ML19309G965

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-328/80-02 on 800305-07.No Noncompliance Noted
ML19309G965
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19309G966 List:
References
NUDOCS 8005080068
Download: ML19309G965 (2)


See also: IR 05000328/1980002

Text

'

.

fY

f **o:q'o*

,. ,

'I

UNITE 3 STATES

!

8

NUCLEAR REGULATORY COMMISSION

8

  • n

$

E

REGION 11

'

l'

O[

101 MARIETTA ST

N.W., SUITE 3100

,

o,

80 050 8 0 0fe%

%*****o

MAR 211980

y

ATLANTA, GEORGIA 30303

'.

<

.

..

l

In Reply Refer To.

i

!

RII:TDG

50-328/80-02

Tennessee Valley Authority

J

,

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on

March 5-7, 1980 of activities authorized by NRC Construction Permit No. CPPR-73

'

for the Sequoyah Nuclear Plant facility, and to the discussion of our findings

held with G. G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

,

I

personnel, end observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

l

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

s

. . . .

,

C. E. Nu

y, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

(See Page 2)

.

~

,

.

-

s

a

.

_ _ _ _ - -

,

_ _

- _ . _ _ - _ . . . ._. . _ .

_ . . . . . - _

.

e

)

{

Tennessee Valley Authority

-2-

WUlR 211980

N

Enclosure:

.,

Inspection Report No. 50-328/80-02

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, TN 37381

E. G. Beasley

^

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

.

%

.#

4

e

t

I

1

-

N

~

'

l

'

.

1

-