital ac,tions was viewed and specific items
.
Two items that noted in the station segment were discussed.
were observed by a number of observers and the inspector were communications and the congestion and noise in the assembly area.
Communications involving the logging of actions as they take place, dissemination of information, the use of a dedicated communications line during an emergency, and monitoring of to the emergency were discussed.
all communications pertinent The congestion and noise in the assembly area was also dis-cussed, although the problem was taken care of during the drill. Station personnel stated that these two problems will be studied in detail.
These items will be reviewed during a future inspection.
4.
Exit Interview The inspector met with the licensee representative (denoted in Paragraph 1) at the conclusion of the inspection on September 28, The purpose, findings and scope of the inspection were 1978.
discussed.
.