IR 05000302/1982027

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-302/82-27 on 821024-28.No Noncompliance Noted.Major Areas Inspected:Site Orientation, Security Plan & Implementing Procedures & Security Organization & Mgt.Details Withheld (Ref 10CFR73.21)
ML20028A513
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/16/1982
From: Mcguire D, Moore D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20028A507 List:
References
50-302-82-27, NUDOCS 8211220250
Download: ML20028A513 (1)


Text

{{#Wiki_filter:. cAFEGUARDS INFORMATION "

  1. g%g UNITED STATES

. o NUCLEAR REGULATORY COMMISSION 8' FIEGION 11 o N n$ 101 MARIETTA ST., N.W., SUITE 3100 "o

ATLANTA, CEoRGLA 30303

November 17, 1982 %**..+f Report No. 50-302/82-27 Docket No. 50-302 License No. DPR-72 Licensee: Florida P'wr Corporation 320134th Street, South St. Petersburg, FL 33733 Facility Name: Crystal River 3 Inspection at: Crystal River, FL Inspection conducted: October 24-28, 1982 Date of Last Physical Security Inspection Visit: August 16-20, 1982 Type of Inspection: Unannounced Physical Security Inspecto bid Il[[([h D. E.

obrW, sical Security Inspector Da'te ' Signed Approved by: I/ Y \\ lh/d L D. R. McGuire, Chief, Physical Protection Section Date Signed g Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Included Site Orientation; Review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers-Protected Areas; Physical Barriers-Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Areas; Detection Aids-Vital Areas; Alarm Stations; Communications; General Requirements for Personnel; Additional Requirements for Power Reactor Personnel; and Safeguards Contingency Plan Implementation Review.

The inspection involved 34 inspector hours on site by one NRC inspector. The inspection was begun during an offshift period; four inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.

N INCLOSURE CONTAINS 821117

h0[K0500030g " " " " " " "" R O PDR " """zco"mouro.

acris c SAFEGUARDS INFORMAT10ly - - }}