FEB 2 ? EER

..

Finrida Power Corporation ATIN: Mr. J. A. Hancock Vice President Nuclear Operations P. O. Box 14042, full Stop C-4 St. Petersburg, FL 33733 Gentlemen:

Subject: Report No. 50-302/81-23 This refers to the routine safety inspection conducted by Mr. T. Stetka, of this office on October 24 - December 2,1981, of activities authorized by NRC Operating License No. DPR-72 for the Crystal River facility. Our preliminary findings were discussed with Mr. D. Poole and other members of your staff at the conclusion of the inspectio Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector During this inspection it was found that certain activities under your license appear to violate NRC requirement These items and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A. With regard to violation B, corrective actions to prevent recurrence were completed prior to conclusion of this inspection; therefore, a reply is not requested for this ite Elements to be included in your response are delineated in Appendix '

During the inspection it was found that certain activities under your license appeared to deviate fran commitments and have safety significance. This item identified in the Notice of Deviation enclosed herewith as Appendix B. Please provide us in writing within 30 days of your receipt of this letter your comments including a description of corrective actions that have been or will be taken, corrective actions which will be taken to avoid further deviations and the date your corrective actions were or will be canpleted.

j We have examined actions you have taken with regard to previously identified enforcenent matters and unresolved items. The status of these items is discussed

'

in the enclosed repor In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this lette Such application must be consistent with the requirements of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork hduction Act of 1980, PL 96-51 PDR ADOCK 05000302 G PDR

- 1

... -.

-

. FEB 2 21992

'

Florida Power Corporation 2 Should you have any questions concerning this letter, we will be glad to discuss them with yo

Sincerely, R. C. Lewis, Director Division of Resident and Reactor Project Inspection Enclosures: Appendix A, Notice of Violation Appendix B. Notice of Deviation Inspection Report No. 50-302/81-23 cc w/ encl:

D. G. Ihrdis, Acting Manager Nuclear Licensing D. C. Poole Nuclear Plant Manager bcc w/ encl: