'o UNITED STATES t
','n NUCLEAR REGULATORY COMMISSION
$
E HEGION 11 o,
of 101 MAnlETTA ST N.W., SUliE 3100
%
e
ATLANTA, GEOnclA 30303 Report Nos. 50-339/80-01, 50-404/80-01, and 50-405/80-01 Licensee: Virginia Electric and Power Company Richmond, Virginia 23261 Facility Name: North Anna Power Station llocket Nos. 50-339, 50-404, and 50-405 License Nos. CPPR-78, CPPR-Il4, and CPPR-il5
,
inspection at Nort) Anna site near Mineral, Virginia inspector: //" T
,'( @
2; Y
4'
,
A. L. Cunninghamf / '
Ila t e' Signed
./
Accompanying Pers nry T.
MacArthur
..
Approved by:
gbj G. R.
un ins, Section Chief, FFMS Branch Date Signed SUMMARY Inspection on January 29 - February 1, 1980 Areas Inspected This routir.e, unannounced inspection involved 24 inspector-hours on-site in the areas of crosion and runoff control, construction waste management, review of previous inspection findings, preoperational program; management controls.
Results Of the five areas inspected, no items of noncompliance or deviations were identified.
.
e
,
i DETAILS 1.
Persons Contacted Licensee Employees
- W. B. Cartwright, Station Manager
- E. W. Harrell, Maintenance Superintendent
- J. H. Horton, Supervisor, Chemistry
- E. R. Smith, Technical Services Superintendent
- W. R. Madison, NRC Coordinator
- G. D. O'Connell, Reservoir Supervisor
- R. Swope, Senior Quality Control Inspector
- J.
W. White, Station Biologist
- R. T. Johnson, Construction Quality Control Engineer (VEPCO)
NRC Resident Inspector
- M.
S. Kidi
- Attended exit interview 2.
Exit Ints:rview The inspection scope and findings were summarized on February 1, 1980 with those persons indicated in Paragraph I above.
Unre.olved items identified during the previous inspection (IE Report Nos. 50-339/78-30, 50-404/78-8, and 50-405/78-8) were discussed and closed.
3.
Licensee Action on Previous Inspection Findings (Closed) Unresolved Item (50-339/78-30-01, 50-404/78-08-01, and 50-405/
78-08-01) Erosion Control.
Inspection disclosed that erosion of shoulders and berms along access roads to Units 1 and 2, and warehouse No. 5 pumphouse was eliminated. Adequate erosion control measures were implemented. There were no turther questions regarding this item.
~
(Closed) Unresolved Item (50-339/78-30-02, 50-404/78-08-02, and 50-405/
78-08-02) Runoff Control.
Inspection disclosed that excessive erosion and subsequent runoff from the east berm of the spoil storage and landfill zone along Units 1 and 2 access road were eliminated, and the appropriate controls implemented.
There were no further questions regarding this item.
4.
Unresolved Items Unresolved items were not identified during this inspection.
i
,
r
I-2-5.
Preoperational Programs Construction phase non-radiolo,1 cal preoperational programs referenced in Section 3E.(1) of the Construction Permits and detailed in Section 6.0 of the NRC Final Environmental Statement have been completed. Aquatic physicochemical and biological surveillance, and selected groundwater monitoring (Lake Anna Dam) programs have been continued under Appendix B, Technical Specifications to Unit 1 Facility License No. NPF-4.
There were no questions regarding this item.
6.
Construction Effects At the time of inspection, no construction activities having potential for adversely impacting atmospheric, terrestrial and aquatic environments were in progress. A detailed inspection of the site, which included review and observation of aLte drainage system, erosion and runoff control, construc-tion waste management and air quality, disclosed no apparent adverse impacts.
Tnere were no questions regarding this item, 7.
Management Controls Inspection procedures require review and verification of the licensee's management controls. Management controls applicable to construction stage environmental protection programs include the following basic items:
(1)
written procedures and instructions for control of all construction activities to preclude, or at least, minimize adverse impact; (2) periodic management audits for determining adequacy of implementation of environmental conditions and commitments; (3) maintenance of adequate records documenting compliance with environmental conditions defined in the Construction Permit.
The subject Construction Permits do not require such controls; however inspection disclosed that the licensee's management and implementation of environmental conditions and commitments was consistent with accepted industry practices.
.
O