Forwards IE Insp Rept 50-302/81-23 on 811024-1202 & Notices of Violation & Deviation
ML20054K360
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/29/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML20054K339 List:
References
NUDOCS 8207010469
Download: ML20054K360 (2)


See also: IR 05000302/1981023

Text

-

.

,

lUlar

J AN 2 91982

Florida Power Corporation

ATTN: f tr. J. A. Hancock

Vice President Nuclear Operations

P. O. Box 14042, liail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

Subject: Report No. 50-302/81-23

This refers to the routine safety inspection conducted by tir. T. Stetka of this

office on October 24 - December 2,1981, of activities authorized by NRC

Operating License No. DPR-72 for the Crystal River facility. Our preliminary

findings were discussed with Mr. D. Poole and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

'

During this inspection it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

,

requirements are listed in the Notice of Violation enclosed herewith as

'

Appendix A. With regard to violation C, corrective actions to prevent recurrence

<

were completed prior to conclusion of this inspection; therefore, a reply is not

requested for this item. Elements to be included in your response are delineated

in Appendix A.

During the inspection it was found that certain activities under your license

appeared to deviate from commitments to the Commission and have safety

significance. This item identified in the Notice of Deviation enclosed herewith

as Appendix B. Please provide us in writing within 30 days of your receipt of

this letter your comments including a description of corrective actions that have

i been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date your corrective actions were or will be completed.

j We have examined actions you have taken with regard to previously identified

l enforcement matters and unresolved items. The status of these items is discussed

l in the enclosed report.

j In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

'

will be placed in the NRC's Public Document Room unless you notify this office,

l by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

8207010469 820618

PDR ADOCK 05000302 PDR

G

l -

r

. o

.

Florida Power Corporation 2 j AN 2 91982

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of 11anagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

R. C. Lewis, Director

l Division of Resident and Reactor

Project Inspection

i

Enclosures:

1. Appendix A, Notice of Violation

2. Appendix B, Notice of Deviation

3. Inspection Report No. 50-302/81-23

cc w/ encl: .

D. G. tiardis, Acting Manager

Nuclear Licensing

D. C. Poole, Nuclear Plant Manager

RII:RRPI RII:RRPI RII:RRPI RII* I RI RPI #

\RO wp VLo .

TStetka:dt JRogge VBrownlee PJKe ogg RC wis '

12/ /81 12/ /81 12/ /81 4f/ /81 lI/ /81

'

\'YL li stivt 1/rQp f y

.

A .

.

. .

_ _ _ _ _ _ _ _ _ _ _ _ _ _