March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2014001 AND 05000339/2014001
Dear Mr. Heacock:
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, North Anna Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, the NRC plans on documenting one non-ROP baseline inspection which includes an Operating License Initial Exam. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading/rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4609 with any questions you may have regarding this letter.
Sincerely,
/RA/
Steven D. Rose, Chief
Reactor Projects Branch 5
Division of Reactor Projects
Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7
Enclosure: North Anna Inspection/Activity Plan (03/01/2015 - 06/30/2016)
cc Distribution via ListServ
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII
SIGNATURE BDB3 SON SDR2
NAME B. Bishop S. Ninh S. Rose
DATE 2/27/2015 2/27/2015 3/02/2015
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
SUBJECT: ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2014001 AND 05000339/2014001
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 2 03/04/2015 09:41:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna Inspection / Activity Plan 03/01/2015 - 06/30/2016 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
1, 2 IP Problem Identification and Resolution 71152B 03/09/2015 03/13/2015 RP
- RADIOLOGICAL HAZARDS ANALYSIS
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/09/2015 03/13/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 03/16/2015 03/20/2015 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 06/08/2015 06/12/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/08/2015 06/12/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/08/2015 06/12/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/08/2015 06/12/2015 1, 2 IP Performance Indicator Verification 71151 06/08/2015 06/12/2015 RP
- RP PUBLIC RAD SAFETY BASELINE
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/15/2015 06/19/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/15/2015 06/19/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/15/2015 06/19/2015 1, 2 IP Performance Indicator Verification 71151 06/15/2015 06/19/2015 CDBI
- COMPONENT DESIGN BASES INSPECTION
1, 2 IP Component Design Bases Inspection 7111121 06/29/2015 07/04/2015 1, 2 IP Component Design Bases Inspection 7111121 07/20/2015 07/24/2015 1, 2 IP Component Design Bases Inspection 7111121 08/03/2015 08/07/2015 1, 2 IP Component Design Bases Inspection 7111121 08/17/2015 08/21/2015 TFPI
- TRIENNIAL FIRE PROTECTION
1, 2 IP Fire Protection [Triennial]
7111105T 10/19/2015 10/23/2015 1, 2 IP Fire Protection [Triennial]
7111105T 11/02/2015 11/06/2015 EP
- EP EXERCISE INSPECTION
1, 2 IP Exercise Evaluation 7111401 02/08/2016 02/12/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/08/2016 02/12/2016 1, 2 IP Exercise Evaluation - Scenario Review 7111408 02/08/2016 02/12/2016 1, 2 IP Performance Indicator Verification 71151 02/08/2016 02/12/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/07/2016 03/11/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/07/2016 03/11/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 03/04/2015 09:41:13 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site North Anna Inspection / Activity Plan 03/01/2015 - 06/30/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 1
1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/07/2016 03/11/2016 1, 2 IP Occupational Dose Assessment 71124.04 03/07/2016 03/11/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/07/2016 03/11/2016 1, 2 IP Performance Indicator Verification 71151 03/07/2016 03/11/2016 ISI
- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM
2 IP Inservice Inspection Activities - PWR 7111108P 03/14/2016 03/18/2016 RP
- RP OCCUPATIONAL INSPECTION WEEK 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/21/2016 03/25/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/21/2016 03/25/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/21/2016 03/25/2016 1, 2 IP Occupational Dose Assessment 71124.04 03/21/2016 03/25/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/21/2016 03/25/2016 1, 2 IP Performance Indicator Verification 71151 03/21/2016 03/25/2016 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 03/21/2016 03/25/2016 OL EXAM
- INITIAL LICENSE EXAM PREP
1 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES V23472 05/23/2016 05/27/2016 OL EXAM
- INITIAL LICENSE EXAM
1 NORTH ANNA JUNE 2016 INITIAL EXAM AT POWER FACILITIES V23472 06/20/2016 07/01/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.