ML19309G965
| ML19309G965 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/21/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19309G966 | List: |
| References | |
| NUDOCS 8005080068 | |
| Download: ML19309G965 (2) | |
See also: IR 05000328/1980002
Text
'
.
fY
f **o:q'o*
,. ,
'I
UNITE 3 STATES
!
8
NUCLEAR REGULATORY COMMISSION
8
- n
$
E
REGION 11
'
l'
O[
101 MARIETTA ST
N.W., SUITE 3100
,
o,
80 050 8 0 0fe%
%*****o
MAR 211980
y
ATLANTA, GEORGIA 30303
'.
<
.
..
l
In Reply Refer To.
i
!
RII:TDG
50-328/80-02
Tennessee Valley Authority
J
,
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by T. D. Gibbons of this office on
March 5-7, 1980 of activities authorized by NRC Construction Permit No. CPPR-73
'
for the Sequoyah Nuclear Plant facility, and to the discussion of our findings
held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
,
I
personnel, end observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
s
. . . .
,
C. E. Nu
y, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
(See Page 2)
.
~
,
.
-
s
a
.
_ _ _ _ - -
,
_ _
- _ . _ _ - _ . . . ._. . _ .
_ . . . . . - _
.
e
)
{
Tennessee Valley Authority
-2-
WUlR 211980
N
Enclosure:
.,
Inspection Report No. 50-328/80-02
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
Construction Engineer
Post Office Box 2000
Spring City, TN 37381
E. G. Beasley
^
Tennessee Valley Authority
309 Grant's Building
Knoxville, TN 37902
.
%
.#
4
e
t
I
1
-
N
~
'
l
'
.
1
-