ML20206P529

From kanterella
Jump to navigation Jump to search
Forwards Physical Security Insp Rept 50-341/86-14 on 860428-0530 & Notice of Violation.Rept Details & Notice of Violation Withheld (Ref 10CFR73.21)
ML20206P529
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/23/1986
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20206P534 List:
References
NUDOCS 8607020147
Download: ML20206P529 (2)


See also: IR 05000341/1986014

Text

-

7)Mli

bNNNNNb

JUN 2 31986

Docket No. 50-341

The Detroit Edison Company

ATTN:

Frank E. Agosti

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the reactive physical security inspection conducted by

Messrs. T. J. Madeda and G. L. Pirtle of this office on April 28 to May 30,

1986, of activities at the Enrico Fermi Atomic Power Plant, Unit 2, authorized

by NRC Operating License No. NPF-43 and to the discussion of our findings

with Mr. J. Piana and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

Inspection results identified two concerns that require immediate senior security

management attention. The first concern is identified in Paragraph 8 of the

enclosed report and refers to a significant weakness regarding your package

access control program. The second concern is addressed in Paragraphs 6

and 9 of the enclosed report and addresses the apparent lack of aggressive

and comprehensive action to assure that corrective actions for identified

deficiencies are sufficient to prevent recurrence.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21.

Consequently, the enclosure

to this letter, our report of the inspection, and your response to tha

violations identified in the enclosure to this letter will not be placed in

regarding the violations identified in the enclosure should be submitted as

the NRC Public Document Room. Therefore, your statement of corrective action

t

a separate enclosure to your transmittal letter in the manner prescribed.

i

Enclosuro Contains

nsefratt

ON

O

9607020147 e60623

h-

Page IS Decontro

'

PDR

ADOCK 0000

1

e

-

,

'.

'

,

hhk

'

The Detroit Edison Company

2

JUN 2 31986

The responses directed by this letter and the accompanying Notice

are not subject to the clearance procedures of the Office of Management

and Budget as recuired by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

. A. Hind, Director

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report

No. 50-341/86014(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

Resident Inspector, RIII

cc w/o enclosure, (UNCLASSIFIED

SAFEGUARDS INFORMATION):

DCS/RSB (RIDS)

Licensing Fee Management Branch

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness

Enclosure Contains

RIII

R

RI I

RIII

RIII

SAFEGUAFCS INFORMATION

%~

Upon separation This

"' *"g'

"0%

4"$%

i"e ' ~ '

c~ "" "

^

"

.

WMtM4MM