IR 05000302/1982007
| ML20050D601 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/05/1982 |
| From: | Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20050D596 | List: |
| References | |
| 50-302-82-07, 50-302-82-7, NUDOCS 8204120354 | |
| Download: ML20050D601 (1) | |
Text
p ay
.
.
,
UNITED STATES o"
o
-
g, 8"
NUCLEAR REGULATORY COMMISS'ON o
$
E REGION 11
o 101 MARIETTA ST., N.W., SUITE 3100 k
ATLANTA, GEORCIA 3o3o3 o
APR 0 61982 Report No.
50-302/82-07
,
Docket No.
50-302 License No.
DPR-72 i
Licensee:
Florida Power Corporation 3201 34th Street, South St. Pecersburg, FL 33733 Facility Name:
Crystal River 3 Inspection at:
Crystal River, FL Inspection conducted: March 8-12, 1982 Date of Last Physical Security Inspection Visit:
December 7-11, 1981 Type of Inspection:
Unannounced Physical Security Inspect T
GNm t//Sh{2.
' t.Y. MooFe, PhysTcal Security Inspector Date 61gned Approved by:
[
4 1
~
D. R. McGu~lre, Chief, Physical Security Section Ofte Signed Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Included review of previous enforcement matters; security.
program audit; records and reports; testing and maintenance; security system power supply; detection aids-vital areas; and communications.
The inspection fnvolved 35 inspection hours on site by one NRC inspector.
Four inspection hours were accomplished during offshift periods.
Results: Within the areas examinea, the licensee was found to be in compliance with NRC requirements.
h i
E'iCI.0SL"nE CON'IAIN3 SAFEGUARDS INFORVATION.
,
!
UPON SEPARATION THIS PAGE IS DECONTROLLED.
l
!
TT d - _ 5 7 l
S-72 Copy A 4 of S
Copies W
Pages 020406 This Document is not to be s'
f Og4h 05000 reproduced without specific
.
P approval of IEtII
g i o
.
.
.
..
.
_ _,. _. _...-__ _ _ _